Suchergebnisse für "Factsheet%3A Energietechnologien gestalten%2C die f%C3%BCr alle sinnvoll und nutzbar sind"
Summer University Vienna: Green.Building.Solutions.
26. July - 17. August 2014
Wien, AT
First hand ecological knowledge and engineering expertise bundled in a three-week program in the capital of energy efficient building: Vienna. Think sustainable, take care of your future - now.
RE-FORM earth - Earth Building for Building Sector Transformation
In order to promote the use of earth, the RE-FORM earth project is creating a planning basis for the construction of structures and buildings containing earth. In order to counter uncertainties regarding the health effects of earth building materials, a comprehensive program is being carried out to investigate radiation exposure and potential pollutants in earth. By erecting a temperature-controlled rammed earth wall in a test room with subsequent measurements, the aim is to determine the extent to which the material can contribute to healthy indoor air due to its moisture-regulating properties and help to balance out energy peaks.
The Box - Thermal High Performance Decoupling - Next Generation Thermal Break Technology
The project pursues the overall strategic objective "solution of the problem-inducing heat bridge". For this purpose, the thermal bridging losses should be reduced by the factor of 15 in contrast to the state of the art. The significant increase in efficiency should rely on existing system solutions, but incorporating a new holistic view in terms of construction, geometry and materials.
Smart Gas Grids - Intelligent Gas Networks of the Future
The basic principles of "Smart Gas Grids" will be investigated and practical issues and deployment strategies will be studied in detail. Furthermore, together with the relevant stakeholders, a "Vision- and Strategy Paper" and a draft for a "Strategic Research Agenda" will be developed.
"gugler! build & print triple zero" - subproject 2: building with recycros
Building with recycros is working out basics in order to close the cycle of materials in the building sector as well as to increase the usage of recycled materials (recycros). The existing material cycles in the building sector are going to be analysed. Furthermore, there will be a catalogue presented, covering the actual situation of which materials are used in today´s engineering and how the waste is treated. The project will be completed with a summary of results and a proposal of concrete materials and constructional systems for the building project gugler.
SUMMIT, Sustainable Management Methods Integrating Tool-Kit and Prepare Plus
A individual company and process evaluation defines the tools-mix of sustainable orientated management methods implemented in the companies. The well know in Instrument Prepare will be further developed adding the innovation strategy TRIZ "systematic inventing", making the new Prepare plus instrument.
Green Biorefinery - Primary Processing and Utilization of Fibres from Green Biomass
Tests on optimisation of the essential process unit mechanical fractionation of the primary raw material "green biomass" into a liquid and a solid - fibres containing - fraction. Furthermore, lab and pilot scale tests with respect to technologies and processes for primary processing of the solid fraction (e.g. technologies for obtaining specified well defined fibre fractions, reduction of odour etc.). Finally, lab and pilot scale tests regarding manufacturing of prototype fibre products (fibreboards and adhesives & fillers for the construction sector) based on specific well defined fibre fractions from green biomass as primary raw material.
Production of bioethanol from lignocelluloses using steam explosion
By means of suitable thermomechanical pretreatment a process for the production of bioethanol on the basis of the waste compounds straw and wood will be developed. Regional plants will use local raw materials for local energy production.
6D BIM-Terminal: Missing Link for the development of CO2 neutral buildings
The present project aims to close the gap between specialist consultants and Building Information Modeling (BIM) applications. For that, relevant data for cost estimation, scheduling construction planning and management or sustainable building operation and facility management, shall be added automatically to BIM elements and imported into the respective specialist planning software. This data exchange shall be carried out using IFC interface according to ÖNORM A6241-2 and the properties of the ASI properties server via a central platform, the "6D BIM-Terminal".
SOL4 business and training center Eichkogel
Demonstration project for sustainable construction of a working and living environment
Adsorbent Materials of Residues from Corn Cob
Development and testing of processes to produce adsorptive materials from agricultural residues of corn production with focus on corn cob grit as oil bonding agent (e.g., applicable to the remediation of oil spills).
M-DAB - Digitise, analyse and sustainably manage the city's material resources
The research project investigates how digital technologies can support us in determining the existing and future material resources in construction qualitatively (building materials and their recycling) and quantitatively (quantities of building materials).
Investigations on the Fundamental Suitability of Sprayed-on and Plaster-covered hygrothermic active Cellulose-Compact-Soundabsorber
Development of a new kind of spray-on and plastered noise absorber on the basis of cellulose from recycled paper. The absorber system preferably attenuates the low-frequency range, that can usually only be controlled with rather complex systems, and can also be used where conventional absorbers could cause problems due to impermissible water vapour condensation.
Heat supply of development areas through supplementary solar supported near heat nets
Evolution of technical solutions for modular open ended near heat nets for development areas that are realized in several configuration levels. Adjusted solar heat and biomass solutions are supposed to be defined by modular construction and decentralized integration.
Upgrading of biogas for the gas distribution system of Salzburg
Development of a cost-effective cleaning unit, free of waste-products, for the upgrading of biogas to natural gas quality. Elaboration of the basis for a demonstration project injecting biogas into the gas distribution system of Salzburg.
PH Office - Criterions for energy-efficient office buildings
The passive house standard and energy-efficient building technologies are getting increasingly important for office buildings, too. However, standardisation is not completed on the same level as known from the residential building sector. The project at hand brings in definitions and makes a suggestion on a standardised calculation method for office buildings in passive house quality.
Design of pumped storage schemes
Development of a new surge tank system for pumped storage schemes (PSS) for the governing of the changing requirements in electricity networks due to integration of renewable, volatile energy sources.
Webinar: The past, present and future for biomass gasification
30. January 2020
Webinar - online, AT
The IEA Bioenergy Webinar Series are dedicated to various topics in the field of bioenergy. This time the past, current situation and outlook into the future of thermal gasification are discussed.
Innovative energy services in the sector trade and industry
Systematic reduction of THG in the sector trade and industry through market economical energy services. Research project to improve the energy efficiency of the end user as well as the integration and utilization of renewable energy in the energy service models.