Search results

There are 66 results.

Haus der Zukunft

"gugler! build & print triple zero" - Subproject 7: Integrated General Planning

The aim of the subproject 7 is to aggregate a "normal" general planning process with innovative additional services. In the spirit of integrated planning in the design a higher number of design parameters must be resolved. This is different to a classic planning process with linear and chronological lined up add ons.

Haus der Zukunft

"gugler! build & print triple zero" - Subproject 8: Leuchtturm gugler – Ökoeffektive Plusenergiedruckerei

On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building had been developed.

Haus der Zukunft

"gugler! build & print triple zero" - subproject 1: lead project management

The lead project management provides furthermore for sufficient interlinking between the project partners by monthly, by requirement weekly project workshops. Besides the leading project management represents the project gugler to the outward and takes part in workshops of the program management

Haus der Zukunft

"gugler! build & print triple zero" - subproject 4: energy concept Gugler

The energy concept led Gugler in frame of the conversion and expansion of the company towards plus-energy standard. Significant measures ware a consequent maximum reduction of the energy demand, optimal utilisation of industrial waste-heat, maximum consumption of on-site energy sources, integrated energy production, ecologic load manage­ment with comprehensive response- and storage-techniques.

Haus der Zukunft

"gugler! build & print triple zero" - subproject 5: Ecoeffective building

On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building will be developed.

Haus der Zukunft

"gugler! build & print triple zero" - subproject 6: Integration of the C2C production into the flagship project Gugler

Print and media production at the media and communications company gugler GmbH are currently being optimized according to Cradle to Cradle (C2C) criteria. The goal of this subproject is to allow the demands of a C2C production process optimized for exchange with biological cycles to be included into the general planning of the new production building of the company, a pilot project within the "building of tomorrow" program line.

Haus der Zukunft

"gugler! build & print triple zero" - subproject 9: Monitoring Gugler - Monitoring, evaluation, optimization GUGLER

The project objective is the measurement of relevant building values (energy consumption, ...), the evaluation of these values compared with the intended objectives and the optimization of the system based on the measured data. As a special innovation, monitoring the storage of alternatively generated electricity using photovoltaic and wind energy in the form of compressed air must be considered.

Haus der Zukunft

AC/DC Office Buildings - Implementation of Electricity Networks with Alternating and Direct Current in Office Buildings - Feasibility and Energy Efficiency Potentials

Based on a literature and technology review this projects aimed to document and demonstrate already available and reasonable concepts for the implementation of electricity networks with alternating and direct current in modern office buildings. Focus of the study was to assess the feasibility in general and the energy efficiency potential in particular but it also documents necessary technical equipment and expected advantages and disadvantages. Additionally, important research questions for energy supply, energy distribution and application of direct current technologies were formulated.

Haus der Zukunft

ArcheNEO - an energy-autonomous office park in Kitzbühel

ArcheNEO is a highly energy efficient office park, that produces more energy than it needs. It features an integrated energy concept that saves energy, uses renewable energies in combination with electric mobility and batteries as electricity storage and manages energy and was planned and built in Kitzbühel Oberndorf. The demonstration object will be multiplied and exported.

Haus der Zukunft

BIGMODERN - Subproject 10: Evaluation, Documentation and Ensuring Transferability

The subproject 10 is part of the flagship project BIGMODERN. It is based on the results of subproject SP 7 in which a monitoring concept has been developed. This concept is now implemented through monitoring of different aspects occurring during the first two years of operation of both BIGMODERN demonstration buildings.

Haus der Zukunft

BIGMODERN - Subproject 11: Dissemination of project results

The project is part of the flagship project BIGMODERN. It aims at disseminating all relevant results of BIGMODERN in a comprehensive and targeted way. It addresses different target groups, such as decision makers inside the BIG Bundesimmobiliengesellschaft, various users of federal buildings and other real estate companies nationally and internationally.

Haus der Zukunft

BIGMODERN - Subproject 2: Demonstration project of an official building in Bruck

In the frame of this subproject being part of the flagship project BIGMODERN, a decision matrix as well as a handbook for planning, including feasibility analysis and a collection of information, serving as decision guidance for planning and implementation of sustainable building refurbishment, is being developed. In this way, the risk for planners and builders of the usage of new sustainable technologies shall be minimised.

Haus der Zukunft

BIGMODERN - Subproject 5: Feasibility studies about innovative technical solutions

The application of innovative technologies means additional planning and coordination effort which usually cannot be incorporated into the conventional planning processes of the BIG. To overcome these barriers for the application of innovative technologies, the sub project at hand aims at preparing information, feasibility studies, planning records, experiences and practical examples in a way, that they can be implemented directly into the planning process.

Haus der Zukunft

BIGMODERN - Subproject 6: Incentives to enforce energy efficiency and sustainability in moderniza­tions of BIG-buildings

Development of approaches, which lead to general conditions for complete refurbishments in BIG-buildings, which support high standards regarding energy efficiency and sustainability. This will ensure high-quality modernizations for BIG's real estate.

Haus der Zukunft

BIGMODERN - Subproject 8: Demonstration building Amtshaus Bruck - Realisation

In the frame of the flagship project BIGMODERN the "Amtshaus Bruck an der Mur" had been renovated according to above-average quality standards concerning energy efficiency and sustainability while complying with an industrial management point of view.

Haus der Zukunft

BIGMODERN - Sustainable refurbishment standards of federal buildings constructed between 1950 and 1980

The project aims at developing sustainability and climate protection criteria for the refurbishment of federal buildings of the postwar period. These criteria will be tested for their practical suitability within the framework of demonstration projects. Subsequently, these criteria will be defined as fundamental guiding principles in the planning and building processes for all future BIG retrofit projects.

Haus der Zukunft

BIGMODERN Subproject 3: Demonstration building University Innsbruck - Main building of the Faculty for Technical Sciences - Planning process

Demonstration of feasibility of renovation of an official building in high thermal and energetical quality and consideration of further sustainable criteria.

Haus der Zukunft

BIGMODERN Subproject 7: Monitoring concept

Development of a pattern for comprehensive documentation of the project results. The concepts contain amongst others monitoring of energy consumption, resources, costs, functionality and comfort, etc.

Haus der Zukunft

Beacon of innovation gugler cross media, ecoeffective zero energy cross media enterprise featuring zero-emission, zero energy, zero waste

The aim of the flagship project is a new dimension of sustainability (cradle to cradle, ecoeffective zero energy enterprise) for business operation and building, which means zero emission, zero energy, zero waste. This will be shown on the basis of a beacon of innovation: Gugler GmbH, a modern sustainable media services enterprise (traditional print and new media) will extend their current building from about 2100 square meters and about 90 employees to about 5,000 square meters.

Haus der Zukunft

Build to satisfy: Modeling of user behavior in lowest and plus energy buildings: Consequences for building and comfort

Aim of the project was a better understanding and modeling of effects of user behavior on energy performance in office and service buildings, built with lowest energy building and plus-energy building techniques. The results support facility managers of office/service buildings and integrate gender and diversity issues.