Suchergebnisse

Internationale Energieagentur (IEA)

EmPOWERing All: Inclusive Energy Transitions

24 April 2024, 9:30 - 17:30h
Festsaal (BMK), Radetzkystraße 2, 1030 Vienna / online

This event offers a unique opportunity for key stakeholders in the field of inclusive and sustainable energy transition to come together and learn about the research results and actions of the IEA UsersTCP - Gender and Energy Task and discuss future developments and challenges in this field.

Internationale Energieagentur (IEA)

Energy research expenditure - corporate sector in Austria 2021

759.8 million in research expenditure was allocated to the topic of energy by domestic companies in 2021. This figure was 16% higher than the comparable figure from the 2019 survey. The report contains detailed figures and analyses of various technologies with regard to company and public R&D investments. 6/2024
A. Indinger, F. Bettin
Herausgeber: BMK, 2024
Deutsch, 66 Seiten

Internationale Energieagentur (IEA)

IEA AFC Annex 33: Stationary Applications (Working period 2017 - 2019)

The main objective of Annex 33 is to support the technology development of key components and systems. Market implementation and transformation will be supported by the analysis and development of the necessary political framework and instruments. The current technological, economic and political barriers are to be identified, solutions developed and the barriers gradually removed.

Internationale Energieagentur (IEA)

IEA AFC Annex 35: Fuel cells for portable applications (Working period 2017 - 2019)

The aim of Annex 35 is the information exchange on the status and new developments of portable fuel cell systems and comprises the development and manufacture of membrane electrode assemblies (MEAs) all the way through to system components such as electronic converters or gas supply units. In addition the setup and configuration of hybridized systems and the key topics of secure operation, codes and standards are of interest.

Internationale Energieagentur (IEA)

IEA AFC Annex 31: Polymer electrolyte membrane fuel cell (Working period 2017 - 2019)

Task 31 is a research and development oriented Task with the objective to contribute to the identification and development of techniques and materials to reduce the cost and improve the durability of polymer electrolyte fuel cells (PEFCs).

Internationale Energieagentur (IEA)

IEA AFC Annex 35: Fuel cells für portable applications (Working period 2014 - 2017)

The aim of Annex 35 of Technology Collaboration Programm on Advanced Fuel Cells of the International Energy Agency (IEA) included information exchange on the status and new developments of portable fuel cell systems such as the direct ethanol fuel cell (DEFC) and the direct borohydride fuel cell (DBFC) and comprised the development and manufacture of membrane electrode assemblies (MEAs) all the way through to system components such as electronic converters or gas supply units.

Internationale Energieagentur (IEA)

IEA AFC Annex 31: Polymer Electrolyte Fuel Cells

Task 31 was a research and development oriented Task with the objective to contribute to the identification and development of techniques and materials to reduce the cost and improve the durability of polymer electrolyte fuel cells (PEFCs).

Internationale Energieagentur (IEA)

6th SOPHIA Photovoltaic Reliability Workshop

28. - 29. April 2016
AIT Tech Base, 1210, Giefinggasse 2Vienna, AT

The 2016 workshop will feature reliability aspects in connection to building integration with focus on innovative functional materials and components as well as detailed discussions on PV system reliability.

Internationale Energieagentur (IEA)

IEA ISGAN Working Group 6 Transmission and Distribution Network Systems (working period 2023-2024)

IEA ISGAN Working Group 6 addresses the challenges in the overall system of transmission and distribution networks for electricity. The results will improve the understanding of the impact of smart grid technologies on the overall system performance, transmission capacities and operational management of public electricity supply systems. In the project years 2022-2023, international pilot projects on flexibility use and the necessary interaction of transmission and distribution grid operators will be summarised and conclusions drawn.

Internationale Energieagentur (IEA)

IEA Cities Task 2: Data for Urban Energy Planning (Working period 2025 - 2029)

Cities consume 60–80% of the globally produced energy and play a central role in the energy transition. However, they face challenges such as insufficient data, missing methodologies, and legal barriers. The project offers practical solutions, best practice examples, and tools for urban energy planning. The focus is on international knowledge exchange, improved data access and quality, as well as collaboration with multipliers and municipalities.

