Suchergebnisse für "Factsheet: Energietechnologien gestalten, die für alle sinnvoll und nutzbar sind"

Haus der Zukunft

"gugler! build & print triple zero" - subproject 5: Ecoeffective building

On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building will be developed.

Haus der Zukunft

GreenPlusSchool@urban - Highly efficient facade and roof greening in combination with PV; optimal solution for energy efficiency in overall environmental consideration

In this project, different building-greening systems and plant/substrate types, combined with various PV modules, had been examined on a Viennese school. The influence on the hygrothermal behaviour of the building, energy-saving potential, humidity, shading, noise reduction, water retention and heat island effect are being scientifically explained. The students of the school will also be involved.

Fabrik der Zukunft

"Emerging Sustainability" - Summeracademy `09 for sustainable management

"Heading towards Sustainability" is the central motto for a six-day summer academy. During July 2009 "Emerging Sustainability" will offer an inspiring and activating framework for learning how to successfully implement sustainable development in companies.

Haus der Zukunft

PEAR – Test facility for energy efficient automation and control of buildings

The energy demand calculated in the design phase often differs from measured values in the actual building operation. This projects reviews building automation and operation by presenting a solution how to assess energy efficiency of control strategies in the fields of air conditioning systems, concrete core activation and free cooling. The results are implemented in the demonstration building "Post am Rochus".

Internationale Energieagentur (IEA)

IEA ES Annex 49: Low Exergy Systems for High-Performance Buildings and Communities

The objective of Annex 49 is the development of approaches for reducing the exergy demand of buildings, so as to reduce the CO2 emissions of the building stock and support structures for sustainable and reliable energy systems in the building sector. To achieve the objectives of Annex 49, the following activities have been carried out:Application of exergy analysis and providing tools, guidelines, best-practice examples and background information for planners and decision makers in the fields of construction, energy and politics Support of cost-efficient low-energy/exergy measures for renovation and new building taking into account both the residential and the service sector Promotion of exergy-related performance analysis of buildings, particularly from the perspectives of communities / regions

Nachhaltig Wirtschaften

Development of a Cost-Benefit-Tool: costs and benefits of energy efficient and ecologic buildings

Development of a cost-benefit-tool which reaches beyond a pure cost approach and also recognizes the benefits of a building for its inhabitants and users. The inclusion of benefits is based on existing evaluation systems, especially on the Austrian building evaluation system TQB - Total Quality Building, which has been revised in 2009.

Haus der Zukunft

Data for schooling focused on passivehouses

Elaboration of high quality data about Passive Houses technology, to be used in training programs for building related professionals.

Nachhaltig Wirtschaften

IEA Bioenergy Task 40: Deployment of biobased value chains (Working period 2022 - 2024)

Bioenergy Task 40 traditionally focused on international trade and supply chains of biomass for bioenergy. Starting in 2018, the systems view was broadened, also to better meet Austrian requirements. The supply chain focus was maintained, but with a broader premise: The establishment of bio-based value chains for a sustainable and fair bioeconomy.

Nachhaltig Wirtschaften

The Sahel Project

Silicate technology for the improvement of water uptake and nutrient storage in marginal soils; field tests in the northern Sahel region in Senegal

Fabrik der Zukunft

Thermal detection of cracks on glowing wire during the process of rolling with regard to reduction of rejections

Developing a non-destructive and fully automated testing to detect surface cracks and laps in rolled wires during the production at temperature values of 800-1000°C and at a material speed of 30-40 m/s, with regard to reduction of rejections.

Haus der Zukunft

Sprayed-on and Plaster-covered Cellulose-insulation without vapour barrier

Investigations on the fundamental suitability of sprayed-on and plaster-covered cellulose insulation for thermal insulation of buildings.

Stadt der Zukunft

VITALITY - Energy optimised design rules and integral planning approach for building-integrated photovoltaics in urban areas

The VITALITY project aims to provide supporting tools, design rules and robust information in the early decision and design phase of building projects. By providing the right information at the right time, building-integrated photovoltaics (BIPV) is part of the discussion in the concept phase and the implementation is strongly prepared and supported.

Haus der Zukunft

Timber construction for high-density housing

Development of technical and economical solutions for high-density housing in timber construction under consideration of future regulatory developments (case study of a 5-story housing complex in Vienna).

Fabrik der Zukunft

ZERMEG III - Decision guidance for the visualisation of the achievements of sustainable corporate strategies

ZERMEG III creates a virtual factory of the future from the combination of the research results of different projects. This model will be used to generate real experience for managers in experimenting taking organisational and technical decisions with regard to a sustainable development.

Stadt der Zukunft

SUBURBAHN – test- and demonstration-area for urban development and mobility around public transport stations in the central area of Upper Austria

Targeted, process-oriented conception for the implementation and operation of a test- and demonstration-area for urban development and mobility in Ansfelden involving relevant scientific stakeholders, local and regional stakeholders, decision-makers as well as the interested public according to the living lab approach.

Stadt der Zukunft

ECC – EnergyCityConcepts – Development of a methodology and concept for the implementation of sustainable energy systems in cities by the example of Gleisdorf and Salzburg

In the context of this project two concrete model regions (small city Gleisdorf and urban city quarter Salzburg-Schallmoos) will be developed and tested with new methodical approaches (interdisciplinary urban and regional energy planning, modeling and simulation). An ambitious political commitment of both model regions is a 100% renewable or rather CO2-neutral energy supply.

Haus der Zukunft

ÖkoInform:2 - Platform for Exchange of Information in Green Building

A platform for the exchange of information to promote the better integration of ecological materials and renewable resources in the research programme "Building of Tomorrow"

Fabrik der Zukunft

"Sustainable E-Spirit" - Entrepreneur: People who show sustainability and joined-up thinking - a workshop for young people and teachers

This project links sustainability and entrepreneurial spirit with the methodof joined-up thinking. A workshop and a workshop book will be developed.

Energiesysteme der Zukunft

IEA Bioenergy Task "Biogas"

Evolution and circulation of the biogas extraction of organic materials through Austrian attendance and collaboration in an international net as well as management of task-emphases

Haus der Zukunft

Smart Services for resource optimized energy systems in urban districts

The concept of a smart city explicitly refers to a sustainable city development. To apply smart city concepts in practice, it is essential to develop practice- and profit-oriented business models (smart services), which at the same time generate social and ecological benefits. Smart services were developed for the application in three specific city development areas and their practicability was verified in a comprehensive stakeholder process with decision makers.