Suchergebnisse
Gründerzeit with future - demonstration project 2: ROOFJET Wißgrillgasse - sustainable solution for improving the thermal-energetic performance of a typical historical building in Vienna
The main aim of the project ROOFJET Wißgrillgasse is a building refurbishment by a factor of 8 which demonstrates that even historical buildings can be refurbished to lowest energy standard.This demonstration project shows a holistic and sustainable refurbishment concept for a special type of buildings with innovative technical and organizational solutions.
LifeCycle Tower - Energy efficient prefabricated multi-storey timber houses
Based on the results of previous research projects, the project at hand deals with the development of a wooden prefabricated module construction for energy efficient office buildings with up to 20 storeys. This sustainable system ensures cost certainty through the whole life cycle of the building.
Development of a new generation of grid-connected PV inverters
Improvement of operational parameters (efficiency, quality of current waveform, reduced size and weight) and reduction of manufacturing costs
Gründerzeit with future - subproject 5: Documentation and monitoring
The main aim is the documentation and monitoring of the demonstration projects within the scope of the project "Historical buildings of tomorrow" with regard to the technical implementation, investment and operation costs and to the energetic performance. All demonstration projects will be accompanied by an evaluation process regarding occupants' satisfaction and the refurbishment process. Beyond that, legal constraints for innovative refurbishment of historical buildings will be documented and proposals for adaptations of the rental law and refurbishment subsidy schemes will be developed.
"gugler! build & print triple zero" - subproject 3: recyclable constructing
Development of basic principles and proposals for highly recyclable constructions. A catalogue with main principles of recyclable designing with a particular focus on material inherent bonding and joint techniques as well as a selection of constructions including ecological benchmarks, calculation of building physics plus costs was created.
BIGMODERN Subproject 7: Monitoring concept
Development of a pattern for comprehensive documentation of the project results. The concepts contain amongst others monitoring of energy consumption, resources, costs, functionality and comfort, etc.
"gugler! build & print triple zero" - Subproject 7: Integrated General Planning
The aim of the subproject 7 is to aggregate a "normal" general planning process with innovative additional services. In the spirit of integrated planning in the design a higher number of design parameters must be resolved. This is different to a classic planning process with linear and chronological lined up add ons.
AC/DC Office Buildings - Implementation of Electricity Networks with Alternating and Direct Current in Office Buildings - Feasibility and Energy Efficiency Potentials
Based on a literature and technology review this projects aimed to document and demonstrate already available and reasonable concepts for the implementation of electricity networks with alternating and direct current in modern office buildings. Focus of the study was to assess the feasibility in general and the energy efficiency potential in particular but it also documents necessary technical equipment and expected advantages and disadvantages. Additionally, important research questions for energy supply, energy distribution and application of direct current technologies were formulated.
Zero Carbon Village - energy autarcic settlement
Development and demonstration of a totally CO2 neutral and energy self sufficient residential area, produced in prefabricated straw bale constructions. The focus of the research is put on industrialized modular mass production of "Zero Carbon Houses", energy self sufficiency and the use of energy efficient and sustainable materials like straw.
Urban consolidation Lehen - Subproject 2: Development - intelligent E-Monitoring
In the oppositional subproject 2 technical and organisational requirements for the transformation of the innovative Smart Metering-concept will be developed. Through the connection of the application of Smart Metering with an active integration of the inhabitants over mutual communication the concept, which is planned for the key project Urban Consolidation Lehen stands out of other comparable antedated activities.
Connection of innovative strategies and technologies to a holistic, resources-friendly plus energy building (FUTUREbase)
On the basis of a construction project in Giefinggasse 4 in Vienna the combination of new, innovative strategies and technologies to an integrated, resources conserving plus energy building with high signaling and multiplication effect had been tested for feasibility. A regional, energetical bond between the buildings TECHbase, ENERGYbase and the Klima-Windkanal had been developed.
ECR Energy City Graz-Reininghaus: Urban strategies for the new conception, construction, operation and restructuring of an energy self-sufficient city district
The aim is the development of a valid set of specific values and a guideline as a basis for energy self-sufficient district development. Based on the results, a masterplan (energy-network) for the district Graz-Reininghaus shall be developed. Future-oriented "city-building-blocks" will be implemented as flagships of innovation.
aspern + Vienna's Urban Lakeside - sustainable urban development
The focal points of the largest urban development project in Europe are the topics public space and microclimate as well as cross-building energy supply. Landmark projects will be implemented in the areas residential buildings, office/industry buildings and mobility.
ECR Energy City Graz - subproject 2: Framework-Plan Energy City Graz-Reininghaus
Main project-issue is the scientific work and the demonstration of the vision of the energy self-sufficient, CO2-neutral city-district Graz-Reininghaus. The Framework-Plan Energy City Graz-Reininghaus shall stimulate an awareness-raising process towards energy-efficient and sustainable city-development.
Clay - Passiv Office-Building Tattendorf
The motivation for developing the project "Clay Passiv Office-Building Tattendorf" was the dissatisfaction with the situation of a great difference in the state of technology in three fields relevant to the research project: 1) sustainable production of energy , 2) sustainable energy conservation technologies and 3) use of sustainable building materials.
aspern Vienna´s Urban Lakeside - subproject 6a: Energy Consumption Monitoring
This subproject of the flagship project "aspern plus" derived the basis for a centralised monitoring of the energy consumption in Seestadt aspern.
SpeedReg - Prompt quality assurance of the commissioning process of buildings
The focus of the project is on quality assurance within the commissioning process with the aim to speed up and to improve the operational adjustment of newly constructed or comprehensively renovated buildings. The fragmented know-how which is hardly accessible for the relevant target groups will be consolidated and elaborated in the form of a practice guideline which will be directly applicable in commissioning processes in practice. In this way the project contributes to the development of a common, well-established standard for quality assurance within the commissioning of buildings.
Renew Building - Competence Building and Knowledge Transfer for Climate-friendly renovation with ecological and renewable materials
The project Renew Building provided knowledge about eco-friendly renovation to the target groups (planners, architects, students of architecture, etc.) through theory and practice classes, lectures, an e-learning platform, and in an online knowledge database.
e80^3-Buildings - Sub project 3: Development of technology and components
The main objective of the key project "e80^3" was to develop high-performance renovation concepts focusing on plus-energy-buildings. Afterwards these concepts were realized in at least one or two demonstration-projects.
Certified passive attic conversion of a typical building from the period around 1900
Conversion of an attic of a typical building from the period about 1900 to a passive attic with photovoltaic system and renovation of the existing building equipment. The aim is to keep the additional construction costs under 10 %, to avoid overheating in summer and to make possible a reproduction for the large amount of buildings from the same period.