Suchergebnisse für "Factsheet%3A Energietechnologien gestalten%2C die f%C3%BCr alle sinnvoll und nutzbar sind"
Innovative energy services in the sector trade and industry
Systematic reduction of THG in the sector trade and industry through market economical energy services. Research project to improve the energy efficiency of the end user as well as the integration and utilization of renewable energy in the energy service models.
IEA EBC Annex 70: Building Energy Epidemiology: Analysis of Real Building Energy Use at Scale
Within the framework of the IEA-EBC Annex 70, causes of deviations between calculated and actual energy consumption in buildings were empirically investigated and requirements for data quality, characteristics and security were developed. Furthermore, recommendations were developed regarding the use of internationally uniform standards and methods for data collection, processing and evaluation.
Stanz+ - An innovative, energy-flexible plus-energy district - the centre of the village Stanz
Stanz+ is working on the implementation of an energy strategy for structurally weak municipalities with specific measures for revitalisation and re-densification in the building stock as well as the integration of renewable energy sources in the municipality of Stanz im Mürztal (Styria). The project includes multipliable approaches towards energy autonomy, hybrid use of energy networks for flexible usage and an energetic revitalisation of the village centre with the involvement of users in the "Rural Pioneers Community" for the usage of energy services.
Chemical modification of wood particles for high value wood plastic composites
Based on promising preliminary work feasibility and recycling strategy of the modifying process shall be evaluated economically and ecologically.
Plus Energy Melk - Path for the realization of Plus-Energy-Districs in Melk
The city of Melk has set itself the goal of playing a pioneering role in renewable energy supply and climate protection. In this context, an initiative aimed at implementing Positive Energy Districts. Two urban development projects are currently underway to examine under which framework conditions, technical and organisational solutions Positive Energy Districts can be realised. A proactive participation process aims at informing developers and investors as well as other stakeholders about the realization of PlusEnergy concepts.
Development of microreactor technology for enzymatic processes and application for lactose conversion
Accelerated design of a pilot scale process for enzyme-catalyzed hydrolysis of lactose in whey using microreactor technologies. Development of a prototypical immobilized enzyme microreactor for optimisation of enzymatic reactions; improved gathering of process-relevant parameters for reduced time-to-market and decision support for investment decisions.
"gugler! build & print triple zero" - subproject 4: energy concept Gugler
The energy concept led Gugler in frame of the conversion and expansion of the company towards plus-energy standard. Significant measures ware a consequent maximum reduction of the energy demand, optimal utilisation of industrial waste-heat, maximum consumption of on-site energy sources, integrated energy production, ecologic load management with comprehensive response- and storage-techniques.
greening UP! Sustainable green maintenance, maintenance, maintenance of vertical greenery including legal aspects
Based on extensive surveys and analyses of existing vertical building greenery in outdoor areas (floor and system-bound façade greening) and vertical interior greenery, the project developed tailor-made green care, maintenance and repair concepts and addresses legal aspects. The "greening UP!" Knowledge pool with concrete recommendations and clearly presented findings as well as the conception of a digital tool for the "First Green Aid" complete the project.
The Passive House in Practice

Strategies to open markets for passive houses in the east of Austria
EASEY - Ecological And Social EfficiencY
Developing an integrative concept for the evaluation of sustainability achievements of enterprises noted at Vienna's stock exchange.
e80^3-Buildings - Sub project 2: Concept development
Based on the selection of suitable demonstration projects in Subproject 1 an innovative concept for passive and active building envelopes and energy supply of so called "Plus Energy Buildings" (renovation) has been developed.
digiactiv - digital transformation for more interactivity in MEP-(mechanical, electrical and plumbing-)planning
The aim of the digiactiv project was to improve the interoperability between the different stakeholders in the building construction sector using open and neutral semantic data models. With digital transformation processes, digiactiv helps to increase the quality of planning and the operation of buildings, as well as to minimize the interface risk between various stakeholders.
Architecturally Diverse, Energetic Renewal

Post War Modernist Buildings Under Monument Protection. A Comparative Analysis of Energy Efficient Renewal Case study: Open Air School Franklinstrasse, Wien 21
LivingMODELofTomorrow
Development of transparent, technical and economic models for medium and high volume residential buildings, with special focus on the non-profit sector. Topics such as generation living, teleworking as well as smart homes are developed in an integrated model, for dense structures as well as pavillons and townhouses. All models follow the three pillars of sustainability.
Office Building WKS - Plus Energy Office Building in Ernstbrunn
The new office building (headquarter) of Windkraft Simonsfeld AG in Ernstbrunn (Lower Austria) is planned as a plus energy building. From this excellent starting conditions it is intended to make seven more steps to explore innovative options for energy plus buildings.
PH Office - Criterions for energy-efficient office buildings
The passive house standard and energy-efficient building technologies are getting increasingly important for office buildings, too. However, standardisation is not completed on the same level as known from the residential building sector. The project at hand brings in definitions and makes a suggestion on a standardised calculation method for office buildings in passive house quality.
Energy centre for the thermal conversion of biogenous raw materials and residues of a region to produce heat, electricity, SNG and liquid biofuels II
Production of synthesis gas from biological fuels and residues using steam blown gasification. This synthesis gas will be used for polygeneration especially for heat, power, gaseous and/or liquid fuels.
3D*3B - 3D-Concret Printing, Reinforcement for low carbon and bending stressed structures.
The project is about 3D printed structural elements and their integration in building structures. The focus is predominantly set on bending stresses structural elements like panels and slabs. Results will point out technical, logistic and climate relevant aspects.
Cooperative Refurbishment

Models for participation of owners and tenants in ecological refurbishment of multi floor buildings
RAINBOW 2
Application and expansion of knowledge gained in the project Rainbow1 for the production of new, functionalised fibres using renewable resources as well as other fibre manufacturing methods in a pilot plant scale production.