Suchergebnisse
Operational and maintenance costs in passive houses and low energy houses
How much energy does a passive house actually save? Does a passive house pay-off by itself? What are the costs for maintancence? For the first time an approximation for the running costs of a passive house were systematically documented and compared.
aspern Vienna´s Urban Lakeside subproject 2: Inter-building energy distribution
Development of comprehensive concepts for local distribution systems for thermal and electric energy within a residential area including the consideration of the interaction with construction and city planning. Derivation of measures for demonstration buildings and the infrastructure of the residential area. Integration of computing models to a prototype simulating energy distribution in the residential area.
aspern Die Seestadt Wiens - Subprojekt 2: Gebäudeübergreifende Energie
Entwicklung umfassender Konzepte für lokale siedlungsbezogene Energieverteilsysteme thermischer und elektrischer Energie sowie deren Wechselwirkung mit der Bauausführung und der Raumplanung. Ableitung von Maßnahmen für Demogebäude und Siedlungsinfrastruktur. Integration zu einem wird ein Prototyp einer Sieldungssimulation.
ECR Energy City Graz - subproject 3: +ERS - Plus Energy Network Reininghaus Süd
The multifunctional neighbourhood "+ERS - Plus Energy Network Reininghaus Süd" was realized within the urban planning area of Graz-Reininghaus. The project aims to optimize the energy concept of the single buildings as well as of the building cluster in order to achieve a plus-energy standard within the residential neighbourhood.
Sol2Pump - High efficient combination of solar thermal plants, photovoltaic and heat pumps
Targeting a high level of decentralised energy supply on basis of renewable energy, the project analysed the possible combinations of solar thermal energy, photovoltaic and heat pumps. The project aimed to maximise the domestic energy supply due to utilisation of the building as short term energy storage. In addition to that, several optimisation measures had been developed. The impact on the energy supply and demand will be economically assessed through life cycle costing. On this basis, the potential load transfer and the use of this kind of systems had been evaluated in combination with smart grids.
aspern Vienna´s Urban Lakeside - subproject 6b: Monitoring of Energy Consumption in Demonstration Buildings in Seestadt Aspern
The project deals wtih the energy consumption monitoring of demonstration buildings, which are erected within the framework of the landmark project "aspern+". As both, office/manufacturing as well as residential buildings will be constructed, these different user groups will have to be considered. The derivation of the concepts will be done in accordance of the specific needs of the individual demonstration buildings.
OPEN LIVING PLUS - building structures and utilization options with high social functionality and plusEnergie-standard for rural regions
In small to medium sized communities in rural Regions there is a high demand for sustainable building and space for innovative living facilities, to satisfy the requirements of current and coming life designs. The project’s intentions were to provide social scientific groundwork, develop building structures and utilization options of high social functionality and to transfer knowledge to decision makers in communities and regional authorities.
Beacon of innovation gugler cross media, ecoeffective zero energy cross media enterprise featuring zero-emission, zero energy, zero waste
The aim of the flagship project is a new dimension of sustainability (cradle to cradle, ecoeffective zero energy enterprise) for business operation and building, which means zero emission, zero energy, zero waste. This will be shown on the basis of a beacon of innovation: Gugler GmbH, a modern sustainable media services enterprise (traditional print and new media) will extend their current building from about 2100 square meters and about 90 employees to about 5,000 square meters.
Innovationsleuchtturm gugler cross media, ökoeffektive Plusenergiedruckerei in Gebäude und Produktion, zero emission, zero energy, zero waste
Ziel des Leitprojektes ist eine neue Dimension der Nachhaltigkeit: cradle to cradle für Betrieb und Gebäude, das bedeutet zero emission, zero energy, zero waste. Dies soll anhand des Leuchtturmprojektes Gugler GmbH, eines modernen nachhaltigen Mediendienstleistungsbetriebes (klassische Druckerei und neue Medien, der von derzeit ca. 2100 m² und ca. 90 Mitarbeitern auf ca. 5000 m² erweitert werden soll) gezeigt werden.
ECR Energy City Graz - Reininghaus: Urbane Strategien für die Neukonzeption, den Bau, Betrieb und die Umstrukturierung des energieautarken Stadtteils
Ziel ist die Erarbeitung von allgemein gültigen Kennwerten und eines Leitfadens als Grundlage für energieautarke Stadtteilentwicklungen. Aufbauend auf den Ergebnissen soll ein Gesamtenergiekonzept (Energienetzwerk) für den energieautarken Stadtteil Graz-Reininghaus erstellt werden. Durch den Bau von Demonstrationsprojekten sollen international zukunftsweisende "nachhaltige Stadtbausteine", als sichtbare Leuchttürme der Innovation umgesetzt werden.
