Search results

There are 515 results.

Haus der Zukunft

"Building of Tomorrow" in the media

Press support for "Building of Tomorrow"

Haus der Zukunft

"Building of Tomorrow" on the road - knowledge transfer of the results from "Building of Tomorrow" to existing traineeships

Knowledge transfer of the programme "Building of Tomorrow" to specialists on universities, advanced technical colleges, polytechnics, construction academies, administration academies. Themes: Energy, Construction and Building Physics, Ecology and Architecture and Sociology.

Haus der Zukunft

"Communal living for elderly - ecological, social and economical aspects" - eco-com.60+

The research project examined different forms of communal living of elderly people and contributes to the development of new, common forms of living for the elderly. Questions concerning demographic change and economic as well as ecologic challenges of our time had been dealt with.

Stadt der Zukunft

"Gasthermenersatz" - Modular heat pump with environmentally friendly refrigerant to replace natural gas-based heating systems in large-scale residential buildings

The project "Gasthermenersatz" aims at developing, manufacturing, and testing a functional prototype of a decentralized, sound-optimized heat pump solution with refrigerant circuit modules connected in series or parallel. This renewable technology is well-suited to replace existing natural gas-based heating systems in large-scale residential buildings and to pave the way to carbon-neutral cities.

Haus der Zukunft

"gugler! build & print triple zero" - Subproject 7: Integrated General Planning

The aim of the subproject 7 is to aggregate a "normal" general planning process with innovative additional services. In the spirit of integrated planning in the design a higher number of design parameters must be resolved. This is different to a classic planning process with linear and chronological lined up add ons.

Haus der Zukunft

"gugler! build & print triple zero" - Subproject 8: Leuchtturm gugler – Ökoeffektive Plusenergiedruckerei

On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building had been developed.

Haus der Zukunft

"gugler! build & print triple zero" - subproject 1: lead project management

The lead project management provides furthermore for sufficient interlinking between the project partners by monthly, by requirement weekly project workshops. Besides the leading project management represents the project gugler to the outward and takes part in workshops of the program management

Haus der Zukunft

"gugler! build & print triple zero" - subproject 2: building with recycros

Building with recycros is working out basics in order to close the cycle of materials in the building sector as well as to increase the usage of recycled materials (recycros). The existing material cycles in the building sector are going to be analysed. Furthermore, there will be a catalogue presented, covering the actual situation of which materials are used in today´s engineering and how the waste is treated. The project will be completed with a summary of results and a proposal of concrete materials and constructional systems for the building project gugler.

Haus der Zukunft

"gugler! build & print triple zero" - subproject 3: recyclable constructing

Development of basic principles and proposals for highly recyclable constructions. A catalogue with main principles of recyclable designing with a particular focus on material inherent bonding and joint techniques as well as a selection of constructions including ecological benchmarks, calculation of building physics plus costs was created.

Haus der Zukunft

"gugler! build & print triple zero" - subproject 4: energy concept Gugler

The energy concept led Gugler in frame of the conversion and expansion of the company towards plus-energy standard. Significant measures ware a consequent maximum reduction of the energy demand, optimal utilisation of industrial waste-heat, maximum consumption of on-site energy sources, integrated energy production, ecologic load manage­ment with comprehensive response- and storage-techniques.

Haus der Zukunft

"gugler! build & print triple zero" - subproject 5: Ecoeffective building

On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building will be developed.

Haus der Zukunft

"gugler! build & print triple zero" - subproject 6: Integration of the C2C production into the flagship project Gugler

Print and media production at the media and communications company gugler GmbH are currently being optimized according to Cradle to Cradle (C2C) criteria. The goal of this subproject is to allow the demands of a C2C production process optimized for exchange with biological cycles to be included into the general planning of the new production building of the company, a pilot project within the "building of tomorrow" program line.

Haus der Zukunft

"gugler! build & print triple zero" - subproject 9: Monitoring Gugler - Monitoring, evaluation, optimization GUGLER

The project objective is the measurement of relevant building values (energy consumption, ...), the evaluation of these values compared with the intended objectives and the optimization of the system based on the measured data. As a special innovation, monitoring the storage of alternatively generated electricity using photovoltaic and wind energy in the form of compressed air must be considered.

Stadt der Zukunft

# Murau : Real-World Laboratory of energy transition for inner-alpine regions

Inner-alpine regions are rich in the natural resources water, sun, wind and biomass. This study investigates how the Murau region can become a stable and fail-safe, renewable 100% region and how it is possible to supply the energy-hungry conurbations as a needs-based energy export region.

Haus der Zukunft

(energy central 400+) Marketable energy central from 400 kW with innovative, simple electricity conversion for residential building, public utility and commercial objects

Development of a marketable, decentralised "energy central" on a scale from 400 kW for the generation of electricity, heating (and cooling) for residential building, public utility and commercial objects, with a broad variety of applicable fuels on the base of regionally available biogenous residual materials.

Haus der Zukunft

1000 passive houses in Austria - 2nd documentation period 2004 - 2005

2nd documentation period of the joint project of IG Passivhaus Österreich under the programme line "Building of tomorrow", an initiative of the Federal Ministry of Transport, Innovation and Technology (BMVIT) to set up a detailed network documentation on a representative cross-section of all passive houses in Austria.

Haus der Zukunft

1000 passive houses in Austria - 3rd documentation period 2006 - 2008

3rd documentation period of the joint project of IG Passivhaus Österreich to set up a detailed network documentation on a representative cross-section of all passive houses in Austria.

Stadt der Zukunft

3D*3B - 3D-Concret Printing, Reinforcement for low carbon and bending stressed structures.

The project is about 3D printed structural elements and their integration in building structures. The focus is predominantly set on bending stresses structural elements like panels and slabs. Results will point out technical, logistic and climate relevant aspects.

Stadt der Zukunft

50 green houses - Development and demonstration of a low-tech façade greening system

Development of a cost-efficient all-in façade greening system („Greening-Toolkit“) including a maintenance concept, involving all trades and processes, for a broad (facing roads) implementation on facades in the urban built environment, combined with a process innovation for simplification of all necessary coordination processes.

Stadt der Zukunft

6D BIM-Terminal: Missing Link for the development of CO2 neutral buildings

The present project aims to close the gap between specialist consultants and Building Information Modeling (BIM) applications. For that, relevant data for cost estimation, scheduling construction planning and management or sustainable building operation and facility management, shall be added automatically to BIM elements and imported into the respective specialist planning software. This data exchange shall be carried out using IFC interface according to ÖNORM A6241-2 and the properties of the ASI properties server via a central platform, the "6D BIM-Terminal".