Search results
There are 927 results.
"Building of Tomorrow" on the road - knowledge transfer of the results from "Building of Tomorrow" to existing traineeships
Knowledge transfer of the programme "Building of Tomorrow" to specialists on universities, advanced technical colleges, polytechnics, construction academies, administration academies. Themes: Energy, Construction and Building Physics, Ecology and Architecture and Sociology.
"Communal living for elderly - ecological, social and economical aspects" - eco-com.60+
The research project examined different forms of communal living of elderly people and contributes to the development of new, common forms of living for the elderly. Questions concerning demographic change and economic as well as ecologic challenges of our time had been dealt with.
"Gasthermenersatz" - Modular heat pump with environmentally friendly refrigerant to replace natural gas-based heating systems in large-scale residential buildings
The project "Gasthermenersatz" aims at developing, manufacturing, and testing a functional prototype of a decentralized, sound-optimized heat pump solution with refrigerant circuit modules connected in series or parallel. This renewable technology is well-suited to replace existing natural gas-based heating systems in large-scale residential buildings and to pave the way to carbon-neutral cities.
"Green Biorefinery - Utilitsation of Grass Fibres"
Basic properties of grass fibres from a green biorefinery will be investigated in order to have a sound base for comparison of grass fibres with other renewable fibres. Selected prototype-products with these grass fibres as main raw material source (e.g. insulation materials, gardening material, animal nutrition) will be developed, tested and evaluated whether they are technologically as well as economically feasible.
"IÖB-Tool" Housing and renewable energy technologies
Innovation-promoting public procurement tool for housing and renewable energy technologies
"Leitbilder" in "energy regions" or how to co-ordinate technical change
In three Austrian regions, which call themselves "energy regions", the processes leading to the formulation of common visions or "leitbilder" is analysed and the impact is assessed such "leitbilder" can have on technical change on the regional scale. On this basis and with help of external consulters adapted communication and network strategies are developed and examined with regard to transferable elements.
"NAWARO-Peat" - Peat replacement products by regional renewable resources
Possibilities to stop the peat usage in horticulture by using renewable resources and biological wastes which are regional available. Efficient economical as well ecological solutions for the usage of alternatives to peat, development and testing of treatment technologies which are necessary to create such a substrate in laboratory and field scale.
"eco fashion - fashion for the future" - Congress about ecological and social impacts of textile production
The project was intended to promote a change of image related to ecotextiles. A congress provided teachers and education experts with background information and tools for their work, thus leading to a sustainable transfer of knowledge in education.
"gugler! build & print triple zero" - Subproject 7: Integrated General Planning
The aim of the subproject 7 is to aggregate a "normal" general planning process with innovative additional services. In the spirit of integrated planning in the design a higher number of design parameters must be resolved. This is different to a classic planning process with linear and chronological lined up add ons.
"gugler! build & print triple zero" - Subproject 8: Leuchtturm gugler – Ökoeffektive Plusenergiedruckerei
On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building had been developed.
"gugler! build & print triple zero" - subproject 1: lead project management
The lead project management provides furthermore for sufficient interlinking between the project partners by monthly, by requirement weekly project workshops. Besides the leading project management represents the project gugler to the outward and takes part in workshops of the program management
"gugler! build & print triple zero" - subproject 2: building with recycros
Building with recycros is working out basics in order to close the cycle of materials in the building sector as well as to increase the usage of recycled materials (recycros). The existing material cycles in the building sector are going to be analysed. Furthermore, there will be a catalogue presented, covering the actual situation of which materials are used in today´s engineering and how the waste is treated. The project will be completed with a summary of results and a proposal of concrete materials and constructional systems for the building project gugler.
"gugler! build & print triple zero" - subproject 3: recyclable constructing
Development of basic principles and proposals for highly recyclable constructions. A catalogue with main principles of recyclable designing with a particular focus on material inherent bonding and joint techniques as well as a selection of constructions including ecological benchmarks, calculation of building physics plus costs was created.
"gugler! build & print triple zero" - subproject 4: energy concept Gugler
The energy concept led Gugler in frame of the conversion and expansion of the company towards plus-energy standard. Significant measures ware a consequent maximum reduction of the energy demand, optimal utilisation of industrial waste-heat, maximum consumption of on-site energy sources, integrated energy production, ecologic load management with comprehensive response- and storage-techniques.
"gugler! build & print triple zero" - subproject 5: Ecoeffective building
On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building will be developed.
"gugler! build & print triple zero" - subproject 6: Integration of the C2C production into the flagship project Gugler
Print and media production at the media and communications company gugler GmbH are currently being optimized according to Cradle to Cradle (C2C) criteria. The goal of this subproject is to allow the demands of a C2C production process optimized for exchange with biological cycles to be included into the general planning of the new production building of the company, a pilot project within the "building of tomorrow" program line.
"gugler! build & print triple zero" - subproject 9: Monitoring Gugler - Monitoring, evaluation, optimization GUGLER
The project objective is the measurement of relevant building values (energy consumption, ...), the evaluation of these values compared with the intended objectives and the optimization of the system based on the measured data. As a special innovation, monitoring the storage of alternatively generated electricity using photovoltaic and wind energy in the form of compressed air must be considered.
# EEG+ digital energy communities
The project addresses issues related to plus-energy neighborhoods and energy communities, both of which aim to make buildings more sustainable. The aim is to explore synergy effects and to research a possible implementation as a demonstration.
# Murau : Real-World Laboratory of energy transition for inner-alpine regions
Inner-alpine regions are rich in the natural resources water, sun, wind and biomass. This study investigates how the Murau region can become a stable and fail-safe, renewable 100% region and how it is possible to supply the energy-hungry conurbations as a needs-based energy export region.