Suchergebnisse

Haus der Zukunft

Serial refurbishment for buildings in timber construction

Refurbishment of single- and two-familiy houses in timber construction in Austria has a large CO2-saving potential. To meet the special requirements for the refurbishment of timber constructions, a concept for the renovation to passive house respectively plus-energy house standard with special focus on ecologic construction materials was developed in this project.

Haus der Zukunft

e-retrofit kit - tool kit for passive house retrofit

Development of an internet-based tool for passive house retrofit für - target group social housing companies. Actualization of tool after test and evaluation in case-studies. dissemination activities in austria.

Haus der Zukunft

COOLSAN - refrigeration concepts for office and administrative buildings retrofit

Technologies to enhance comfort and minimise energy requirements for air conditioning in existing office and administrative buildings. Possibilities to reduce the cooling loads and strategies for the use of passive cooling systems.

Haus der Zukunft

BIGMODERN - Subproject 8: Demonstration building Amtshaus Bruck - Realisation

In the frame of the flagship project BIGMODERN the "Amtshaus Bruck an der Mur" had been renovated according to above-average quality standards concerning energy efficiency and sustainability while complying with an industrial management point of view.

Haus der Zukunft

Evaluation of temperature differentiation on a room-by-room basis in passive house apartments

In the passive house Utendorfgasse a room–by-room temperature control was installed in 11 apartments. The experiences were evaluated from a technological and from a sociological point of view.

Haus der Zukunft

Science documentary "Building of Tomorrow" for television

The documentary film for ORF/ 3sat and Bayern alpha-TV presents the concept of the passive house. Fascinating pioneer projects of the Austrian Program on Technologies for Sustainable Development, Sub-Program "Building of Tomorrow", have been filmed over several months. The importance of taking care of ecology and sustainability when constructing houses is demonstrated to a large audience.

Haus der Zukunft

Urban consolidation Lehen - Subproject 8a: project management - documentation - dissemination and quality assurance

The project coordinates several projects in the urban quarter Lehen to ensure increase of energy efficiency and sustainable development. This subproject contains the coordination of the partners and projects in order to reach defined standards of quality, coordination and cooperation with the program "Building of Tomorrow" and other flagship projects as well as the documentation of results.

Haus der Zukunft

School vent cool - Ventilation, cooling and strategies for high performance school renovations

Based on a building typology, strategies for prefabrication for high-quality thermic-energetic renovation of school buildings were developed. New solutions for ventilation systems to achieve good air quality and shading systems were analysed and tested. The "School vent cool" method for renovation of schools has been developed.

Haus der Zukunft

Gründerzeit with future - subproject 6: dissemination

Dissemination aimed at defining the relevant target groups and broadly distributing the innovative solutions of the flagship project GdZ to the defined target groups. It is of crucial importance to effect a wide awareness level and to make a deep impact on the relevant target groups.

Haus der Zukunft

Reconstruction of residential buildings "Tschechenring": ecologically reconstruction of monumental-protected residential buildings for workers (1880) in Felixdorf

Planning and realisation of a demonstration project for the exemplary reconstruction of monumental-protected residential buildings of the late 19th century or comparable housing estates of the 30s under consideration of energetic optimization, renewable energy sources and regenerating raw materials.

Haus der Zukunft

BIGMODERN - Subproject 6: Incentives to enforce energy efficiency and sustainability in moderniza­tions of BIG-buildings

Development of approaches, which lead to general conditions for complete refurbishments in BIG-buildings, which support high standards regarding energy efficiency and sustainability. This will ensure high-quality modernizations for BIG's real estate.

Haus der Zukunft

e80^3-Buildings - "reconstruction concepts towards energy plus house standard with prefabricated active roof and facade elements, integrated home automation and network integration"

The project aims for highly-efficient renovation of existing buildings and settlements in urban areas. The main focus are buildings that were built between 1950 and 1980.

Fabrik der Zukunft

Development of high quality ecological solutions for thermal insulation systems on the basis of reed

Exterior and interior insulation systems containing reed as insulation material were developed. The solutions integrate insulation material, fastening and plaster (as well as optional heating for the interior insulation). A concept for the renovation of an old building using a reed insulation system was developed.

Stadt der Zukunft

REGOreal - 100% Renewable Energy Region: Local Energy Common Good Economy in real laboratories for networked energy and mobility cells

In REGOreal, the exploration for a 100% renewable energy region in the area of Retz-Horn-Krems-Tulln (Lower Austria) and Mallnitz (Ktn) is taking place. There are four focus topics: 100 Renewable Energy Communities (REC), 1.000 building renovations, 10.000 energy exporters (in the sense of employees who carry the approach into their private environment) and 100 Mio. km of sustainable mobility with extensive use of IT for the development of local integrated energy systems (IES) to integrate a colorful mix of different actors and objects.

Stadt der Zukunft

Exploration of window systems with innovative glass - especially vacuum insulating glass - for building renovation

Exploration of the use of the first fabricable highly insulating vacuum glazing (VG) for highly efficient window systems specifically for the renovation of existing buildings via Verification of the availability and performance of Vacuum Glazing VG worldwide, concepts for structural optimization and thermal simulations of integrated systems, investigation of typical applications and market potential studies and identification of achievable energy savings for single buildings and settlements.

Haus der Zukunft

From courtyards to lightyards

The feasibility of daylight-optimized solutions for retrofitting courtyards by an intelligent alignment of different materials has been examined. With it, daylighting levels in lower floors can realistically be increased tenfold. Additionally, a calculation tool for generating and evaluating optimal courtyard solutions was designed. Besides daylighting parameters also economic criteria were considered.

Stadt der Zukunft

E.Vent – Efficient, cost-effective and low-maintenance central ventilation systems for multi-family housing – Design, operation and fire protection measures

Die Synopsis ist eine drei- bis vierzeilige Beschreibung des Projektinhalts alsErgänzung zum Titel und nähere Erläuterung des Projekts.

Stadt der Zukunft

BONSEI! Optimal use of existing buildings – energy efficient implementation of renovation!

The project BONSEI! would like to support an energy efficient and socially acceptable densification of privately owned residential buildings in urban space and to develop a methodological basis for resource efficient urban areas. The results are used for the conception of an innovative service in order to provide a neutral consulting regarding private densification plans.

Haus der Zukunft

THERM-opti-BALCONY: Thermal Optimized Renovation of Balconies

Pre-cast cantilever balconies represent a particular problem in the thermal renovation of buildings. The central goal of this project is the development of practical and cost-effective mounting solutions for the thermally decoupled reconstruction of balconies on building frontages and achieving a significant increase in the energy performance of the thermal renovation measure.

Haus der Zukunft

THERM-opti-BALCONY-P2 - Thermal Optimized Renovation of Balconies Phase 2: In-Situ-Pilot-Station

Pre-cast cantilever balconies represent a particular problem in the case of thermal rehabilitation of buildings. With the THERM-opti-BALKON-System a solution is currently being investigated under laboratory conditions. Phase 2 aims to create an in-situ-pilot-station. The most important object of study is the long-term behavior of the THERM-opti-BALKON-System.