BIGMODERN - Subproject 11: Dissemination of project results

The project is part of the flagship project BIGMODERN. It aims at disseminating all relevant results of BIGMODERN in a comprehensive and targeted way. It addresses different target groups, such as decision makers inside the BIG Bundesimmobiliengesellschaft, various users of federal buildings and other real estate companies nationally and internationally.

Short Description

This project is a sub project of the flagship project "BIGMODERN - Sustainable modernisation standards for buildings owned by the Federal Republic of Austria of the period from the 1950s to the 1980s"

Status

ongoing

Summary

The Subproject 11 is part of the flagship project BIGMODERN. It aims at disseminating all relevant results of BIGMODERN in a comprehensive and targeted way. It addresses different target groups using different communication channels:

  • the different departments inside the BIG Bundesimmobiliengesellschaft and the various users of federal buildings (ministries, universities etc.) are addressed by a learning-by-doing-approach, i.e. the results of BIGMODERN are directly introduced into the preparation processes concerning new refurbishment projects;
  • for a broader dissemination to the real estate industry a manifold mix of communication instruments is applied: PR activities, presentations at workshops and congresses, presence at the important real estate trade fairs, organization of excursions, implementation of smaller workshops and face-to-face-meetings with selected decision makers;
  • international networking includes publishing BIGMODERN results electronically at important websites and internet places as well personal contact with potential partners for follow-up projects and events at the international level.

All dissemination activities are using a basic infrastructure consisting of the “Haus der Zukunft”-project website which will be actualized by BIMODERN results continuously and which will be linked to the company website of BIG and various information folders and brochures. Through the website all publishable reports from the demonstration projects and from the other sub-projects of BIGMODERN will be available.

Project Partners

Project management

Architekt Mag. Dirk Jäger
Bundesimmobiliengesellschaft m.b.H.

Mag. Klemens Leutgöb
e7 Energie Markt Analyse GmbH

Project or cooperation partners

Contact Address

Bundesimmobiliengesellschaft m.b.H.
Architekt Mag. Dirk Jäger
1030 Wien, Hintere Zollamtsstr.1
Tel.: +43 5 0244 - 4829
Fax: +43 5 0244 - 4731
Mobil: +43 664 807 45 - 4829
E-Mail: dirk.jaeger@big.at
Web: www.big.at

e7 Energie Markt Analyse GmbH
Mag. Klemens Leutgöb
Theresianumgasse 7/1/8
1040 Vienna, Austria
Tel.: +43 (1) 9078026
Fax: +43 (1) 9078026-10
E-Mail: office@e-sieben.at
Web: www.e-sieben.at