Suchergebnisse

Internationale Energieagentur (IEA)

IEA DSM Task 17: Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages

The main objective of the proposed Task is to study how to achieve the optimal integration of distributed generation, energy storages and flexible demand, and thus increase the value of distributed generation and demand response and decrease problems caused by intermittent distributed generation (mainly based on RES) in the physical electricity systems and at the electricity market. The Task deals with distributed energy resources both at local (distribution network and customer) level and at transmission system level where large wind farms are connected.

Internationale Energieagentur (IEA)

Technology Roadmap: Solar Heating and Cooling


Herausgeber: International Energy Agency
Englisch, 50 Seiten

Downloads zur Publikation

Internationale Energieagentur (IEA)

IEA-4E Bright Spark Newsletter, December 2014


Herausgeber: IEA - 4E Bright Sparks
Englisch, 4 Seiten

Weitere Informationen

Internationale Energieagentur (IEA)

IEA Solar Heating & Cooling Annual Report 2011

International Energy Agency Englisch, 144 Seiten

Downloads zur Publikation

Weitere Informationen

Internationale Energieagentur (IEA)

IEA PVPS Task 12: Photovoltaics Sustainability (working period 2018 - 2021)

The aim of IEA PVPS Task 12 is to foster international collaboration in the area of photovoltaics and environment. That includes compiling and disseminating accurate information on environment, health, safety, and other aspects of sustainability associated with the life-cycle of photovoltaics. Results are guidelines and data basis in order to harmonize LCAs and studies on future environmental impacts of PV and PV recycling. The Austrian contribution addresses LCA and implementation of sustainability aspects.

Internationale Energieagentur (IEA)

IEA PVPS Task 17: Photovoltaik for Transport (working period 2018 - 2021)

The IEA PVPS Task 17 focuses on the potential contributions of PV technologies to the transport sector as well as on the expected market potential of PV application in the transport sector.

Internationale Energieagentur (IEA)

IEA PVPS Task 14: High Penetration of PV Systems in Electricity Grids (working period 2014 - 2018)

The IEA-PVPS Task 14, led by Austria as Operating Agent, promotes the use of grid connected PV as an important source in electric power systems on a high penetration level where additional efforts may be necessary to integrate the dispersed generators in an optimum manner. In a number of case studies from the participating countries, the challenges and approaches in the field of distribution networks, system management and power electronics components were shown in an international context. The result being elaborate reports with targeted recommendations and required measures to significantly increase the share of photovoltaics in electricity grids.

Internationale Energieagentur (IEA)

IEA Wind Task 27: Small Wind Turbines in High Turbulence Sites (working period 2018 - 2019)

By participating in the IEA Wind Task 27, a number of goals could be achieved, including the development of a site assessment scheme for wind turbines in areas with high turbulence intensities, the further development of the IEC 61400 standard, the participation in the “Compendium of IEA Wind TCP Task 27 case studies “And the update of the “Small Wind Power Report 2018” as well as activities such as holding the event “Small Wind Power Conference” in Austria.

Internationale Energieagentur (IEA)

IEA Bioenergy - The impact of indirect land use change (2009)

This publication provides the summary and conclusions from the workshop Bioenergy - The Impact of Indirect Land Use Change, held in conjunction with the meeting of the Executive Committee of IEA Bioenergy in Rotterdam, the Netherlands, on 12 May 2009. Englisch

Internationale Energieagentur (IEA)

IEA PVPS Task 12: PV Environmental Health And Safety (working period 2016-2018)

The aim of IEA PVPS Task 12 is to foster international collaboration in the area of photovoltaics and environment. That includes compiling and disseminating accurate Information on environment, health, safety, and other aspects of sustainability associated with the life-cycle of photovoltaics. The austrian contribution addresses LCA, implementation of sustainability aspects and dissemination.

Internationale Energieagentur (IEA)

IEA Wind Task 19: Wind Energy in Cold Climates (working period 2013 - 2015)

The international experts elaborated two guidelines on the current state of wind energy utilization under icing conditions: the "State of the Art Report" and the "Recommended Practices Report". On a national level, Energiewerkstatt compiled a comparative report on international approval procedures with the assessment of icefall risk, a report regarding operational experience with a stand-alone power supply unit as well as a report on the evaluation of different ice detection systems.

