Suchergebnisse
Criteria catalogue for quality assurance in the construction of passive houses built in wood
By means of a criteria catalogue possible sources of error in the construction of passive houses built in wood will be identified both craft specific and concerning the installation of house automation facilities. Solutions will be acquired, a controlling tool for construction sites will be offered.
aspern Vienna´s Urban Lakeside subproject 8: Overall Project Management Landmark Project "aspern+"
The Overall Project Management of the "Leitprojekt" includes the handling and supervision of the sub-projects, the reporting to the programme management and additionally the preparation and distribution of relevant results. Beyond that the project management is responsible to highlight possible synergies within other projects and to - if necessary - include these within the next steps.
Energybase - The Office Building of Tomorrow
Planning and implementing a demonstration building as part of "Building of Tomorrow"
Forschungsforum
3/2010
Herausgeber: BMVIT
Englisch, 6 Seiten
Downloads zur Publikation
Conference: Central Europe towards Sustainable Building
24. - 26. Sep 2007
Czech Technical UniversityPrague, CZ
CESB 07
"gugler! build & print triple zero" - subproject 1: lead project management
The lead project management provides furthermore for sufficient interlinking between the project partners by monthly, by requirement weekly project workshops. Besides the leading project management represents the project gugler to the outward and takes part in workshops of the program management
ÖkoInform:2 - Platform for Exchange of Information in Green Building
A platform for the exchange of information to promote the better integration of ecological materials and renewable resources in the research programme "Building of Tomorrow"
Brochure: Technical Guide - Innovative Buildings in Austria
Austrian demonstration buildings and flagship projects within the research programme "Building of Tomorrow"
Herausgeber: BMVIT
Englisch, 84 Seiten
Downloads zur Publikation
"gugler! build & print triple zero" - subproject 3: recyclable constructing
Development of basic principles and proposals for highly recyclable constructions. A catalogue with main principles of recyclable designing with a particular focus on material inherent bonding and joint techniques as well as a selection of constructions including ecological benchmarks, calculation of building physics plus costs was created.
Building innovations from Austria
Pioneering technological developments – internationally approved
energy innovation austria
1/2017
Herausgeber: BMVIT und Klima- und Energiefonds
Englisch, 8 Seiten
Downloads zur Publikation
ZSG - Sustainable Concepts in urban redevelopment and building refurbishment
Project on research and implementation for ecological and energy efficient concepts, urban redevelopment and building refurbishment. Performance of a routing project on a former ter-ritory of the Austrian armed forces in Steyr.
Sprayed-on and Plaster-covered Cellulose-insulation without vapour barrier
Investigations on the fundamental suitability of sprayed-on and plaster-covered cellulose insulation for thermal insulation of buildings.
1000 passive houses in Austria - 3rd documentation period 2006 - 2008
3rd documentation period of the joint project of IG Passivhaus Österreich to set up a detailed network documentation on a representative cross-section of all passive houses in Austria.
Gründerzeit with future - sub project 2: Foundations and feasibility studies
Documentation of available knowledge on the renovation of historical buildings ("Gründerzeitgebäude") as an input for the preparation of 5 demonstration projects as well as the development of an accompanying monitoring system within the scope of the project "Gründerzeit with future".
Platform for Energy-Efficient Hospitals - ways to a higher energy-efficiency
The present project is based on the results of the project "The energy-efficient hospital: realistic departure points and identification of possible measures"
ECR Energy City Graz - subproject 3: +ERS - Plus Energy Network Reininghaus Süd
The multifunctional neighbourhood "+ERS - Plus Energy Network Reininghaus Süd" was realized within the urban planning area of Graz-Reininghaus. The project aims to optimize the energy concept of the single buildings as well as of the building cluster in order to achieve a plus-energy standard within the residential neighbourhood.
Innovation in LARGE-SCALE
Demonstration buildings within the "BUILDING OF TOMORROW" subprogram
Forschungsforum
4/2006
Herausgeber: BMVIT
Englisch, 6 Seiten
Downloads zur Publikation
Cepheus Cost Efficient Passive Houses As European Standards
Austrian participation in a project within the Thermie-progra of the European Comission
Forschungsforum
2/2001
Herausgeber: BMVIT
Englisch, 6 Seiten
Downloads zur Publikation
Rebuilding of the organic farm Achleitner, straw & clay - room climatisation with plants
Rebuilding of a marketing-, store- and processingcenter with an organic freshmart and an organic restaurant in passivhouse quality. Application of regional building materials, an innovatve overall energyconcept, climatisation with plants.
Certified passive attic conversion of a typical building from the period around 1900
Conversion of an attic of a typical building from the period about 1900 to a passive attic with photovoltaic system and renovation of the existing building equipment. The aim is to keep the additional construction costs under 10 %, to avoid overheating in summer and to make possible a reproduction for the large amount of buildings from the same period.
ThermSat - pilot training program "Thermal renovation engineer in construction industry"
The goal was to design, offer, evaluate and refine a practical training, adapted to the current development. Aim of the courses is to have well-trained engineers and technicians with practical and theoretical knowledge in the field of thermal renovation of buildings.