Suchergebnisse
Exploration of window systems with innovative glass - especially vacuum insulating glass - for building renovation
Exploration of the use of the first fabricable highly insulating vacuum glazing (VG) for highly efficient window systems specifically for the renovation of existing buildings via Verification of the availability and performance of Vacuum Glazing VG worldwide, concepts for structural optimization and thermal simulations of integrated systems, investigation of typical applications and market potential studies and identification of achievable energy savings for single buildings and settlements.
From courtyards to lightyards
The feasibility of daylight-optimized solutions for retrofitting courtyards by an intelligent alignment of different materials has been examined. With it, daylighting levels in lower floors can realistically be increased tenfold. Additionally, a calculation tool for generating and evaluating optimal courtyard solutions was designed. Besides daylighting parameters also economic criteria were considered.
E.Vent – Efficient, cost-effective and low-maintenance central ventilation systems for multi-family housing – Design, operation and fire protection measures
Die Synopsis ist eine drei- bis vierzeilige Beschreibung des Projektinhalts alsErgänzung zum Titel und nähere Erläuterung des Projekts.
BONSEI! Optimal use of existing buildings – energy efficient implementation of renovation!
The project BONSEI! would like to support an energy efficient and socially acceptable densification of privately owned residential buildings in urban space and to develop a methodological basis for resource efficient urban areas. The results are used for the conception of an innovative service in order to provide a neutral consulting regarding private densification plans.
THERM-opti-BALCONY: Thermal Optimized Renovation of Balconies
Pre-cast cantilever balconies represent a particular problem in the thermal renovation of buildings. The central goal of this project is the development of practical and cost-effective mounting solutions for the thermally decoupled reconstruction of balconies on building frontages and achieving a significant increase in the energy performance of the thermal renovation measure.
THERM-opti-BALCONY-P2 - Thermal Optimized Renovation of Balconies Phase 2: In-Situ-Pilot-Station
Pre-cast cantilever balconies represent a particular problem in the case of thermal rehabilitation of buildings. With the THERM-opti-BALKON-System a solution is currently being investigated under laboratory conditions. Phase 2 aims to create an in-situ-pilot-station. The most important object of study is the long-term behavior of the THERM-opti-BALKON-System.
SPIDER - Subtraction as a measure to Preserve and Insulate historic Developments by Electric Robots
The purpose of this exploration is to unlock the potential of autonomous, data-driven robots that achieve improvements of the thermal building performance through air entrapments in a continuous process.
VAMOS - Casement windows with vacuum glazing: Performance-Monitoring for Building retrofit
Knowledge consolidation of the exploratory project VIG_SYS_RENO; This project focused on the application of vacuum glass in existing casement windows for purposes of energetic performance improvement of buildings. Expected results include new insights about and a guideline for the application and utilization of vacuum glass products in existing window systems.
Innovation lab act4energy
The Innovation Lab act4energy is set up as an innovation laboratory project. Its focus is to solve the problems of renewable energies integration with a focus on photovoltaic power paired with local consumption, linked to the the high fluctuation of renewable energies.
"gugler! build & print triple zero" - subproject 6: Integration of the C2C production into the flagship project Gugler
Print and media production at the media and communications company gugler GmbH are currently being optimized according to Cradle to Cradle (C2C) criteria. The goal of this subproject is to allow the demands of a C2C production process optimized for exchange with biological cycles to be included into the general planning of the new production building of the company, a pilot project within the "building of tomorrow" program line.
Renovation with passive house technology by master-builder – verified planning documentation – Guide and seminars
The project aims at an increased implementation of passive house technology by the planning as well as the operating master-builder.
BIGMODERN - Subproject 2: Demonstration project of an official building in Bruck
In the frame of this subproject being part of the flagship project BIGMODERN, a decision matrix as well as a handbook for planning, including feasibility analysis and a collection of information, serving as decision guidance for planning and implementation of sustainable building refurbishment, is being developed. In this way, the risk for planners and builders of the usage of new sustainable technologies shall be minimised.
Ecological restoration of a listed building with passive house technologies
Ecological exemplary reconstruction of the "Haidenhof"-building, Bad Ischl, Upper Austria. Building refurbishment with respect to monumental protection and newest passive house technologies. Reorganisation of the former residential building to an academy of arts and culture.
Energy Plus House Weber - highest energy efficiency in the tension between tradition and modernity
The tension between tradition and modernity is shown and exemplarily solved on the example of the historic farmhouse "vulgo Weber". The object was converted into an energy plus house with an exceptionally holistic approach and also thought as a demonstration object for a broad public through the touristic use of the house.
High-quality refurbishment - Designing quality standards for the refurbishment of municipal buildings

Designing quality standards for ecological refurbishment (based on E. Panzhauser's proposals, 2001); applying them to characteristic types of buildings systematically selected in diverse municipalities; the achieved results shall serve as good practice examples for future refurbishment and as basis of discussion on subsidy regulations.
"gugler! build & print triple zero" - subproject 5: Ecoeffective building
On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building will be developed.
Innovative Refurbishment of Single Family Houses

Evaluation of best-practice models and recommendations to support dissemination
Architecturally Diverse, Energetic Renewal

Post War Modernist Buildings Under Monument Protection. A Comparative Analysis of Energy Efficient Renewal Case study: Open Air School Franklinstrasse, Wien 21
Cooperative Refurbishment

Models for participation of owners and tenants in ecological refurbishment of multi floor buildings
Urban consolidation Lehen
The key project "Stadtumbau Lehen" ("urban consolidation Lehen") coordinates several projects at the urban district of Lehen, with the purpose of the raise in energy efficiency and safekeeping of a sustainable development. Four builder (ten teams of architects), two scientifically institutions, the town of Salzburg and two attended departments of the land are working together.