Suchergebnisse für "Factsheet: Energietechnologien gestalten, die für alle sinnvoll und nutzbar sind"
Benchmarking - sustainability of housing subsidies across the federal provinces

Systematical description, analysis and comparison of all ecological, economic and social sus-tainability of the systems aspects of housing subsidy for new buildings and the renovation of buildings across the federal provinces of Austria; an analysis of regional-economic effects and a statistical-econometric analysis of the allocation effects of housing subsidies.
Green Biorefinery

An innovative Technology Concept for the Creation of a Sustainable Supply of Raw Materials within the "Fabrik der Zukunft" Subprogram
Forschungsforum
1/2004
Herausgeber: BMVIT
Englisch, 6 Seiten
Downloads zur Publikation
Sustainability Reporting - Guidelines for Sustainability Reporting based on reporting processes of VA Technologie and Österreichische Bundesforste
Scientific attendance of sustainability reporting processes in two partner enterprises (VA Tech and ÖBf AG). Development of the guideline "Reporting about Sustainability" based on these practical experiences.
Itz Smart – Carbon neutral city district development Itzling – Implementing innovation and technology via co-operative process design
The goal of the project “Itz Smart” is to tie in with existing activities and to consistently develop Itzling as a residential location further. In the test and demonstration area, sustainable residential quarters with trendsetting solutions for mobility are developed in the zone of the transport axis (railway and Schillerstraße) and along the local supply axis (Itzlinger Hauptstraße). The consideration of housing and mobility with regard to the aspect of “city of short ways“ also entails a discussion of determined mixed utilisation and the development of such residential quarters.
Integrated ecological and energy-oriented refurbishment of service buildings - development of quality criteria and tools within a pilot project (LCC-ECO)

Formulation of a procedure for the general refurbishment of service buildings and development of guidelines to support building owners and facility-managers in each stage of the refurbishment process in order to reach an integrated ecological and energy-oriented refurbishment.
Facade Integrated Solar Collectors

Within the framework of this project system-, structural- as well as building physical basis theories should be elaborated, which will serve as a basis for constructional and aesthetically attractive solutions for the production of facade integrated solar collectors without thermal separation. The recyclability of the materials used and resource efficiency play a central role when it comes to the development of constructional solutions.
Energy Services as an Integral Part of the Distribution
Concept development for the implementation of efficient energy services as part of grid connected energy supply to increase energy end-use efficiency.
Building planner of tomorrow

Practical courses "Integrated and sustainable planning of buildings. Results of the Austrian program - Building of Tomorrow". For architects, civil engineers, environmental engineers and other building professionals within masters programmes.
StromBIZ - demonstration projects: business models for decentralized electricity generation and distribution
Feasible business models to utilize locally generated renewable energy are expected to induce a tipping point for the "Energy Turnaround" in Austria. Within the proposed project a number of demonstration PV plants on residential and non-residential buildings had been realized. On this basis new approaches of business cases had been developed, implemented, tested and disseminated.
"gugler! build & print triple zero" - Subproject 8: Leuchtturm gugler – Ökoeffektive Plusenergiedruckerei
On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building had been developed.
Energy-efficient army barracks

Holistic sanitation concepts for three selected army barracks belonging to the Austrian armed forces to achieve the standard of a low-energy house. An increase in energy efficiency and corresponding models for implementation agreed with large-volume buildings with due consideration to the special conditions prevalent within the Austrian armed forces.
IEA Cities Task 2: Data for Urban Energy Planning (Working period 2025 - 2029)
Cities consume 60–80% of the globally produced energy and play a central role in the energy transition. However, they face challenges such as insufficient data, missing methodologies, and legal barriers. The project offers practical solutions, best practice examples, and tools for urban energy planning. The focus is on international knowledge exchange, improved data access and quality, as well as collaboration with multipliers and municipalities.
KLIMADEMO VIS-A-VIS: Participatory realization of a climate-neutral demonstration building Vis-à-Vis
Participatory development of a pilot project at the interface between climate neutrality, affordability and multi-storey wooden housing based on well-founded decision-making bases in terms of renewable materials and renewable energies. The result is a multipliable carbon neutral building and the dissemination of carbon neutrality know-how to a larger audience.
IEA SHC Task 53: New Generation Solar Cooling & Heating Systems
Within the framework of the IEA SHC Task 53 'New Generation (NG) Solar Cooling & Heating Systems', solar-electric and solar-thermal air-conditioning systems were investigated. The main objective was the development and documentation of reliable and economical NG system solutions. A comprehensive comparison of different NG systems as well as the elaboration of support measures for the market launch are core results of the international cooperation.
Photovoltaic Power Systems - Cooperation within the scope of IEA
The "Photovoltaic Power Systems Programme" of the "International Energy Agency" (IEA) offers the world wide leading research platform in Photovoltaics. The Austrian participation at IEA PVPS is a important link to the international PV-society.
Development of an business segment called "Waldbiomasseversorgung-SÜDOST" through senior utilization of non active wood
A sharp increase in the Austrian industry's demand for wood, and in particular the rising need of biomass plant operators for energy wood, has led to a fundamental transformation of the timber market from a buyer's to a seller's market. New marketing opportunities in terms of a range of wood energy products, combined with an efficient way of harvesting, have opened up new economic prospects for the forestry industry.
IEA SHC Task 56: Building Integrated Solar Envelope Systems for HVAC and Lighting
IEA SHC Task 56 focused on the critical analysis, simulation, laboratory testing and onsite monitoring of envelope systems entailing elements that use and/or control incident solar energy. The central task was the integration of HVAC and lighting systems into a building’s Solar Envelope solution through a systemic approach.
Office Building WKS - Plus Energy Office Building in Ernstbrunn
The new office building (headquarter) of Windkraft Simonsfeld AG in Ernstbrunn (Lower Austria) is planned as a plus energy building. From this excellent starting conditions it is intended to make seven more steps to explore innovative options for energy plus buildings.
Webinar Balanced Heating & Cooling with Radiative Surfaces: Resilient answers to upcoming cooling needs, with new questions for the Comfort Community (2020)

Webinar zum Thema Resilient Ventilative Cooling in der Praxis
Herausgeber: INIVE EEIG – International Network for Information on Ventilation and Energy Performance
Englisch
Demonstration project senior-housing concepts for new construction and renewal in Vienna, Menzelgasse

Acompagning the process of realisation and settlement of two projects of senior-housing (new construction and renewal), documentation and general assumptions.