Suchergebnisse
BIGMODERN - Subproject 10: Evaluation, Documentation and Ensuring Transferability
The subproject 10 is part of the flagship project BIGMODERN. It is based on the results of subproject SP 7 in which a monitoring concept has been developed. This concept is now implemented through monitoring of different aspects occurring during the first two years of operation of both BIGMODERN demonstration buildings.
Measures for Minimisation of Rebound-Effects Concerning Residential Building Renovation (MARESI)
Development of a pragmatic assessment scheme applicable to building practice for the impact of building products on human health
Inhabitants-friendly passive house renovation in Klosterneuburg / Kierling
Renovation of an apartment house from the 1970s as passive house using renewable energy.
The Passive House Catalogue of Building details for renovations
"Building of Tomorrow" funded research reports dealing with building renovation will be analysed for solutions of construction details. This information will be supplemented with structural-physical descriptions, ecological ratings and technical discussions. All the information will be collected and systematically presented in a catalogue of building details for renovation.
SchulRen+ Innovative plus-energy refurbishment concepts for school buildings
In a technical feasibility study and based on a real example, the project analysed innovative plus-energy refurbishment concepts for school buildings. The goal was to develop refurbishment concepts with a high replication potential which combine future-oriented energy concepts with feasible technical and architectural solutions.
Ecological restoration of a listed building with passive house technologies
Ecological exemplary reconstruction of the "Haidenhof"-building, Bad Ischl, Upper Austria. Building refurbishment with respect to monumental protection and newest passive house technologies. Reorganisation of the former residential building to an academy of arts and culture.
Plus energy office building - Subproject 3: Austria's biggest plus energy office building
In course of the refurbishment of the Vienna University of Technology (Univercity 2015) Austria´s biggest plus energy office building is going to be built. This project intends to demonstrate not only the technical but furthermore the economical feasibility of plus energy office buildings. Within this building the plus energy concept is fulfilled by optimizing the power consumption of the whole building and the installation of Austria´s largest facade integrated photovoltaic plant.
Construction Site SCHOOL - Sustainable Models for the Refurbishment of School Buildings?
In this research project, models for refurbishment and restructuring of school buildings were developed. The reconstruction concepts contain lists of measures for deploying sustainable building techniques and exemplary case studies for the reorganisation of buildings of different typologies.
Oekosan'11 - International symposium for high-quality retrofit of large-volume buildings to plus-energy-buildings
The AEE INTEC organized the international congress "ökosan'11 - high-quality retrofit of large-volume buildings to plus-energy-buildings" in September 2011. The position of Austrian companies in international cooperation was strengthened through personal contacts during the conference.
Energy efficient, resource conserving and differentiated renovation of historic European building stocks (ReCoRe)
The project goal was the development of an integrated, long term and life cycle oriented approach to sustainable modernisation of historical building stocks. Within this project the partners used common objectives and planning tools and followed a common procedure in order to develop a specific national application which results from a historical, technical, social and cultural understanding of the specific national stock fragments.
Climate neutral buildings from the period of promoterism - ways, potentials and possibilities of implementation
The focus was on the goal-oriented and economic options, in order to achieve a CO2-neutral energy supply and hermetically sealed building envelope as well as to show high energy efficiency when using. On the other hand building protection regulations and the quality in use are to be considered.
Urban consolidation Lehen - Subproject 8a: project management - documentation - dissemination and quality assurance
The project coordinates several projects in the urban quarter Lehen to ensure increase of energy efficiency and sustainable development. This subproject contains the coordination of the partners and projects in order to reach defined standards of quality, coordination and cooperation with the program "Building of Tomorrow" and other flagship projects as well as the documentation of results.
Renovation with passive house technology by master-builder – verified planning documentation – Guide and seminars
The project aims at an increased implementation of passive house technology by the planning as well as the operating master-builder.
"gugler! build & print triple zero" - subproject 6: Integration of the C2C production into the flagship project Gugler
Print and media production at the media and communications company gugler GmbH are currently being optimized according to Cradle to Cradle (C2C) criteria. The goal of this subproject is to allow the demands of a C2C production process optimized for exchange with biological cycles to be included into the general planning of the new production building of the company, a pilot project within the "building of tomorrow" program line.
First energy autonomous revitalization of an urban former industry quarter with the standard type of "Passive House" to reduce primary energy max. 100 kWh/m2 NFL
A renovation with the energy efficient factor 10+ of a former industry quarter in the standard type of passive house with usage of the most modern technologies and locally renewable energy resources.
Gründerzeit with future - demonstration project 2: ROOFJET Wißgrillgasse - sustainable solution for improving the thermal-energetic performance of a typical historical building in Vienna
The main aim of the project ROOFJET Wißgrillgasse is a building refurbishment by a factor of 8 which demonstrates that even historical buildings can be refurbished to lowest energy standard.This demonstration project shows a holistic and sustainable refurbishment concept for a special type of buildings with innovative technical and organizational solutions.
e80^3-Buildings - "reconstruction concepts towards energy plus house standard with prefabricated active roof and facade elements, integrated home automation and network integration"
The project aims for highly-efficient renovation of existing buildings and settlements in urban areas. The main focus are buildings that were built between 1950 and 1980.
Integration of results of the program "Building of Tomorrow" into the established qualification program of energy counsellors and their daily consultancy activities
Preparing the results of the "Building of Tomorrow" program for energy counsellors by elaborating a material collection and integrating it into the basic education of energy counsellors. Furthermore a one-day training course for already active energy counsellors will be designed and held.
SQUARE - A System for Quality Assurance when Retrofitting Existing Buildings to Energy Efficient Buildings
The project aims to promote a flexible quality assurance management for the retrofitting process. It leads to high quality renovations of residential multifamily buildings regarding energy improvement and improvement of indoor environment.
"gugler! build & print triple zero" - subproject 9: Monitoring Gugler - Monitoring, evaluation, optimization GUGLER
The project objective is the measurement of relevant building values (energy consumption, ...), the evaluation of these values compared with the intended objectives and the optimization of the system based on the measured data. As a special innovation, monitoring the storage of alternatively generated electricity using photovoltaic and wind energy in the form of compressed air must be considered.