Suchergebnisse für "Factsheet: Energietechnologien gestalten, die für alle sinnvoll und nutzbar sind"

Haus der Zukunft

Passive house Kindergarten with an integrated therapeutical group

Applied passive house techniques with locally available materials for a public building using limited funds.

Haus der Zukunft

PEB - Plus-Energy-Office

An integrated technical energy plus office concept without additional building costs demonstrates the feasibility of such projects instancing a concrete office project with 50.000 m² floor area in Vienna with economical cost consideration.

Haus der Zukunft

Comparative analysis and evaluation of innovative building concept models in terms of key ecological and economic figures during life cycle of individual building concepts

The aim of this research project was to subject a number of building concept models to a comprehensive comparative analysis and evaluation in terms of key ecological and economic figures.

Haus der Zukunft

Effective Comfort in a Climatic comfort house

Sophisticated implementation of different passive house-building services systems on a basis of four similar parts of a structure of multi-storey dwelling houses.

Haus der Zukunft

Urban consolidation Lehen - Subproject 8a: project management - documentation - dissemination and quality assurance

The project coordinates several projects in the urban quarter Lehen to ensure increase of energy efficiency and sustainable development. This subproject contains the coordination of the partners and projects in order to reach defined standards of quality, coordination and cooperation with the program "Building of Tomorrow" and other flagship projects as well as the documentation of results.

Stadt der Zukunft

6D BIM-Terminal: Missing Link for the development of CO2 neutral buildings

The present project aims to close the gap between specialist consultants and Building Information Modeling (BIM) applications. For that, relevant data for cost estimation, scheduling construction planning and management or sustainable building operation and facility management, shall be added automatically to BIM elements and imported into the respective specialist planning software. This data exchange shall be carried out using IFC interface according to ÖNORM A6241-2 and the properties of the ASI properties server via a central platform, the "6D BIM-Terminal".

Haus der Zukunft

EXPO HdZ: Best of Diffusion

Conception and implementation of measures to spread selected results from the house of the future - program to the building industry, in particular to meet the target groups architects, builders and building developers.

Haus der Zukunft

SOL4 business and training center Eichkogel

Demonstration project for sustainable construction of a working and living environment

Haus der Zukunft

Beacon of innovation gugler cross media, ecoeffective zero energy cross media enterprise featuring zero-emission, zero energy, zero waste

The aim of the flagship project is a new dimension of sustainability (cradle to cradle, ecoeffective zero energy enterprise) for business operation and building, which means zero emission, zero energy, zero waste. This will be shown on the basis of a beacon of innovation: Gugler GmbH, a modern sustainable media services enterprise (traditional print and new media) will extend their current building from about 2100 square meters and about 90 employees to about 5,000 square meters.

Haus der Zukunft

Ecological Passive houses

Discussion of transfer of know how for ecological passivehouses, networking (national and international)

Haus der Zukunft

Development and application of an consultancy model to promote sustainable building design

Development of an consultancy model to promote ecologic and economic sustainable building solutions within the planning process. Analysis of the efficiency of guided (integral) meetings with architects, planners, and experts for different items.

Haus der Zukunft

"gugler! build & print triple zero" - subproject 4: energy concept Gugler

The energy concept led Gugler in frame of the conversion and expansion of the company towards plus-energy standard. Significant measures ware a consequent maximum reduction of the energy demand, optimal utilisation of industrial waste-heat, maximum consumption of on-site energy sources, integrated energy production, ecologic load manage­ment with comprehensive response- and storage-techniques.

Haus der Zukunft

Modular and standardised passive houses in solid timber construction

Concerning to an accurate and adaptable construction of 2 to 4 storey solid timber houses with the characteristics of a passive house, a digital construction and dimension system will be developed. The system which contains standardised modular ecological detailed solutions enables an exact dimensioning and installation of passive houses by small carpentering companies.

Stadt der Zukunft

Energy optimised design rules and integral planning approach for building-integrated photovoltaics in urban areas (VITALITY)

The VITALITY project aims to provide supporting tools, design rules and robust information in the early decision and design phase of building projects. By providing the right information at the right time, building-integrated photovoltaics (BIPV) is part of the discussion in the concept phase and the implementation is strongly prepared and supported.

Haus der Zukunft

Demonstration project senior-housing concepts for new construction and renewal in Vienna, Menzelgasse

Acompagning the process of realisation and settlement of two projects of senior-housing (new construction and renewal), documentation and general assumptions.

Haus der Zukunft

"gugler! build & print triple zero" - Subproject 8: Leuchtturm gugler – Ökoeffektive Plusenergiedruckerei

On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building had been developed.

Haus der Zukunft

Office Building WKS - Plus Energy Office Building in Ernstbrunn

The new office building (headquarter) of Windkraft Simonsfeld AG in Ernstbrunn (Lower Austria) is planned as a plus energy building. From this excellent starting conditions it is intended to make seven more steps to explore innovative options for energy plus buildings.

Haus der Zukunft

Offices in times of climate change

Study about the impact of climate change on the thermal comfort in office buildings. Special attention is paid to the users´ behaviour. Basic information for the development of detailed strategies for adjustments by the real estate industry and by politics, who are actively involved into the project by participating in start and result workshops.

Haus der Zukunft

Demonstration building of the eco²building system: First passive house prefabricated wood building system for commercial and industrial buildings

The EU funded "eco2building" construction system in a timber-frame based modular design represents a systematic approach for energy efficient commercial and industrial buildings. The object of the eco²building demonstration project - the logistics centre in passive-house quality for "Eine Welt Handel AG" - in Niklasdorf was to optimize the planning and construction processes and prepare for the market launch of the eco²building construction system. Accompanying research monitored and disseminated the experience.

Haus der Zukunft

"gugler! build & print triple zero" - Subproject 7: Integrated General Planning

The aim of the subproject 7 is to aggregate a "normal" general planning process with innovative additional services. In the spirit of integrated planning in the design a higher number of design parameters must be resolved. This is different to a classic planning process with linear and chronological lined up add ons.