Suchergebnisse
Ökologische Sanierung eines denkmalgeschützten Gebäudes mit Passivhaustechnologien
Ökologische Mustersanierung des Haidenhofes in Bad Ischl, Oberösterreich. Gebäudesanierung im Spannungsfeld zwischen Denkmalschutz und neuesten Passivhaustechnologien. Umgestaltung des ehemaligen Wohngebäudes zu einer Kunst- und Kulturakademie.
Energy package Kolpinghaus / Eco-Suite Hotel
The Kolping association’s dormitory for pupils and students has been extended. The energy demand of the newly constructed Eco-Suite Hotel is minimized by use of highly efficient components (such as LED lighting). Locally available energy sources (waste water heat and sunlight) are used and an on-site energy system is being created for the use of the heat energy surplus. Guests at Eco-Suite Hotel can experience life in a plus energy building.
Plus energy office building - Subproject 3: Austria's biggest plus energy office building
In course of the refurbishment of the Vienna University of Technology (Univercity 2015) Austria´s biggest plus energy office building is going to be built. This project intends to demonstrate not only the technical but furthermore the economical feasibility of plus energy office buildings. Within this building the plus energy concept is fulfilled by optimizing the power consumption of the whole building and the installation of Austria´s largest facade integrated photovoltaic plant.
Heat supply of development areas through supplementary solar supported near heat nets
Evolution of technical solutions for modular open ended near heat nets for development areas that are realized in several configuration levels. Adjusted solar heat and biomass solutions are supposed to be defined by modular construction and decentralized integration.
PV-Arc Detection - Circuit supervision using DC-Arc Detection in PV systems on dwellings.
It was the aim of this project to make a technology leap in the safe and realistic detection of DC arcs. In reality the variety of conditions of ignition is huge and therefore not covered by the standards and most available products. The focus of this project was the research of conditions of ignition, to derive new detection methods based on the outcomes.
Smart Services for resource optimized energy systems in urban districts
The concept of a smart city explicitly refers to a sustainable city development. To apply smart city concepts in practice, it is essential to develop practice- and profit-oriented business models (smart services), which at the same time generate social and ecological benefits. Smart services were developed for the application in three specific city development areas and their practicability was verified in a comprehensive stakeholder process with decision makers.
Identification of services, wood and non-wood products in sustainable forest management
The ecological, economic and social effects of services, wood and non-wood products on sustainable forest management, the marketing potential and the relevance of sustainable measures are analysed.
Strategy development for (technical / economical feasibility of) energy autarcic buildings
Development of a strategy for energy autarcic buildings with appropriate Technology solutions.
Entwicklung einer kontinuierlichen Wasserstoff-Carbon Nanotubes Demo-Produktionsanlage
Mit der Entwicklung einer kontinuierlichen Wasserstoff-Kohlenstoffnanofasern Produktionsanlage werden wirtschaftlich Kohlenstoff-Nanofasern produziert und gleichzeitig Zugang zu umweltschonend produziertem Wasserstoff geschaffen.
Urban consolidation Lehen - Subproject 3: Demonstration project - intelligent e-monitoring
The aim of the project was the implementation of an innovative energy consumption monitoring concept with the active integration of the residents and a study of the resulting effects on the energy consumption behaviour.
Construction Site SCHOOL - Sustainable Models for the Refurbishment of School Buildings?
In this research project, models for refurbishment and restructuring of school buildings were developed. The reconstruction concepts contain lists of measures for deploying sustainable building techniques and exemplary case studies for the reorganisation of buildings of different typologies.
ThinkHome: Improved energy efficiency based on artificial intelligence in future homes
ThinkHome is a networked controlled home of the future with the ultimate goal to optimise energy efficiency and user comfort at the same time. On this way, smart interaction between all building services is of utmost importance. Goals of this project include the definition of a comprehensive knowledge base that holds all relevant building data, the evaluation of control strategies based on artificial intelligence and machine learning, as well as agent based software engineering.
DAKTRis - Dynamic operational behaviour of absorption chillers in Trigeneration Systems
In the present project an absorption chiller will be adapted to meet the specific requirements necessary to integrate it with the CHP unit. By means of hardware-in-the-loop measurements and dynamic system simulations, different system configurations and control strategies will be analysed under dynamic boundary conditions, optimized and evaluated.
Scenario assessment for the economic market potential of relevant energy technologies.
Economic analyses and scenarios for the future relevance of various sustainable energy technologies considering interaction of technologies, learning effects and exogenous scenario parameters. Recommendations for the future orientation of research and technology development.
Monitoring Passivhäuser China, Hebei, Zhuozhou, Bürogebäude und ArbeiterInnenwohnheim
In Zhouzhou, Provinz Hebei (70 km südlich von Peking) wird im Mai 2015 der Neubau eines 3.000 m² Bürogebäudes und 2.300 m² Arbeiterwohnheimes in Passivhausstandard fertiggestellt werden. Als abschließende Maßnahme ist ein 2-jähriges Monitoring der zwei fertiggestellten Passivhäuser geplant.
Technological as well as economical optimized Biomass CHP systems with regard to state-of-the-art technologies.
Analysis and presentation of representative biomass CHP systems with an electric power output of less than 2 MW. Variation of parameters and identification of potential optimized interactions between specific units. Identification of the economically and thermodynamically most optimized interconnection based on state-of-the-art technologies.
Oekosan'11 - International symposium for high-quality retrofit of large-volume buildings to plus-energy-buildings
The AEE INTEC organized the international congress "ökosan'11 - high-quality retrofit of large-volume buildings to plus-energy-buildings" in September 2011. The position of Austrian companies in international cooperation was strengthened through personal contacts during the conference.
Energy efficient, resource conserving and differentiated renovation of historic European building stocks (ReCoRe)
The project goal was the development of an integrated, long term and life cycle oriented approach to sustainable modernisation of historical building stocks. Within this project the partners used common objectives and planning tools and followed a common procedure in order to develop a specific national application which results from a historical, technical, social and cultural understanding of the specific national stock fragments.
Innovation & Cost efficiency: Building standards for multi family residential buildings at optimal cost (Inno-Cost)
In this project, innovative building standards were examined concerning their economical aspects through the life cycle of a building. By means of life cycle-costs for 40-50 multi family lowest energy and passive house residential buildings on actual data from the day-to-day operation, reliable data and know-how was compiled for the first time, which is to support further market penetration of innovative building standards in the field of multi family residential buildings.
Solar thermal cooling system consisting of a parabolic trough collector field and a steam jet ejector chiller
A solar thermal cooling system consisting of a parabolic trough collector field and a steam jet ejector chiller has been developed. The necessary components were built and tested and finally put together to get an operating pilot plant at the test facility.