Search results
There are 72 results.
"gugler! build & print triple zero" - subproject 1: lead project management
The lead project management provides furthermore for sufficient interlinking between the project partners by monthly, by requirement weekly project workshops. Besides the leading project management represents the project gugler to the outward and takes part in workshops of the program management
"gugler! build & print triple zero" - subproject 3: recyclable constructing
Development of basic principles and proposals for highly recyclable constructions. A catalogue with main principles of recyclable designing with a particular focus on material inherent bonding and joint techniques as well as a selection of constructions including ecological benchmarks, calculation of building physics plus costs was created.
"gugler! build & print triple zero" - subproject 4: energy concept Gugler
The energy concept led Gugler in frame of the conversion and expansion of the company towards plus-energy standard. Significant measures ware a consequent maximum reduction of the energy demand, optimal utilisation of industrial waste-heat, maximum consumption of on-site energy sources, integrated energy production, ecologic load management with comprehensive response- and storage-techniques.
"gugler! build & print triple zero" - subproject 5: Ecoeffective building
On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building will be developed.
"gugler! build & print triple zero" - Subproject 7: Integrated General Planning
The aim of the subproject 7 is to aggregate a "normal" general planning process with innovative additional services. In the spirit of integrated planning in the design a higher number of design parameters must be resolved. This is different to a classic planning process with linear and chronological lined up add ons.
"gugler! build & print triple zero" - Subproject 8: Leuchtturm gugler – Ökoeffektive Plusenergiedruckerei
On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building had been developed.
"gugler! build & print triple zero" - subproject 9: Monitoring Gugler - Monitoring, evaluation, optimization GUGLER
The project objective is the measurement of relevant building values (energy consumption, ...), the evaluation of these values compared with the intended objectives and the optimization of the system based on the measured data. As a special innovation, monitoring the storage of alternatively generated electricity using photovoltaic and wind energy in the form of compressed air must be considered.
6D BIM-Terminal: Missing Link for the development of CO2 neutral buildings
The present project aims to close the gap between specialist consultants and Building Information Modeling (BIM) applications. For that, relevant data for cost estimation, scheduling construction planning and management or sustainable building operation and facility management, shall be added automatically to BIM elements and imported into the respective specialist planning software. This data exchange shall be carried out using IFC interface according to ÖNORM A6241-2 and the properties of the ASI properties server via a central platform, the "6D BIM-Terminal".
ArcheNEO - an energy-autonomous office park in Kitzbühel
ArcheNEO is a highly energy efficient office park, that produces more energy than it needs. It features an integrated energy concept that saves energy, uses renewable energies in combination with electric mobility and batteries as electricity storage and manages energy and was planned and built in Kitzbühel Oberndorf. The demonstration object will be multiplied and exported.
Architectural Concept for Musicians
Starting from the special needs of a specific user group, an Architectural Concept for Musicians will be proposed and realized, with Housing as principal functional usage.
aspern + Vienna's Urban Lakeside - sustainable urban development
The focal points of the largest urban development project in Europe are the topics public space and microclimate as well as cross-building energy supply. Landmark projects will be implemented in the areas residential buildings, office/industry buildings and mobility.
aspern Vienna´s Urban Lakeside - subproject 3a: Technology Centre aspern IQ
The demonstration project "Technology centre aspern IQ" showed that the energy required for space conditioning (heating, cooling, ventilation, lighting, hot water) can be covered from domestic energy production.
aspern Vienna´s Urban Lakeside - subproject 5: Monitoring of Energy Consumption in Demonstration Buildings in Seestadt Aspern
Goal of the project is to develop a monitoring tool that allows to predict the expectable (final) quality of the residential buildings based on decisions made during the planning and construction phase. For this purpose, the current certification tool for the determination of "TQB-points" will be equipped with "interim" certifications, which shall allow the land developer to carry out a quality monitoring parallel to the construction phase. The tool will be tested with the data obtained from selected construction projects during the first residential development phase in seestadt aspern.
aspern Vienna´s Urban Lakeside - subproject 6b: Monitoring of Energy Consumption in Demonstration Buildings in Seestadt Aspern
The project deals wtih the energy consumption monitoring of demonstration buildings, which are erected within the framework of the landmark project "aspern+". As both, office/manufacturing as well as residential buildings will be constructed, these different user groups will have to be considered. The derivation of the concepts will be done in accordance of the specific needs of the individual demonstration buildings.
aspern Vienna´s Urban Lakeside subproject 2: Inter-building energy distribution
Development of comprehensive concepts for local distribution systems for thermal and electric energy within a residential area including the consideration of the interaction with construction and city planning. Derivation of measures for demonstration buildings and the infrastructure of the residential area. Integration of computing models to a prototype simulating energy distribution in the residential area.
aspern Vienna´s Urban Lakeside subproject 8: Overall Project Management Landmark Project "aspern+"
The Overall Project Management of the "Leitprojekt" includes the handling and supervision of the sub-projects, the reporting to the programme management and additionally the preparation and distribution of relevant results. Beyond that the project management is responsible to highlight possible synergies within other projects and to - if necessary - include these within the next steps.
Beacon of innovation gugler cross media, ecoeffective zero energy cross media enterprise featuring zero-emission, zero energy, zero waste
The aim of the flagship project is a new dimension of sustainability (cradle to cradle, ecoeffective zero energy enterprise) for business operation and building, which means zero emission, zero energy, zero waste. This will be shown on the basis of a beacon of innovation: Gugler GmbH, a modern sustainable media services enterprise (traditional print and new media) will extend their current building from about 2100 square meters and about 90 employees to about 5,000 square meters.
BIMSavesEnergy - BIM-based planning-methods for the assurance of energy-efficiency in the building process
The Building Information Model (BIM) brings about fundamental changes in the planning and construction of buildings, as the common base makes it possible to work closely together across disciplines in construction projects. In this project, BIM-based planning methods were developed, which make the influence of planning decisions on energy efficiency quantifiable and controllable in the management process.
Biotope City - construction manual for the green city of the future
"Biotope City" is an overall concept for the implementation of comprehensive urban greening with the aim of using the regenerative mechanisms of nature. With this approach, quality of life is to be comprehensively, sustainably and cost-effectively increased and resilience against extreme weather events in cities will be improved. The project aims to generate realistic components of a "construction manual" for the green city of the future, which are generalizable and transferable.
BONSEI! Optimal use of existing buildings – energy efficient implementation of renovation!
The project BONSEI! would like to support an energy efficient and socially acceptable densification of privately owned residential buildings in urban space and to develop a methodological basis for resource efficient urban areas. The results are used for the conception of an innovative service in order to provide a neutral consulting regarding private densification plans.