Suchergebnisse

Haus der Zukunft

BIGMODERN Subproject 7: Monitoring concept

Development of a pattern for comprehensive documentation of the project results. The concepts contain amongst others monitoring of energy consumption, resources, costs, functionality and comfort, etc.

Haus der Zukunft

Sanierung PRO!

The goal of the project is the development of a guideline, which supports builders and planners or consultants in the organization and monitoring of inhabitant integration into the reorganization processes of multi-storey housing.

Haus der Zukunft

ECR Energy City Graz-Reininghaus: Urban strategies for the new conception, construction, operation and restructuring of an energy self-sufficient city district

The aim is the development of a valid set of specific values and a guideline as a basis for energy self-sufficient district development. Based on the results, a masterplan (energy-network) for the district Graz-Reininghaus shall be developed. Future-oriented "city-building-blocks" will be implemented as flagships of innovation.

Haus der Zukunft

Integrated ecological and energy-oriented refurbishment of service buildings - development of quality criteria and tools within a pilot project (LCC-ECO)

Formulation of a procedure for the general refurbishment of service buildings and development of guidelines to support building owners and facility-managers in each stage of the refurbishment process in order to reach an integrated ecological and energy-oriented refurbishment.

Haus der Zukunft

Renew Building - Competence Building and Knowledge Transfer for Climate-friendly renovation with ecological and renewable materials

The project Renew Building provided knowledge about eco-friendly renovation to the target groups (planners, architects, students of architecture, etc.) through theory and practice classes, lectures, an e-learning platform, and in an online knowledge database.

Haus der Zukunft

WOP - Restoration of residential buildings in passive house quality, Linz, Austria

Pilot scheme for the restoration of the multi-storey residential buildings to a low energy building while people keep living in their flats with energy efficient, ecological and economical criteria.

Haus der Zukunft

Certified passive attic conversion of a typical building from the period around 1900

Conversion of an attic of a typical building from the period about 1900 to a passive attic with photovoltaic system and renovation of the existing building equipment. The aim is to keep the additional construction costs under 10 %, to avoid overheating in summer and to make possible a reproduction for the large amount of buildings from the same period.

Haus der Zukunft

Climate neutral buildings from the period of promoterism - ways, potentials and possibilities of implementation

The focus was on the goal-oriented and economic options, in order to achieve a CO2-neutral energy supply and hermetically sealed building envelope as well as to show high energy efficiency when using. On the other hand building protection regulations and the quality in use are to be considered.

Nachhaltig Wirtschaften

REVITALISING with S.A.M. - Synergy Activation Modules

Case study for the development of modules that allow for the revitalisation of existing structures without interruption of utilization (two studies, one realisation).

Haus der Zukunft

plusFacades - International know-how- and knowledge transfer of "intelligent Facade systems" for Austrian players and key personnel

The project proceeds from the idea that prefabricated intelligent facade systems represent a promising technology for the energy efficient refurbishment of buildings. A goal is to process the present international state-of-the-art and the existing know-how to this topic for Austrian experts.

Haus der Zukunft

PHOTOVOLTAIC WATER Solution

Passive House refurbishment facade with integrated photovoltaic modules for direct, current-based warm water preheating. The GIWOG, an energy-conscious and environmentally and socially oriented client, intends to undertake an energy-related modernisation project, which will further optimise energy consumption to be more efficient at an apartment complex in Graz, main street 302-306. The goal is to lower the energy consumption for heating and hot water from the current level of approximately 135 kWh /m²a to approximately 8 kWh /m²a. The planned measures should correspond with an overall energy consumption reduction of approx. 94 %.

Haus der Zukunft

WHISCERS. Whole House In-Situ Carbon & Emission Reduction Solution

Whiscers is a system for installing internal wall insulation with minimal mess, whilst the resident remains in the property. It involves measuring the walls in the property using a laser device that enables fast and highly accurate measurement. Information is then sent electronically to a computer controlled off-site cutting machine that is rapid, precise and mess-free.

Haus der Zukunft

Ways and means to increase the construction-volume by 500%, by means of standardised thermal restoration of old houses.

Development of practise-fit methods for intensification and rationalisation of processes in the field of restoration of one-and two-family houses built between 1945 and 1982 in Austria.

Haus der Zukunft

Mechanical ventilation system for windows for the renovation of old buildings

Analysis and implementation of alternative ventilation systems for windows, focusing on thermal renovation of old buildings. The investigated ventilation systems were presented to an expert group. The aim was to discuss ventilation technologies with the help of different aspects and to develop a SWOT analysis.

Haus der Zukunft

e80^3-Buildings - Sub project 4: Demonstration object

Alongside the realisation of the plus energy building in Kapfenberg, a demonstration project is scheduled to be created that accomplishes an economically viable and technically innovative solution for the future.

Haus der Zukunft

e80^3-Buildings - Sub project 1: Basics

Goal of this subproject was to select the building with the highest potential within a building-portfolio. Therefore a criteria catalogue was developed, which is generally applicable.

Haus der Zukunft

Catalogue of Passivhouse Details for Refurbishments

A Catalogue of Passivhouse Details for Refurbishments for buildings of all building periods from the 1870 to the 1980s. Special consideration to the refurbishment of building parts in contact with the earth. Integration of controlled ventilation services. Construction elements description with drawings, building physical data and ecological life cycle assessment. This project aimed at contributing to "Replicable refurbishment concepts for meeting passive house (or comparable) standard in buildings of all building periods".

Haus der Zukunft

Gründerzeit with future - demonstration project 1: David´s Corner

High value energy efficient refurbishment of an ensemble of three neighbouring Wilhelminian style buildings in a non-lucrative location.

Haus der Zukunft

Building of Tomorrow for the construction industry

Dissemination of results of the research initiative "Building of tomorrow" for two specific target groups - master builder and installer - implementation in further vocational training concepts

Haus der Zukunft

Serial refurbishment for buildings in timber construction

Refurbishment of single- and two-familiy houses in timber construction in Austria has a large CO2-saving potential. To meet the special requirements for the refurbishment of timber constructions, a concept for the renovation to passive house respectively plus-energy house standard with special focus on ecologic construction materials was developed in this project.