Suchergebnisse
Transferproject: Professional strawbale building - "Virtual building-site", exhibition and instruction material
Strawbale-workshops are considered as the best way to inseminate this ecological building-technique. The "virtual building site" has some decisive advantages over the common situation: it does not depend on the weather, allows the comparative study of different constructing methods and can, as a permanent installation, be used as an exhibition.
Voltage stabilization by central reactive power control of biogas power plants (Virtual Biogas Power Plant)
A virtual power plant, combining 20 agricultural biogas plants is planned in the south-eastern part of the State of Styria (A). The aim of the project is to realize a central reactive power control system of the biogas plants. Active power of this biogas plants ranges between 1 and 3 MW. Specific goals of the project are increasing grid stability, decreasing long distance reactive power transmission, decreasing energy losses, and decreasing utility costs.
Evaluation of mechanical class room ventilation systems in Austria and generation of a planning guideline
Accumulation of technical solutions and practical experience of schools (kindergarten) with mechanical ventilation systems and identification of how pupils and teachers accept the systems.
Life Cycle Cost Forecasting Model - Real Estate-Database analysis for life-cycle based investment decisions
Estimation of operational costs of buildings based on a "cause/effect model" between technical building characteristics, investment and running costs to support the decision making process in early planning stages regarding energy efficient buildings.
Evaluation of solar-thermal energy stores using a uniform and marketable system of characteristic numbers
Comparison of solar-thermal energy stores A clear and uniform system of characteristic numbers enables a cost-saving comparison of the efficiency of solar-thermal energy stores of different technologies for the first time and gives important impulses for the market.
Legal, economical and technical preconditions for the feed-in of biogas into the Austrian natural gas grid
Legal, economical and technical preconditions for a successful introduction and market development of fermentation gas feed-in to the Austrian natural gas grid. Appropriate legal and financial support regulations. Calculation basis for demonstration plants.
StromBIZ - demonstration projects: business models for decentralized electricity generation and distribution
Feasible business models to utilize locally generated renewable energy are expected to induce a tipping point for the "Energy Turnaround" in Austria. Within the proposed project a number of demonstration PV plants on residential and non-residential buildings had been realized. On this basis new approaches of business cases had been developed, implemented, tested and disseminated.
Sustainable product service for raising the energy efficiency of injection moulding machines for plastics
Performing a feasibility study of establishing a sustainable product service for raising the energy efficiency of injection moulding machines for plastics via analysing the basic organizational and technical conditions.
New Conceptions for elderly people in new construction and renewal

Development of a catalogue of criteria for senior-housing and detailed implementation plans of a new building and/or of a reorganization project in Vienna, located in the 16th district; Costs and comparison analysis between "ordinary" New building and/or "ordinary" Reorganization and senior-housing new buildings and/or renewal
Social Acceptance Of Wind Power In Austria

An analysis of the social processes involved in the installatio of wind power plants
Forschungsforum
1/1999
Herausgeber: BMVIT
Englisch, 6 Seiten
Downloads zur Publikation
Fuel Cells -Energy Technology Of The Future?

Austrian Strategies in the Field of Fuel Cell Research and Technology Development
Forschungsforum
3/2002
Herausgeber: BMVIT
Englisch, 6 Seiten
Downloads zur Publikation
Ecobuilding - Building Optimisation with Total Quality (TQ) Assessment

The construction, use, and disposal of buildings cause expenses, material flows, energy consumption, and emissions. With intelligent design, construction, management, and marketing, it is possible to reduce environmental burdens and costs, improve building quality, and increase building value.
Entwicklung eines Passivhausfensters mit integriertem Sonnenschutz

Entwicklung eines Holz/Alu-Passivhausverbundfenster mit integriertem Sonnenschutz in Form einer Jalousie oder eines Faltstores.
Gründerzeit der Zukunft - Subprojekt 5: Dokumentation und Monitoring
Ziel sind die Dokumentation und das begleitende Monitoring der im Rahmen des Leitprojekts "Gründerzeit mit Zukunft" umgesetzten Demonstrationsprojekte hinsichtlich der umgesetzten Maßnahmen und deren Kosten im Bau und im laufenden Betrieb sowie im Hinblick auf die energetischen Effekte und die Komfortbedingungen und auf die NutzerInnenzufriedenheit und die Erfahrungen mit den Sanierungsprozessen.
Semi-manual dismantling of small electric and electronic equipment
Improving the tecnology of manual dismantling processes of small electric and electronical appliances, used in social enterprises. Via software modules, developed do analise dismantling processes, from dismantling-factories to dismantling-parks.
"gugler! build & print triple zero" - subproject 2: building with recycros
Building with recycros is working out basics in order to close the cycle of materials in the building sector as well as to increase the usage of recycled materials (recycros). The existing material cycles in the building sector are going to be analysed. Furthermore, there will be a catalogue presented, covering the actual situation of which materials are used in today´s engineering and how the waste is treated. The project will be completed with a summary of results and a proposal of concrete materials and constructional systems for the building project gugler.
Gründerzeit with future - subproject 5: Documentation and monitoring
The main aim is the documentation and monitoring of the demonstration projects within the scope of the project "Historical buildings of tomorrow" with regard to the technical implementation, investment and operation costs and to the energetic performance. All demonstration projects will be accompanied by an evaluation process regarding occupants' satisfaction and the refurbishment process. Beyond that, legal constraints for innovative refurbishment of historical buildings will be documented and proposals for adaptations of the rental law and refurbishment subsidy schemes will be developed.
Analyse der Sperrwasserkosten in der Papier- und Zellstoffindustrie
Aus den erhobenen Daten soll ein Werkzeug zur Selbstanalyse für die Betreiber von Stoffpumpen entwickelt werden, welches das Einsparungspotential (Energie, Betriebskostosten, Frischwassermenge, ... ) ermittelt.
Quantitative Indikatoren für die Biobasierte Industrie in Österreich
Im Zuge des Projekts Quantitative Indikatoren für die Biobasierte Industrie in Österreich wird mit Hilfe ausgewählter Strukturmaßzahlen, insbesondere des Revealed Comparative Advantage (RCA) Index, ein fundierter Überblick zum Status Quo der thematischen Spezialisierung der österreichischen biobasierten Industrie im internationalen Vergleich gegeben.
Energietechnologien - Von der Forschung bis zum Markt
22. Juni 2017, 10 Uhr
BMVIT, Radetzkystraße 2, 1030 Wien, Raum EA08
Im Mittelpunkt dieser Veranstaltung stehen die Energieforschungserhebung, die Marktstatistik von Technologien zur Nutzung Erneuerbarer Energien sowie die Umwelttechnikwirtschaft für das Datenjahr 2016