Demonstration building of the eco²building system: First passive house prefabricated wood building system for commercial and industrial buildings
The EU funded "eco2building" construction system in a timber-frame based modular design represents a systematic approach for energy efficient commercial and industrial buildings. The object of the eco²building demonstration project - the logistics centre in passive-house quality for "Eine Welt Handel AG" - in Niklasdorf was to optimize the planning and construction processes and prepare for the market launch of the eco²building construction system. Accompanying research monitored and disseminated the experience.
SUBURBAHN – test- and demonstration-area for urban development and mobility around public transport stations in the central area of Upper Austria
Targeted, process-oriented conception for the implementation and operation of a test- and demonstration-area for urban development and mobility in Ansfelden involving relevant scientific stakeholders, local and regional stakeholders, decision-makers as well as the interested public according to the living lab approach.
SIMULTAN - Simultane Planungsumgebung für Gebäudecluster in resilienten, ressourcen- und höchst energieeffizienten Stadtteilen
Es soll die Möglichkeit zur Steigerung der Effizienz gebäudeübergreifender Energiesysteme geschaffen werden um dem Ziel resilienter Städte und Stadtteile mit hoher Lebensqualität, Ressourcen- und Energieeffizienz nahe zu kommen. Ziel war ein auf simultaner technischer Planung basierendes praxistaugliches Werkzeug zur Entscheidungsunterstützung bei Sanierungs- und Neubauplanungen (bis zu Plusenergiegebäuden) in hocheffizienten Stadtteilen.
Solarenergie Urban - Analyse und Bewertung der ökonomischen, energetischen und architektonischen Qualität urbaner Solarenergiebauten
Dieses Projekt entwickelte energetisch und ökonomisch optimierte Planungsgrundlagen für den mehrgeschoßigen Wohnbau zur Integration von erneuerbaren Energiesystemen in die Gebäudehülle. Es wurden die Bereiche Neubau und Sanierung bearbeitet.
SIMULTAN - Simultaneous planning environment for buildings in resilient, highly energy efficient and resource-efficient districts
This project enabled the opportunity for an essential energy efficiency increase within overlapping buildings, to achieve the objective of resilient cities and districts with respect to a high quality of life, resource sustainability and energy efficiency. The goal was a workable tool based on a multidisciplinary planning approach, to support the decision finding process in order to design both refurbishment projects and new developments within a highly efficient city.
aspern Vienna´s Urban Lakeside - subproject 5: Monitoring of Energy Consumption in Demonstration Buildings in Seestadt Aspern
Goal of the project is to develop a monitoring tool that allows to predict the expectable (final) quality of the residential buildings based on decisions made during the planning and construction phase. For this purpose, the current certification tool for the determination of "TQB-points" will be equipped with "interim" certifications, which shall allow the land developer to carry out a quality monitoring parallel to the construction phase. The tool will be tested with the data obtained from selected construction projects during the first residential development phase in seestadt aspern.
SUBURBAHN - Test- und Demonstrationsgebiet für Stadtentwicklung und Mobilität im Umfeld von Haltestellen im oö. Zentralraum
Zielgerichtete, prozessorientierte Konzeption für die Umsetzung und den Betrieb eines Test- und Demonstrationsgebiets für Stadtentwicklung und Mobilität in Ansfelden unter Einbindung relevanter Forschungsakteurinnen und -akteure, lokaler und regionaler Stakeholder, EntscheidungsträgerInnen sowie der interessierten Bevölkerung im Sinne eines „Living Lab“-Ansatzes.
EKZ - EnergieKompetenzZentrum Großschönau: "Sonnenplatz - 1. European passive house village for test-living" phase of realisation

Integrative approach for the diffusion of the ecologic passive house: village of passive houses for test-living with an Energy Competence Centre on the basis of a sustainable concept for settlement development at Großschönau.
ECR Energy City Graz-Reininghaus: Urban strategies for the new conception, construction, operation and restructuring of an energy self-sufficient city district
The aim is the development of a valid set of specific values and a guideline as a basis for energy self-sufficient district development. Based on the results, a masterplan (energy-network) for the district Graz-Reininghaus shall be developed. Future-oriented "city-building-blocks" will be implemented as flagships of innovation.
Demonstrationsgebäude des eco²building-Systems: erstes Passivhaus-Holzfertigteilbausystem für Gewerbe- und Industriebau
Das EU-geförderte eco2building-Bausystem in Holzrahmen-basierter Modulbauweise ist der erste systematische Ansatz für energiesparendes Bauen im Sektor kommerzieller Gebäude. Mit der Errichtung des eco²building Demonstrationsobjekts - eines Logistik-Zentrums in Passivhaus-Qualität für die Eine Welt Handel AG - in Niklasdorf wurden die Planungs- und Produktions-Abläufe optimiert und die Markteinführung des eco²building Bausystems vorbereitet. Eine Begleitforschung erfasste die Erfahrungen und verbreitet sie.