Suchergebnisse für "Factsheet: Energietechnologien gestalten, die für alle sinnvoll und nutzbar sind"

Stadt der Zukunft

E.Vent – Efficient, cost-effective and low-maintenance central ventilation systems for multi-family housing – Design, operation and fire protection measures

Die Synopsis ist eine drei- bis vierzeilige Beschreibung des Projektinhalts alsErgänzung zum Titel und nähere Erläuterung des Projekts.

Haus der Zukunft

Passive house Kindergarten with an integrated therapeutical group

Applied passive house techniques with locally available materials for a public building using limited funds.

Haus der Zukunft

PEB - Plus-Energy-Office

An integrated technical energy plus office concept without additional building costs demonstrates the feasibility of such projects instancing a concrete office project with 50.000 m² floor area in Vienna with economical cost consideration.

Haus der Zukunft

Comparative analysis and evaluation of innovative building concept models in terms of key ecological and economic figures during life cycle of individual building concepts

The aim of this research project was to subject a number of building concept models to a comprehensive comparative analysis and evaluation in terms of key ecological and economic figures.

Haus der Zukunft

Effective Comfort in a Climatic comfort house

Sophisticated implementation of different passive house-building services systems on a basis of four similar parts of a structure of multi-storey dwelling houses.

Haus der Zukunft

Urban consolidation Lehen - Subproject 8a: project management - documentation - dissemination and quality assurance

The project coordinates several projects in the urban quarter Lehen to ensure increase of energy efficiency and sustainable development. This subproject contains the coordination of the partners and projects in order to reach defined standards of quality, coordination and cooperation with the program "Building of Tomorrow" and other flagship projects as well as the documentation of results.

Stadt der Zukunft

6D BIM-Terminal: Missing Link for the development of CO2 neutral buildings

The present project aims to close the gap between specialist consultants and Building Information Modeling (BIM) applications. For that, relevant data for cost estimation, scheduling construction planning and management or sustainable building operation and facility management, shall be added automatically to BIM elements and imported into the respective specialist planning software. This data exchange shall be carried out using IFC interface according to ÖNORM A6241-2 and the properties of the ASI properties server via a central platform, the "6D BIM-Terminal".

Haus der Zukunft

Beacon of innovation gugler cross media, ecoeffective zero energy cross media enterprise featuring zero-emission, zero energy, zero waste

The aim of the flagship project is a new dimension of sustainability (cradle to cradle, ecoeffective zero energy enterprise) for business operation and building, which means zero emission, zero energy, zero waste. This will be shown on the basis of a beacon of innovation: Gugler GmbH, a modern sustainable media services enterprise (traditional print and new media) will extend their current building from about 2100 square meters and about 90 employees to about 5,000 square meters.

Haus der Zukunft

"gugler! build & print triple zero" - subproject 4: energy concept Gugler

The energy concept led Gugler in frame of the conversion and expansion of the company towards plus-energy standard. Significant measures ware a consequent maximum reduction of the energy demand, optimal utilisation of industrial waste-heat, maximum consumption of on-site energy sources, integrated energy production, ecologic load manage­ment with comprehensive response- and storage-techniques.

Haus der Zukunft

Modular and standardised passive houses in solid timber construction

Concerning to an accurate and adaptable construction of 2 to 4 storey solid timber houses with the characteristics of a passive house, a digital construction and dimension system will be developed. The system which contains standardised modular ecological detailed solutions enables an exact dimensioning and installation of passive houses by small carpentering companies.

Stadt der Zukunft

Energy optimised design rules and integral planning approach for building-integrated photovoltaics in urban areas (VITALITY)

The VITALITY project aims to provide supporting tools, design rules and robust information in the early decision and design phase of building projects. By providing the right information at the right time, building-integrated photovoltaics (BIPV) is part of the discussion in the concept phase and the implementation is strongly prepared and supported.

Haus der Zukunft

"gugler! build & print triple zero" - Subproject 8: Leuchtturm gugler – Ökoeffektive Plusenergiedruckerei

On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building had been developed.

Haus der Zukunft

Office Building WKS - Plus Energy Office Building in Ernstbrunn

The new office building (headquarter) of Windkraft Simonsfeld AG in Ernstbrunn (Lower Austria) is planned as a plus energy building. From this excellent starting conditions it is intended to make seven more steps to explore innovative options for energy plus buildings.

Haus der Zukunft

Demonstration building of the eco²building system: First passive house prefabricated wood building system for commercial and industrial buildings

The EU funded "eco2building" construction system in a timber-frame based modular design represents a systematic approach for energy efficient commercial and industrial buildings. The object of the eco²building demonstration project - the logistics centre in passive-house quality for "Eine Welt Handel AG" - in Niklasdorf was to optimize the planning and construction processes and prepare for the market launch of the eco²building construction system. Accompanying research monitored and disseminated the experience.

Haus der Zukunft

"gugler! build & print triple zero" - Subproject 7: Integrated General Planning

The aim of the subproject 7 is to aggregate a "normal" general planning process with innovative additional services. In the spirit of integrated planning in the design a higher number of design parameters must be resolved. This is different to a classic planning process with linear and chronological lined up add ons.

Haus der Zukunft

"gugler! build & print triple zero" - subproject 5: Ecoeffective building

On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building will be developed.

Haus der Zukunft

SIMULTAN - Simultaneous planning environment for buildings in resilient, highly energy efficient and resource-efficient districts

This project enabled the opportunity for an essential energy efficiency increase within overlapping buildings, to achieve the objective of resilient cities and districts with respect to a high quality of life, resource sustainability and energy efficiency. The goal was a workable tool based on a multidisciplinary planning approach, to support the decision finding process in order to design both refurbishment projects and new developments within a highly efficient city.

Haus der Zukunft

ECR Energy City Graz-Reininghaus: Urban strategies for the new conception, construction, operation and restructuring of an energy self-sufficient city district

The aim is the development of a valid set of specific values and a guideline as a basis for energy self-sufficient district development. Based on the results, a masterplan (energy-network) for the district Graz-Reininghaus shall be developed. Future-oriented "city-building-blocks" will be implemented as flagships of innovation.

Stadt der Zukunft

SUBURBAHN – test- and demonstration-area for urban development and mobility around public transport stations in the central area of Upper Austria

Targeted, process-oriented conception for the implementation and operation of a test- and demonstration-area for urban development and mobility in Ansfelden involving relevant scientific stakeholders, local and regional stakeholders, decision-makers as well as the interested public according to the living lab approach.

Haus der Zukunft

"gugler! build & print triple zero" - subproject 3: recyclable constructing

Development of basic principles and proposals for highly recyclable constructions. A catalogue with main principles of recyclable designing with a particular focus on material inherent bonding and joint techniques as well as a selection of constructions including ecological benchmarks, calculation of building physics plus costs was created.