Suchergebnisse
Upgrading of biogas for the gas distribution system of Salzburg
Development of a cost-effective cleaning unit, free of waste-products, for the upgrading of biogas to natural gas quality. Elaboration of the basis for a demonstration project injecting biogas into the gas distribution system of Salzburg.
Energy Efficiency and Risk Management in Public Buildings (EnRiMa)
The major objective of the project EnRiMa was to develop an internet based decision-support system (DSS) to enable operators of public buildings to increase the system efficiency as well as to reduce the CO2 emissions. The DSS can be linked to existing energy management systems as DESIGOTM. The University of Applied Science Burgenland, Campus Pinkafeld, and ENERGYbase, Vienna, have been used to test and calibrate the EnRiMa DSS.
ZERMEG - Zero Emission Retrofitting Of Existing Galvanizing Plants
Method to optimize existing galvanizing plants consequently with the goal of zero emission and zero waste enterprises, to minimize operating cost including benchmarks and three case studies
LightFromFacade - Optimized Day- and Artificial Lighting by Facades
Multfunctional facades with integrated artificial- and daylighting systems had been simulated and evaluated regarding lighting and energy (lighting quality and energy demand). The results create basics for further façade developments and for academic education.
IEA HEV Task 45: Electrified Roadways - Monthly Member Meeting
07. December 2022, 15:00 CET
Online, Knoxville, US
Monthly meeting of the members of the IEA Hybrid and Electric Vehicle Technology (HEV) Task 45 regarding current developments in the matter of technology, supply-changes in infrastructure and vehicles, statements of countries and boards, research projects, etc.
What is so beautiful about the own home - a life-style concept of housing
Motives behind the wish of living in a certain way - here, especially in a detached house - explained through a life-style concept
Workshop: Aerosols from small-scale biomass combustion plants
27. January 2011
Stadthalle GrazGraz, AT
The workshop is an integral part of the "Central European Biomass Conference 2011" and will give a comprehensive overview regarding aerosols from biomass combustion focusing on the following relevant topics: "Low-Dust combustion technologies", "Small-scale precipitators" and "Health effects".
Integration methods for solar heat into industrial production processes
The project aims at the development of integration methods for solar heat into industrial production process with batch operations as typical for SMEs
European High Level Event on ICT for Energy Efficiency 2009
19.-20. March 2009
Brussels, BE
The Key 2009 event on ICT for Energy Efficiency
Strategic Research Agenda / Market Deployment Strategy (SRA/MDS)
Herausgeber: European Wind Energy Technology Platform
Englisch, 81 Seiten
Downloads zur Publikation
Utilisation of digestate from biogas plants as biofertiliser
C.T. Lukehurst, P. Frost, T. Al Seadi
Herausgeber: IEA Bioenergy
Englisch, 24 Seiten
Downloads zur Publikation
Smart Grids Pionier region Upper Austria
Strategies for a sustainable energy system using renewables to the full
1/2011
Herausgeber: BMVIT
Englisch, 6 Seiten
Downloads zur Publikation
Industry´s Efforts Towards Zero Emissions
3/2004
Herausgeber: BMVIT
Englisch, 6 Seiten
Downloads zur Publikation
SPIN.OFF - Integration of storage systems in the office building Tech2Base
The research project SPIN.OFF was based on the integration of a zinc - bromine redox flow battery storage system within the Tech2Base, a planned office building in Vienna's 21st district. On the basis of this battery demonstration object questions arising with the implementation and operation process can be answered. Besides the ideal dimensioning of the battery storage system and the development of a self-learning energy management system to increase the self-consumption and to reduce load peaks, additional planning and safety related aspects were investigated.
Elaboration of the conditions to build up a reuse-cycle network for WEEE
Selection of electrical and electronic equipment disposed as waste back into a reuse-cycle, bulding up an operational network between social enterprises, linking up and improving the workflows necessary for this purpose and the creation of a second-hand-shop for electrical an electronic equipment.
aspern Vienna´s Urban Lakeside - subproject 3a: Technology Centre aspern IQ
The demonstration project "Technology centre aspern IQ" showed that the energy required for space conditioning (heating, cooling, ventilation, lighting, hot water) can be covered from domestic energy production.
Product-related Environmental Information Systems in Austrian Companies
Inventory of product-related environmental information systems, survey of implementations within Austrian companies, and analysis with respect to principle applications
Smart ABC Smart Energy Efficient Active Buildings and Building Clusters
The EPBD recast 2010 targeted "nearly zero energy buildings". This low amount of energy is to be covered by energy from renewable energy sources. The project "Smart ABC" analysed a variety of relevant solution sets regarding the building performance and the renewable based energy supply options. Energetic and ecological impacts were analyzed in order to optimize the integration of renewable energy technologies in building standards and to find answers how to depict a building cluster regarding standards and tools.
Maize Cob Board (MCB) - Light weight material from agricultural by-products
Maize cobs accrue as an agricultural by-product can be used for a core material of light weight panels with good material properties and insulation characteristics. The aim was to work out a concept for the production and optimisation of material properties.
"gugler! build & print triple zero" - Subproject 7: Integrated General Planning
The aim of the subproject 7 is to aggregate a "normal" general planning process with innovative additional services. In the spirit of integrated planning in the design a higher number of design parameters must be resolved. This is different to a classic planning process with linear and chronological lined up add ons.