Suchergebnisse
aspern + Vienna's Urban Lakeside - sustainable urban development
The focal points of the largest urban development project in Europe are the topics public space and microclimate as well as cross-building energy supply. Landmark projects will be implemented in the areas residential buildings, office/industry buildings and mobility.
ECR Energy City Graz - subproject 2: Framework-Plan Energy City Graz-Reininghaus
Main project-issue is the scientific work and the demonstration of the vision of the energy self-sufficient, CO2-neutral city-district Graz-Reininghaus. The Framework-Plan Energy City Graz-Reininghaus shall stimulate an awareness-raising process towards energy-efficient and sustainable city-development.
Clay - Passiv Office-Building Tattendorf
The motivation for developing the project "Clay Passiv Office-Building Tattendorf" was the dissatisfaction with the situation of a great difference in the state of technology in three fields relevant to the research project: 1) sustainable production of energy , 2) sustainable energy conservation technologies and 3) use of sustainable building materials.
Integrated ecological and energy-oriented refurbishment of service buildings - development of quality criteria and tools within a pilot project (LCC-ECO)

Formulation of a procedure for the general refurbishment of service buildings and development of guidelines to support building owners and facility-managers in each stage of the refurbishment process in order to reach an integrated ecological and energy-oriented refurbishment.
aspern Vienna´s Urban Lakeside - subproject 6a: Energy Consumption Monitoring
This subproject of the flagship project "aspern plus" derived the basis for a centralised monitoring of the energy consumption in Seestadt aspern.
SpeedReg - Prompt quality assurance of the commissioning process of buildings
The focus of the project is on quality assurance within the commissioning process with the aim to speed up and to improve the operational adjustment of newly constructed or comprehensively renovated buildings. The fragmented know-how which is hardly accessible for the relevant target groups will be consolidated and elaborated in the form of a practice guideline which will be directly applicable in commissioning processes in practice. In this way the project contributes to the development of a common, well-established standard for quality assurance within the commissioning of buildings.
Renew Building - Competence Building and Knowledge Transfer for Climate-friendly renovation with ecological and renewable materials
The project Renew Building provided knowledge about eco-friendly renovation to the target groups (planners, architects, students of architecture, etc.) through theory and practice classes, lectures, an e-learning platform, and in an online knowledge database.
WOP - Restoration of residential buildings in passive house quality, Linz, Austria

Pilot scheme for the restoration of the multi-storey residential buildings to a low energy building while people keep living in their flats with energy efficient, ecological and economical criteria.
e80^3-Buildings - Sub project 3: Development of technology and components
The main objective of the key project "e80^3" was to develop high-performance renovation concepts focusing on plus-energy-buildings. Afterwards these concepts were realized in at least one or two demonstration-projects.
Certified passive attic conversion of a typical building from the period around 1900
Conversion of an attic of a typical building from the period about 1900 to a passive attic with photovoltaic system and renovation of the existing building equipment. The aim is to keep the additional construction costs under 10 %, to avoid overheating in summer and to make possible a reproduction for the large amount of buildings from the same period.
PHplusCAD, IT-based efficient Passive house- and Plusenergy house-Planning
Elaboration and programming of a software that reduces effort and time consumption of Passive house and Plusenergy house planning. By developing direct interfaces between CAD-applications and PHplusCAD and interfaces between PHplusCAD and Passivhouse planning tools based on MS Excel the system could be improved and the related working processes alleviated.
PEB - Plus-Energy-Office
An integrated technical energy plus office concept without additional building costs demonstrates the feasibility of such projects instancing a concrete office project with 50.000 m² floor area in Vienna with economical cost consideration.
Climate neutral buildings from the period of promoterism - ways, potentials and possibilities of implementation
The focus was on the goal-oriented and economic options, in order to achieve a CO2-neutral energy supply and hermetically sealed building envelope as well as to show high energy efficiency when using. On the other hand building protection regulations and the quality in use are to be considered.
Optimization of energy supply

The purpose of the work is to analyze the possibilities of the reduction of the energy demand of residential buildings by using telecommunication technologies such as mobile phones or Internet. Lowering room and water temperature during the absence of the inhabitants are of particular relevance.
Platform for Energy-Efficient Hospitals - ways to a higher energy-efficiency
The present project is based on the results of the project "The energy-efficient hospital: realistic departure points and identification of possible measures"
REVITALISING with S.A.M. - Synergy Activation Modules

Case study for the development of modules that allow for the revitalisation of existing structures without interruption of utilization (two studies, one realisation).
aspern Vienna´s Urban Lakeside - subproject 6b: Monitoring of Energy Consumption in Demonstration Buildings in Seestadt Aspern
The project deals wtih the energy consumption monitoring of demonstration buildings, which are erected within the framework of the landmark project "aspern+". As both, office/manufacturing as well as residential buildings will be constructed, these different user groups will have to be considered. The derivation of the concepts will be done in accordance of the specific needs of the individual demonstration buildings.
The Passive House in Practice

Strategies to open markets for passive houses in the east of Austria
Balancing Energy Demand with Buildings
The project BED aimed to the development of new concepts for the operation and application of building automation systems in non residential buildings to reduce the maximal energy consumption and to ensure a stable and high-quality power supply.