Suchergebnisse

Haus der Zukunft

Passivhauswohnen³: Facility Management for Residential Property Developers: A Key to Optimizing the Reduction of Energy and Operation Costs

What soon will be considered "standard" in ecological building must be carried out by the property developer and accepted by the future user. Therefore, in order to assist a smooth implementation of the new passive housing technique and begin the corresponding feedback mechanisms, a specific KMU "quality and incentive model" should be launched. The interrelationship of this model is designed with the property developer as well as the user in mind and aims for lasting "behavior modification" in energy and operational expense consumption.

Haus der Zukunft

SolarCooling Monitor - Evaluation of energy efficiency and operation modes of solar cooling systems for air-conditioning in buildings in Austria

Evaluation of ten newly installed solarthermal cooling systems in Austria as well as a large-scale plant in Lisbon to identify the plant’s performance using a monitoring analysis and comparing simulation.

Haus der Zukunft

Energy relevant and ecological monitoring studies of demonstration buildings, which were built in the framework of the program "Haus der Zukunft".

Energy relevant and ecological monitoring studies of demonstration buildings, which were built in the framework of the program "Haus der Zukunft". The user acceptance should also be levied and displayed

Stadt der Zukunft

SUBURBAHN – test- and demonstration-area for urban development and mobility around public transport stations in the central area of Upper Austria

Targeted, process-oriented conception for the implementation and operation of a test- and demonstration-area for urban development and mobility in Ansfelden involving relevant scientific stakeholders, local and regional stakeholders, decision-makers as well as the interested public according to the living lab approach.

Haus der Zukunft

Active know-how-transfer sustainable building with renewable raw materials - lecture in theory and practice at the Technical University of Vienna

Lecture "Sustainable Building with Renewable Resources" focusing on theoretical and practical knowledge of straw bale building and including relevant research results of "Building of Tomorrow "

Haus der Zukunft

Experiences and attitudes of users as a basis for the development of sustainable housing concepts with high social acceptance

The aim of this project was to a) analyse current experiences of users of ecologically innovative residential buildings ("passive houses", solar houses, etc.) in Austria, b) to evaluate innovative housing concepts in focus groups, and c) to create a model for the continuous participation of users in the innovation process.

Haus der Zukunft

SIMULTAN - Simultaneous planning environment for buildings in resilient, highly energy efficient and resource-efficient districts

This project enabled the opportunity for an essential energy efficiency increase within overlapping buildings, to achieve the objective of resilient cities and districts with respect to a high quality of life, resource sustainability and energy efficiency. The goal was a workable tool based on a multidisciplinary planning approach, to support the decision finding process in order to design both refurbishment projects and new developments within a highly efficient city.

Haus der Zukunft

SynENERGY - Energy optimised settlement development by making use of synergies of energy efficiency, spatial planning and building culture

SynENERGY aims at an innovative, holistic approach to urban district optimization. The project targets a comprehensive analysis of the framework and urban development concept which includes not only optimisation of sustainable energy supply and use but also increased material flows (construction and disposal) at urban district level.

Haus der Zukunft

aspern Vienna´s Urban Lakeside - subproject 5: Monitoring of Energy Consumption in Demonstration Buildings in Seestadt Aspern

Goal of the project is to develop a monitoring tool that allows to predict the expectable (final) quality of the residential buildings based on decisions made during the planning and construction phase. For this purpose, the current certification tool for the determination of "TQB-points" will be equipped with "interim" certifications, which shall allow the land developer to carry out a quality monitoring parallel to the construction phase. The tool will be tested with the data obtained from selected construction projects during the first residential development phase in seestadt aspern.

Haus der Zukunft

ABC - DisposaL - Assessment of Building and Construction - Disposal LCA Indicators for the disposal performance of construction

A framework of assessment for the disposal of building materials, constructions and buildings will be developed. The results will be included in the OI3-indicator and in the building assessment tool Total Quality Building. Demonstration projects of the programme Building of Tomorrow will be assessed with the new method.

Haus der Zukunft

International Symposium: Photovoltaic - Electricity from the Sun: Research - Marketing - Dissemination (Vienna, Austria)

2002-09-13 / 2002-09-14


Vienna, Chamber of Commerce Wiedner Hauptstrasse 63, A-1041 Vienna

Information about the activities in IEA-Photovoltaic Power Systems Program; experiences and status of PV in different countries, marketing, promotion incentives and dissemination strategies for photovoltaics, RTD and training.

Haus der Zukunft

Hygrothermal behaviour of double-skin facades in solar irradiation - theory evaluation by means of on-location measurements

Detailed clarification of the base parameters of thermodynamic simulation calculations by means of on-location measurements on the five-storey double-skin facade of the Federal Institute of Social Education in Baden bei Wien

Stadt der Zukunft

Ice-storage NEW - New economical ice storage concept for optimized heat storage using heat pumps and peak use of wind power

Development of a technically and economically optimized new ice-storage concept as a thermal wind power peak storage and to improve the performance of heat pumps as a contribution for peak smoothing of the electrical load profile.

Stadt der Zukunft

Sani60ies - Demonstration of minimally invasive thermal and energetic refurbishment of classic 1950s and 1960s apartment buildings

System development of a façade-integrated building component activation for "warm" refurbishments with high transfer potential to buildings of classic apartment complexes from the 1950s and 1960s. The system is being tested and further developed based on three building projects and demonstrated through broad application (over 200 flats).

Haus der Zukunft

Gründerzeit with future - subproject 4: Development of a real estate portfolio management tool for real estate trustees and owners

Development of a portfolio management tool for the administration of real estate technical data and to support the decision-finding process related to renovation of "Gründerzeit" buildings. The management tool will be applied in practice, in the demonstration projects implemented within the flagship project "Innovative Modernisation of Wilhelminian style "Gründerzeit" Buildings". The results will be available in the form of check-lists and guidelines applicable in the decision-finding process related to renovation measures.

Haus der Zukunft

Renew Building - Competence Building and Knowledge Transfer for Climate-friendly renovation with ecological and renewable materials

The project Renew Building provided knowledge about eco-friendly renovation to the target groups (planners, architects, students of architecture, etc.) through theory and practice classes, lectures, an e-learning platform, and in an online knowledge database.

Haus der Zukunft

Development of the first legally compliant verification procedure for plus-energy buildings by a complete revision of the ÖNORMS

Within the project the current Austrian standards concerning building services and building physics have been revised and further developed to provide the designers with standardized calculation algorithms for the design of plus-energy buildings.

Haus der Zukunft

Development of a strategy for industrialized serial production of ecological passive houses made out of renewable resources

Development of a strategy for industrialized seria. production of ecological passive solar houses made out of building materials based on renewable resources as foundation for the dissemination of sustainable solutions for the production of prefabricated houses and of single houses.

Energiesysteme der Zukunft

Workshop: Technologies for solar cooling in tropical climates & guided tour of world´s largest solar cooling System

5. April 2013
Singapore, SG

Main topics of the Singapore workshop: Absorption chilling, Desiccant technologies, Heat rejection, Economics, financing

Haus der Zukunft

EKZ - EnergieKompetenzZentrum Großschönau: "Sonnenplatz - 1. European passive house village for test-living" phase of realisation

Integrative approach for the diffusion of the ecologic passive house: village of passive houses for test-living with an Energy Competence Centre on the basis of a sustainable concept for settlement development at Großschönau.