Search results
There are 1301 results.
TRADEMARKFarb&Stoff
From an idea to a trade product ready for marketing: Plant dyes for the textile industry.
TRIGOS - CSR pays!
The project analysed selected TRIGOS projects and organisations and further developed assessment approaches for sustainable management accounting and corporate social responsibility. TRIGOS is an award scheme for organisations who combine economic performance with social and environmental responsibility.
TWIN - Digital twins for sustainable buildings
Digital building twins have hardly been used in practice due to an often unfavourable cost-benefit ratio. The aim of the TWIN project is to bring together use cases of digital building twins with a high ecological and economic impact in order to prepare application scenarios with great implementation potential.
Tariffs4all - Participation of the citizens from Bruck in the energy transition for all
The project responds to the challenges of participation in the energy transition in the municipality of Bruck/Mur by exploring the possibilities of Power Purchase Agreements (PPAs), Peer to Peer Trading (P2P Trading) and virtual metering points for generation plants be developed and implemented as a basis for new tariff/financing models.
Technological as well as economical optimized Biomass CHP systems with regard to state-of-the-art technologies.
Analysis and presentation of representative biomass CHP systems with an electric power output of less than 2 MW. Variation of parameters and identification of potential optimized interactions between specific units. Identification of the economically and thermodynamically most optimized interconnection based on state-of-the-art technologies.
Technology Platform Photovoltaic Austria
Between research institutions and the economic system the way has been paved to initiate joint R&D projects. Common research activities have been initiated and intensified to be able to position local companies in international niche markets for photovoltaics.
Technology transfer for market introduction of multifunctional photovoltaic solar façade systems
Technology and know how transfer for market introduction of multifunctional photovoltaic solar façade systems. Constructional engineering, integration into the buildings´ energy system, economy. Design of an information website and accompanying target group work.
Technology, logistics and economy of large-scale fermentation gas facilities on the basis of biogenous waste
Examination of the logistic, technological and economic feasibility of large-scale fermentation gas facilities. Development of solutions for substrate procurement, plant technology, utilization of the organic remainders of the facilities and poly generation in combination with industrial plants.
Test stand method for the determination of system efficiency and emission factors of small-scale biomass combustion systems
Determination of key data with practical relevance of typical applications in only one test run. Monitoring of air pollutants and efficiency and continuous improvement of technology possible with test stand method.
Testing the sustainable hospital.
Based on a feasibility study an interdisciplinary team of researchers supports hospital practitioners implementing the concept of sustainable development in a pilot hospital. Changes within three key areas should lead to significant improvements.
Thannhausen 2.0 - Thannhausen energy district: a role model and testbed for a renewable energy supply for neighbourhoods
Evaluation and testing of different energy distribution approaches in a neighbourhood using direct lines, storage or new legal options through the ElWG (Electricity Industry Act). The project builds on the existing direct line system in Thannhausen and will test different use cases for the (climate-neutral) supply of neighbourhoods there.
The Box - Thermal High Performance Decoupling - Next Generation Thermal Break Technology
The project pursues the overall strategic objective "solution of the problem-inducing heat bridge". For this purpose, the thermal bridging losses should be reduced by the factor of 15 in contrast to the state of the art. The significant increase in efficiency should rely on existing system solutions, but incorporating a new holistic view in terms of construction, geometry and materials.
The Green Parking Space – Utilization of urban parking areas for production of biomass
Many traffic areas in urban environments are actually used as such only a small fraction of the time. Subject of this project was to investigate the possibility of using those areas by additional integration of photobioreactors for the production of biomass, integrating such systems to the maximum extent into the urban substance and energy cycles.
The Paper Factory in the Year 2030
Paper factory in the year 2030 as an integrated part of a sustainable economy and a supplier of sustainable paper products fulfilling criteria for sustainability at highest possible level.
The Passive House Catalogue of Building details for renovations
"Building of Tomorrow" funded research reports dealing with building renovation will be analysed for solutions of construction details. This information will be supplemented with structural-physical descriptions, ecological ratings and technical discussions. All the information will be collected and systematically presented in a catalogue of building details for renovation.
The Sahel Project
Silicate technology for the improvement of water uptake and nutrient storage in marginal soils; field tests in the northern Sahel region in Senegal
The Sustainable Hospital
Working together with practitioners scientists from the fields of social ecology, sociology of health and economics introduce the concept of sustainable development into a pilot hospital. The feasibility study establishes the base for ecological, social and economic improvements within the hospital.
The Use of wind energy in skiing regions - Evaluation of the consume of electricity and dissemination of the results of the analysis
Main goals of the project are the analysis of the location Salzstiegl concerning the coverage of their own electricity needs with an already existent windmill as well as a following dissemination of the outcome of the analysis in form of a workshop for all ski lift carriers of Austria.
The development of fused wood-only parquet elements
The development of the wood fusing technology to an innovative, ecological process of production of wood-only parquet elements, which do not contain any wood foreign substances as glue or thermoplastics.
The sustainable hospital. Dissemination.
Following two successful "Fabrik der Zukunft" projects on the theme of sustainable hospitals ("Feasibility study" 2004-2005 and "Testing in a pilot hospital" 2006-2008) the results and key findings were disseminated by a diversified dissemination strategy. The project was based on an intensive and successful more than four-year cross-disciplinary cooperation involving the pilot hospital (SMZ Otto Wagner Spital), the Viennese Hospital Association, the Immanuel Diakonie Group (Berlin) and an interdisciplinary team of researchers.