Search results

There are 888 results.

Haus der Zukunft

aspern + Vienna's Urban Lakeside - sustainable urban development

The focal points of the largest urban development project in Europe are the topics public space and microclimate as well as cross-building energy supply. Landmark projects will be implemented in the areas residential buildings, office/industry buildings and mobility.

Haus der Zukunft

aspern Vienna´s Urban Lakeside - subproject 1: Public Space and Micro Climate: Basics for climate sensitive planning in Aspern

The Project will derive planning examples and recommendations in order to optimize the building performance as well as outdoor amenity. The study will be based on a climate prognosis of the aspern area and compare different reference examples of construction and open space design.

Haus der Zukunft

aspern Vienna´s Urban Lakeside - subproject 3a: Technology Centre aspern IQ

The demonstration project "Technology centre aspern IQ" showed that the energy required for space conditioning (heating, cooling, ventilation, lighting, hot water) can be covered from domestic energy production.

Haus der Zukunft

aspern Vienna´s Urban Lakeside - subproject 5: Monitoring of Energy Consumption in Demonstration Buildings in Seestadt Aspern

Goal of the project is to develop a monitoring tool that allows to predict the expectable (final) quality of the residential buildings based on decisions made during the planning and construction phase. For this purpose, the current certification tool for the determination of "TQB-points" will be equipped with "interim" certifications, which shall allow the land developer to carry out a quality monitoring parallel to the construction phase. The tool will be tested with the data obtained from selected construction projects during the first residential development phase in seestadt aspern.

Haus der Zukunft

aspern Vienna´s Urban Lakeside - subproject 6a: Energy Consumption Monitoring

This subproject of the flagship project "aspern plus" derived the basis for a centralised monitoring of the energy consumption in Seestadt aspern.

Haus der Zukunft

aspern Vienna´s Urban Lakeside - subproject 6b: Monitoring of Energy Consumption in Demonstration Buildings in Seestadt Aspern

The project deals wtih the energy consumption monitoring of demonstration buildings, which are erected within the framework of the landmark project "aspern+". As both, office/manufacturing as well as residential buildings will be constructed, these different user groups will have to be considered. The derivation of the concepts will be done in accordance of the specific needs of the individual demonstration buildings.

Haus der Zukunft

aspern Vienna´s Urban Lakeside subproject 2: Inter-building energy distribution

Development of comprehensive concepts for local distribution systems for thermal and electric energy within a residential area including the consideration of the interaction with construction and city planning. Derivation of measures for demonstration buildings and the infrastructure of the residential area. Integration of computing models to a prototype simulating energy distribution in the residential area.

Haus der Zukunft

aspern Vienna´s Urban Lakeside subproject 8: Overall Project Management Landmark Project "aspern+"

The Overall Project Management of the "Leitprojekt" includes the handling and supervision of the sub-projects, the reporting to the programme management and additionally the preparation and distribution of relevant results. Beyond that the project management is responsible to highlight possible synergies within other projects and to - if necessary - include these within the next steps.

Stadt der Zukunft

baubehoerde.at - Development of a Vision 2030 for a Digital Building Authority and Recommendations for Action in Austria

In Austria, planning permission applications are submitted and managed largely manually. The aims of the baubehoerde.at project are to evaluate the potential and limitations of digitizing building approval processes and to create a Vision 2030 strategy for a digital building authority.

Haus der Zukunft

baubookPlus - Expansion of an extensive knowledge database of sustainable buildings

By the foundation of the baubook GmbH in 2008 the two databases of building products "öbox" and "ixbau.at" have been merged. The new database baubook was expanded. Essential functions (central product declaration, decentral quality management) and fields of products were added.

Nachhaltig Wirtschaften

circPLAST‐mr Mechanical Recycling of Plastics: Mechanisches Recycling von Kunststoffen: From waste plastics to high‐quality and specification‐compliant recyclates

The flagship project circPLAST‐mr pursues the following 4 main objectives: (1) to identify and explore previously unused potential for mechanical plastics recycling, (2) to define and test key process steps for this on a laboratory/pilot scale, (3) to demonstrate the eco‐efficient marketability of increased recycled plastic volumes, and (4) to demonstrate the scalability of the laboratory/pilot process steps to industrial scale.

Stadt der Zukunft

digiactiv - digital transformation for more interactivity in MEP-(mechanical, electrical and plumbing-)planning

The aim of the digiactiv project is to improve the interoperability between the different stakeholders in the building construction sector using open and neutral semantic data models. With digital transformation processes, digiactiv helps to increase the quality of planning and the operation of buildings, as well as to minimize the interface risk between various stakeholders.

Haus der Zukunft

e-genius.at: The Open Content knowledge and learning platform

The objective of the project was to develop online teaching materials on the topics energy-efficient buildings and renewable energy sources in collaboration with technical vocational schools and vocational higher secondary schools.

Haus der Zukunft

e-retrofit kit - tool kit for passive house retrofit

Development of an internet-based tool for passive house retrofit für - target group social housing companies. Actualization of tool after test and evaluation in case-studies. dissemination activities in austria.

Haus der Zukunft

e80^3-Buildings - "reconstruction concepts towards energy plus house standard with prefabricated active roof and facade elements, integrated home automation and network integration"

The project aims for highly-efficient renovation of existing buildings and settlements in urban areas. The main focus are buildings that were built between 1950 and 1980.

Haus der Zukunft

e80^3-Buildings - Sub project 1: Basics

Goal of this subproject was to select the building with the highest potential within a building-portfolio. Therefore a criteria catalogue was developed, which is generally applicable.

Haus der Zukunft

e80^3-Buildings - Sub project 2: Concept development

Based on the selection of suitable demonstration projects in Subproject 1 an innovative concept for passive and active building envelopes and energy supply of so called "Plus Energy Buildings" (renovation) has been developed.

Haus der Zukunft

e80^3-Buildings - Sub project 3: Development of technology and components

The main objective of the key project "e80^3" was to develop high-performance renovation concepts focusing on plus-energy-buildings. Afterwards these concepts were realized in at least one or two demonstration-projects.

Haus der Zukunft

e80^3-Buildings - Sub project 4: Demonstration object

Alongside the realisation of the plus energy building in Kapfenberg, a demonstration project is scheduled to be created that accomplishes an economically viable and technically innovative solution for the future.

Haus der Zukunft

e80^3-Buildings - Sub project 5: Monitoring and dissemination

The content of subproject 5 was the analysis of energy- as well as building-biology-related issues for the evaluation and quality management of the demo-project in Kapfenberg, which involves a high-quality refurbishment to a plus energy house within the program "Haus der Zukunft - Building of Tomorrow". Within this process the user acceptance before, during and after the renovation was elevated and this will be processed for upcoming projects. The environmental quality of the building regarding the choice of materials and measures during the construction phase and the subsequent use of the building was assessed with the help of the TQB-planning and evaluation tool.