Internationale Energieagentur (IEA)

IEA ISGAN Annex 6: Electricity Transmission and Distribution Systems (working period 2021-2022)

ISGAN Annex 6 deals with the possible system-related challenges in the development of future smart grids. Austria is leading Task 4 Interaction of Transmission and Distribution Networks. The main topic in the work program relates to flexibility topologies within transmission and distribution grids. The results and analyses had been published on the one hand in a discussion paper and in condensed form in a video. Communication and dissemination activities were targeted and conducted to different stakeholder groups.

Internationale Energieagentur (IEA)

IEA ISGAN Annex 7: Smart Grid Transitions (Working period 2020-2023)

ISGAN Annex / Working Group 7 explored how Smart Grids can support the energy transition. Focus areas included transition processes, governance, market development, and decentralized actors like prosumers. Results were shared through policy briefs, publications, and workshops. An international Community of Practice connects policymakers from ministries, regulatory agencies, and funding bodies and fosters smarter energy systems.

Internationale Energieagentur (IEA)

IEA-ISGAN Working Group 5: Smart Grids International Research Facility Network (SIRFN) (Working period 2021 - 2024)

As a global network, SIRFN works to improve the understanding of smart grid technologies and to promote their development and dissemination worldwide. Austria's participation during the project period ensured the networking and visibility of the Austrian smart grid research infrastructure at a global level and provided important access to a worldwide network of leading institutions and laboratories.

Internationale Energieagentur (IEA)

IEA IETS Annex 17: Membrane processes in biorefineries (Working period 2020 - 2022)

The aim of IEA IETS Task 17 was to network and strengthen the Austrian membrane and biorefinery research landscape and to promote international exchange on energy- and cost-efficient separation technologies such as membrane distillation (MD), forward osmosis (FO), pervaporation (PV) and liquid membrane permeation (FMP) for the optimised use of lignocellulosic material in biorefineries. A guideline for the integration of emerging membrane processes was created for this purpose.

Nachhaltig Wirtschaften

Conference: Smart Grids Week - Salzburg 2013

13th to 17th of May 2013
Salzburg Congress and Salzburg AG5020 Salzburg, AT

The Smart Grids Week - Salzburg 2013 aims to significantly contribute to the further development of electricity infrastructures.

Internationale Energieagentur (IEA)

Conference: Challenges of Biomass Combustion

13. - 14. November 2013
Vattenfall Power Plant Klingenberg Köpenicker Chaussee 42 - 45, Berlin, DE

IEA-Task 32 supports the VGB Biomass Working Group in the organi­sation of the expert conference "Challenges in Biomass Combustion".The conference covers practical experiences and mitigations options for addressing the key operational challenges, varying from ash depositon to fire safety.

Internationale Energieagentur (IEA)

Energy Technology Perspectives 2016 - Webinar

3. June 2016
Online, AT

The webinar focuses on the role of urban energy systems in fostering national and global sustainable energy transitions, with a country focus on Mexico.

Internationale Energieagentur (IEA)

Technology Roadmap: Solar Heating and Cooling


Herausgeber: International Energy Agency
Englisch, 50 Seiten

Downloads zur Publikation

Internationale Energieagentur (IEA)

IEA SHC Task 42/ECES Annex 29: Compact Thermal Energy Storage - Material Development for System Integration

The key accomplishments of the task are summarized in the following points: New material characterizing methods were investigated, a new standard for an improved DSC measurement method has been developed, a data base for PCM, TCM and sorption materials was developed and established, advances in the numerical modelling of materials, compact thermal storage systems were developed for different material applications, a tool for the economic evaluation of thermal energy storages has been developed. Also numerous joint R&D Projects and more than twenty publications arose from the IEA-SHC Task 42 networking activity.

Internationale Energieagentur (IEA)

IEA DSM Task 17 - Extension: Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages (working period 2013 - 2016)

The aim was to exchange experiences and developments in the field of integrating renewables with the help of DSM in residential and commercial buildings. Technologies like PV systems, electric vehicles, electric storages, heat pumps, micro-CHP in combination with energy management systems (via gateways), and implementing dynamic tariffs using smart meters offer huge potential to increase energy efficiency. Phase 3 of this Task addressed the current role and potential of flexible buildings and their related implied changes and impacts on the grid and markets. The scalability and applicability of successful projects with respect to specific regional differences and requirements was also explored.