Suchergebnisse
IEA ES Annex 50: Prefab Systems for Low Energy/High Comfort Building Renewal
Development of integrated concepts for multi-storey buildings, which enable renovations of buildings with high energy efficiency at good user acceptance during the realisation phase as well as afterwards (comfort, affordability). Relevant components: integrated solutions of roof and façade with high rate of pre-fabrication, the possibility of integrating the energy façade/roofs and energy distribution and supply.
Pilot project gaining-building-land Pongau
Gaining extra space for additional households through sustainable renovation and/or extension of 8 detached houses by integrating consulting, planning, energy efficiency concepts and financing.
Gründerzeit with future - sub project 2: Foundations and feasibility studies
Documentation of available knowledge on the renovation of historical buildings ("Gründerzeitgebäude") as an input for the preparation of 5 demonstration projects as well as the development of an accompanying monitoring system within the scope of the project "Gründerzeit with future".
NEST international - New standards for old houses international
The main goal was to raise awareness for energetic renovations of settlement houses due to the handbook "Neue Standards für alte Häuser" in Slovakia and the Czech Republic. In doing so, the refurbishment potential has been identified in the target countries, experiences exchanged and information transferred. Contacts to the relevant target groups have been established.
BIGMODERN - Sustainable refurbishment standards of federal buildings constructed between 1950 and 1980
The project aims at developing sustainability and climate protection criteria for the refurbishment of federal buildings of the postwar period. These criteria will be tested for their practical suitability within the framework of demonstration projects. Subsequently, these criteria will be defined as fundamental guiding principles in the planning and building processes for all future BIG retrofit projects.
Oekosan'11 - International symposium for high-quality retrofit of large-volume buildings to plus-energy-buildings
The AEE INTEC organized the international congress "ökosan'11 - high-quality retrofit of large-volume buildings to plus-energy-buildings" in September 2011. The position of Austrian companies in international cooperation was strengthened through personal contacts during the conference.
"1000 Passivehouses in Austria" - Passive house object databank

The first joint project of the four IG passive house organisations on behalf of the programme line "Building of Tomorrow" - an initiative of the Federal Ministry for Transport, Innovation and Technology - for the purpose of setting up a detailed network documentation of 80% of all passive houses in Austria.
New standards for old houses - concrete
The campaign is, orientated on the target group, a linked extension of the reconstruction guidance "Neue Standards für alte Häuser" ("New standards for old houses") on the building trade and subconstruction work as well as on the awarding authority.
Solarenergie Urban - Analysis and evaluation of the economic, energetic and architectural quality of urban solar energy buildings
This project developed energetic and economic optimised planning criteria for multi storey residential buildings for the integration of renewable energy systems in the building shell. The field of new construction and refurbishment had been investigated.
The very first reconstruction in Austria of a one-unit house to passive house standard (Model project in Pettenbach/Upper Austria)

The main objective is the unprecedented reconstruction of older one-unit buildings to the standards of passive houses. The reconstruction estates are of the numerous older one-unit houses in Austria. The reconstruction will considerably enhance the convenience of living quarters in the old houses.
First rehabilitation project of a public building to reach passive-house standard

General rehabilitation of the General Secondary School II and the Poytechnic School at Schwanenstadt (Upper Austria) using prefabricated timber wall elements and a newly developed ventilation system optimised for schools
e80^3-Buildings - Sub project 5: Monitoring and dissemination
The content of subproject 5 was the analysis of energy- as well as building-biology-related issues for the evaluation and quality management of the demo-project in Kapfenberg, which involves a high-quality refurbishment to a plus energy house within the program "Haus der Zukunft - Building of Tomorrow". Within this process the user acceptance before, during and after the renovation was elevated and this will be processed for upcoming projects. The environmental quality of the building regarding the choice of materials and measures during the construction phase and the subsequent use of the building was assessed with the help of the TQB-planning and evaluation tool.
Energetic roof including window, PV and thermal solar components as on-roof and façade module - on-roof and façade module
Development of a novel on-roof respectively façade module, which includes a thermal solar component as well as photovoltaics and a skylight. With the serial implementation of this development idea there should be offered for the first time an energetic roof as retrofitting kit for existing buildings.
BIGMODERN - Subproject 10: Evaluation, Documentation and Ensuring Transferability
The subproject 10 is part of the flagship project BIGMODERN. It is based on the results of subproject SP 7 in which a monitoring concept has been developed. This concept is now implemented through monitoring of different aspects occurring during the first two years of operation of both BIGMODERN demonstration buildings.
Service packages for the ecological renovation of buildings

Services for a comprehensive ecological renovation should comprise advice, design and construction as well as "green" building assessment and innovative financing models. Such services are developed together with companies in the construction business and tested in pilot projects.
First remediation of already existing homes to passive house standard with Vacuum insulated panels (VIPs)
Demonstration of the way to redevelop a home of the 19th century to passive house standard in consideration of moisture process and the use of vacuum insulation.
GAINING BUILDING LAND without expansion - development of single-family housing settlements

Identifying and utilising potentials for higher densities and re-structuring in single-family housing areas requiring renewal
Demonstration project senior-housing concepts for new construction and renewal in Vienna, Menzelgasse

Acompagning the process of realisation and settlement of two projects of senior-housing (new construction and renewal), documentation and general assumptions.
BIGMODERN - Subproject 5: Feasibility studies about innovative technical solutions
The application of innovative technologies means additional planning and coordination effort which usually cannot be incorporated into the conventional planning processes of the BIG. To overcome these barriers for the application of innovative technologies, the sub project at hand aims at preparing information, feasibility studies, planning records, experiences and practical examples in a way, that they can be implemented directly into the planning process.
Energetic building refurbishment in protection zones

Standardized solutions as a help and guideline for building-owners, authorities and companies