Internationale Energieagentur (IEA)

IEA Wind Task 27: Small Wind Turbines in High Turbulence Sites (working period 2016 - 2018)

Since 2013 Task 27 is focussing on small wind turbines (SWT) in high turbulence sites. By actively participating in the IEA Implementing Agreement Wind Energy Task 27, Austria’s stakeholders will become participants in the global small wind network. The establishment of a national working group as well as the organisation of an annual small wind conference in Austria will foster a durable collaboration and provide new impetus to the Austrian Small Wind Community.

Internationale Energieagentur (IEA)

IEA 4E Annex Electronic Devices and Networks Annex - EDNA (working period 2017 – 2019) Task 3: "Intelligent efficiency". Project: "Basket of products testing"

The "Electronic Devices and Networks Annex “EDNA” has emerged from the background of the global increase of electronic devices and digital solutions, which requires the evaluation of the energy efficiency of these devices. Energy efficiency measures should be developed and improved, and technological and regulatory challenges need to be addressed. The aim of EDNA is to develop policy and strategy recommendations for decision-makers, concerning network connected devices.

Internationale Energieagentur (IEA)

IEA Wind Task 27: Small Wind Turbines in High Turbulence Sites

To ensure safety, reliability and productivity of small wind turbines (SWT) the experts of IEA Wind Task 27 developed a standard consumer label for small wind turbines. Since 2013 Task 27 is focussing on small wind turbines in high turbulence sites. By actively participating in the IEA Implementing Agreement Wind Energy Task 27, Austria’s stakeholders will become participants in the global small wind network. The establishment of a national working group as well as the organisation of an annual small wind conference in Austria will foster a durable collaboration and provide new impetus to the Austrian Small Wind Community.

Internationale Energieagentur (IEA)

IEA-PVPS Task 13: Performance and Reliability of Photovoltaic Systems (working period 2010-2018)

The Task 13 provides a common independent platform whereby quality aspects of PV systems and its components are elaborated and exchanged amongst the stakeholders, and disseminates this knowledge to different market actors.

Internationale Energieagentur (IEA)

IEA PVPS Task 14: High Penetration of PV Systems in Electricity Grids (working period 2010 - 2014)

The main goal of Task 14 is to promote the use of grid-connected PV as an important source in electric power systems at the higher penetration levels that may require additional efforts to integrate dispersed generators. The aim of these efforts is to reduce the technical barriers to achieving high penetration levels of distributed renewable systems.

Internationale Energieagentur (IEA)

Highlights of Energy Research 2018 - System Integration and Sector Coupling

March 20th, 2018, 9:00 - 16:30
TUtheSky, Getreidemarkt 9, Vienna

The 11th Highlights of Energy Research will focus on system integration and coupling of sectors. National and IEA research projects in the areas of energy systems and grids, industry, mobility and buildings and urban systems will be presented.

Internationale Energieagentur (IEA)

Advanced Fuel Cells - Newsletter 05, November 2014

Schwerpunktthemen des Newsletters sind das 48. Meeting des Executive Committees in Seoul sowie nationale Updates von Süd Korea, Mexiko und Deutschland.
Herausgeber: IEA Advanced Fuel Cells Implementing Agreement
Englisch

Weitere Informationen

Internationale Energieagentur (IEA)

Mitteilungsblatt "Biobased Future" - Nr. 4/Juli 2015

Mitteilungsblatt über Biomasse für Energie und Industrie in einer nachhaltigen Wirtschaft
Herausgeber: Bioenergy 2020+

Downloads zur Publikation

Weitere Informationen

Internationale Energieagentur (IEA)

IEA IETS Task 22: Climate Resilience and Energy Adaptation in Industry under Uncertainty (working period 2024 - 2026)

The main objective of this task is to promote understanding and progress in digitalization, artificial intelligence (AI), and related technologies in order to enable climate resilience (extreme weather and events) and energy adaptation (electricity, heating, and sector coupling) in energy-intensive industries. Specifically, the challenges of energy flexibility and demand response will be identified by means of surveys of Austrian stakeholders and the results presented nationally in a workshop format.