Search results

There are 66 results.

Haus der Zukunft

CO-MOD - Increasing comfort and energy efficiency through improved lighting and air quality in schools - implementation through modular EPC-models and ESCO-networks

In general local educational institutions such as schools and kindergardens have a high average demand for improved comfort and energy efficiency improvements. CO-MOD develops a flexible, modular concept (with provider networks, various financing options incl. "Grandmother"-Energy Services, contract modules) that can also respond to the individual circumstances of smaller objects.

Haus der Zukunft

COP5+ - Further development of a heat- and cooling system with seasonal heat storage at the example of Central Europe´s biggest geothermal depth drilling field

The aim was to increase the overall energy efficiency of Plus-Energy-Houses by making the heat excess of summer available for use in winter. This was carried out by improvements of the technology seasonal heat storage to an intelligent overall system. The biggest geothermal depth drilling field in Central Europe has been established.

Haus der Zukunft

Clay - Passiv Office-Building Tattendorf

The motivation for developing the project "Clay Passiv Office-Building Tattendorf" was the dissatisfaction with the situation of a great difference in the state of technology in three fields relevant to the research project: 1) sustainable production of energy , 2) sustainable energy conservation technologies and 3) use of sustainable building materials.

Haus der Zukunft

Connection of innovative strategies and technologies to a holistic, resources-friendly plus energy building (FUTUREbase)

On the basis of a construction project in Giefinggasse 4 in Vienna the combination of new, innovative strategies and technologies to an integrated, resources conserving plus energy building with high signaling and multiplication effect had been tested for feasibility. A regional, energetical bond between the buildings TECHbase, ENERGYbase and the Klima-Windkanal had been developed.

Haus der Zukunft

Construction Site SCHOOL - Sustainable Models for the Refurbishment of School Buildings?

In this research project, models for refurbishment and restructuring of school buildings were developed. The reconstruction concepts contain lists of measures for deploying sustainable building techniques and exemplary case studies for the reorganisation of buildings of different typologies.

Haus der Zukunft

Demonstration building of the eco²building system: First passive house prefabricated wood building system for commercial and industrial buildings

The EU funded "eco2building" construction system in a timber-frame based modular design represents a systematic approach for energy efficient commercial and industrial buildings. The object of the eco²building demonstration project - the logistics centre in passive-house quality for "Eine Welt Handel AG" - in Niklasdorf was to optimize the planning and construction processes and prepare for the market launch of the eco²building construction system. Accompanying research monitored and disseminated the experience.

Haus der Zukunft

Demonstration project LifeCycle Tower - batch-produced energy efficient timber/hybrid high-rise building system

The energy efficient building concept shall be tested with regard to its functional efficiency and real usage conditions. The demonstration project is based upon the results of previous research activities and shall be presented to a wider public. It shall illustrate the advantages of a batch-produced timber/hybrid high-rise building system which offers high quality of energy and resource efficiency.

Haus der Zukunft

Demoobject energy-autarkic solarplant

Within the project at hand a production plant with store house and offices had been constructed. It serves as a reality testing field for long-term measurement of components and systems developed in previous projects. It serves for the demonstration of innovative energy systems and components for the interested public and for experts.

Haus der Zukunft

Development of a "Light Well" for daylight transparent, highly energy-efficient, multi-story buildings

Daylight supply of multi-story buildings with the help of rooflight openings. Reflecting vertical ducts transport light down to the lower­most floor. The idea promises new building structures with daylight transparency and high energy-efficiency that have a minimal demand of artificial light and cooling at optimal comfort.

Haus der Zukunft

Development of a strategy for industrialized serial production of ecological passive houses made out of renewable resources

Development of a strategy for industrialized seria. production of ecological passive solar houses made out of building materials based on renewable resources as foundation for the dissemination of sustainable solutions for the production of prefabricated houses and of single houses.

Haus der Zukunft

ECR Energy City Graz - subproject 3: +ERS - Plus Energy Network Reininghaus Süd

The multifunctional neighbourhood "+ERS - Plus Energy Network Reininghaus Süd" was realized within the urban planning area of Graz-Reininghaus. The project aims to optimize the energy concept of the single buildings as well as of the building cluster in order to achieve a plus-energy standard within the residential neighbourhood.

Haus der Zukunft

ECR Energy City Graz-Reininghaus: Urban strategies for the new conception, construction, operation and restructuring of an energy self-sufficient city district

The aim is the development of a valid set of specific values and a guideline as a basis for energy self-sufficient district development. Based on the results, a masterplan (energy-network) for the district Graz-Reininghaus shall be developed. Future-oriented "city-building-blocks" will be implemented as flagships of innovation.

Haus der Zukunft

Ecological restoration of a listed building with passive house technologies

Ecological exemplary reconstruction of the "Haidenhof"-building, Bad Ischl, Upper Austria. Building refurbishment with respect to monumental protection and newest passive house technologies. Reorganisation of the former residential building to an academy of arts and culture.

Haus der Zukunft

Energy Efficiency and Risk Management in Public Buildings (EnRiMa)

The major objective of the project EnRiMa was to develop an internet based decision-support system (DSS) to enable operators of public buildings to increase the system efficiency as well as to reduce the CO2 emissions. The DSS can be linked to existing energy management systems as DESIGOTM. The University of Applied Science Burgenland, Campus Pinkafeld, and ENERGYbase, Vienna, have been used to test and calibrate the EnRiMa DSS.

Haus der Zukunft

Energy package Kolpinghaus / Eco-Suite Hotel

The Kolping association’s dormitory for pupils and students has been extended. The energy demand of the newly constructed Eco-Suite Hotel is minimized by use of highly efficient components (such as LED lighting). Locally available energy sources (waste water heat and sunlight) are used and an on-site energy system is being created for the use of the heat energy surplus. Guests at Eco-Suite Hotel can experience life in a plus energy building.

Haus der Zukunft

Energy relevant and ecological monitoring studies of demonstration buildings, which were built in the framework of the program "Haus der Zukunft".

Energy relevant and ecological monitoring studies of demonstration buildings, which were built in the framework of the program "Haus der Zukunft". The user acceptance should also be levied and displayed

Stadt der Zukunft

Energy2POG - Hybrid Energy Cluster Pogusch - Renewable energies and cost-efficient operation

The aim of the project was the design, optimisation and demonstration of a hybrid energy supply system as well as optimised material flows for a restaurant and hotel business in an exposed location. The concept allows the integration of material flows into the heat and energy supply system.

Haus der Zukunft

Evaluation of mechanical class room ventilation systems in Austria and generation of a planning guideline

Accumulation of technical solutions and practical experience of schools (kindergarten) with mechanical ventilation systems and identification of how pupils and teachers accept the systems.

Haus der Zukunft

First energy autonomous revitalization of an urban former industry quarter with the standard type of "Passive House" to reduce primary energy max. 100 kWh/m2 NFL

A renovation with the energy efficient factor 10+ of a former industry quarter in the standard type of passive house with usage of the most modern technologies and locally renewable energy resources.

Haus der Zukunft

GreenPlusSchool@urban - Highly efficient facade and roof greening in combination with PV; optimal solution for energy efficiency in overall environmental consideration

In this project, different building-greening systems and plant/substrate types, combined with various PV modules, had been examined on a Viennese school. The influence on the hygrothermal behaviour of the building, energy-saving potential, humidity, shading, noise reduction, water retention and heat island effect are being scientifically explained. The students of the school will also be involved.