Suchergebnisse
IEA ISGAN Working Group 9: Flexibility Markets - Development and Implementation (Working Period 2023 - 2025)
ISGAN Working Group 9 focuses on flexibilities in the power system and related market mechanisms. Main work areas include the integration of trading with flexibilities (redispatch), investigation of the needs of different market participants, identification and definition of flexibilities and their characteristics, development and scaling of interoperable flexibility markets, consumer-oriented understanding of flexibilities and the avoidance of stability or security losses due to diversity loss.
IEA Bioenergy Task 34: Direct Thermochemical Liquefaction (Working Period 2024 - 2028)
Direct thermochemical liquefaction of biomass and residues enables the production of fuels, bioenergy and other green carbon products. The co-production of several products is particularly important for the economic efficiency of the overall process. This project provides technology overviews of decentralized pyrolysis plants and case studies on co-production of green gas and biochar as well as integration into bioenergy systems.
IEA Bioenergy Task 44: Flexibilization and System Integration (Working Period 2025 - 2027)
What are the benefits of more integrated processes and systems? How can we measure integration and what should we look for when coupling between different sectors? IEA Bioenergy Task 44 provides answers to these and similar questions, especially in relation to a circular bioeconomy and the energy transition.
IEA Bioenergy Task 37: Energy from Biogas (Working Period 2025 - 2027)
Anaerobic digestion systems are an important component in waste and wastewater management as well as in agriculture. The state of the art of the technologies and the development of the sector vary greatly internationally. The main topics of the exchange of experience in task 37 are Co-benefits of biogas in the circular economy, framework conditions for digestate utilization, monitoring of microbial cultures in biogas plants, and comparison of economic framework conditions.
aspern Die Seestadt Wiens - Subprojekt 3a: Technologiezentrum aspern IQ
Anhand des Demonstrationsgebäudes Technologiezentrum aspern IQ wurde gezeigt, dass der Energiebedarf für die Raumkonditionierung (Heizung, Kühlung, Lüftung, Beleuchtung, Warmwasser) aus Energieeigenproduktion über die Jahresbilanz gedeckt werden kann.
Thermische Bauteilaktivierung - Entwicklung eines Rechenkerns (TBA-CALC)
Mit dem Projektergebnis steht in Österreich eine einheitliche Softwareumgebung zur Simulation der thermischen Bauteilaktivierung in Form eines validierten Tools zur Verfügung.
Modular and standardised passive houses in solid timber construction
Concerning to an accurate and adaptable construction of 2 to 4 storey solid timber houses with the characteristics of a passive house, a digital construction and dimension system will be developed. The system which contains standardised modular ecological detailed solutions enables an exact dimensioning and installation of passive houses by small carpentering companies.
BIGMODERN - Subprojekt 4: Planungsbegleitende Lebenszykluskostenanalyse
Schaffung technischer und organisatorischer Voraussetzungen für Bauherrn, um planungsbegleitende Lebenszykluskostenanalysen in den Standard Planungsprozess zu integrieren sowie konkrete Anwendung in den beiden Demonstrationsprojekten des Leitprojekts BIGMODERN (SP2 und SP3). Durch Veröffentlichung der wesentlichen Projektergebnisse werden konzeptive Grundlagen und LZKA-Berechnungsergebnisse für alle Stakeholder der Immobilienwirtschaft verfügbar gemacht.
IEA ISGAN Annex 5 (SIRFN): Interconnection Standard Grid-Support Function Evaluations Using an Automated Hardware-in-the-Loop Testbed (2018)
Im Rahmen von IEA ISGAN-SIRFN wurden auf Basis der AIT Smart Grid Converter Plattform automatisierte Tests von netzstützenden Funktionen Smarter Wechselrichter durchgeführt.
Herausgeber: IEEE Journal of Photovoltaics, vol. 8, no. 2, pp. 565-571, doi: 10.1109/JPHOTOV.2018.2794884
Englisch
IEA HPT Annex 47: Barriers and Opportunities for Large-Scale Heat Pumps in Austrian District Heating and Cooling Networks (2018)
In der Präsentation wurden Ergebnisse aus dem laufenden Projekt bezüglich Barrieren und möglichen Chancen für Großwärmepumpen in österreichischen Fernwärme- und Fernkälte (FWK)-Netzen vorgestellt. Die Ergebnisse wurden im Rahmen des Projektes erarbeitet.
Roman Geyer
Herausgeber: AIT - Austrian Institute for Technology
Englisch, 15 Seiten
Downloads zur Publikation
IEA Bioenergy Task 37: Energy from Biogas (Working Period 2019 - 2021)
Aim of Task 37 is to accelerate development and progress of biogas technology in the member countries. During the working period 2019-2021 the focus lies on the ecologically and economically sound implementation of biogas technology in agricultural and industrial processes.
IEA Bioenergy Task 42: Biorefining in a Circular Economy (Working Period 2019-2021)
Biorefineries can provide a wide range of products such as energy, fuels, chemicals, food, feed and materials based on renewable resources. In this project, relevant information on biorefineries regarding technologies and biobased products will be compiled at international expert level and results on an ecological and economic assessment of selected biorefineries will be provided.
smartEXT - Erweiterung der Einsatzgrenzen bewährter Passivhaustechnik
Sondierung der Einsatzmöglichkeiten von Kompaktgeräten (Komfortlüftung mit Kleinstwärmepumpe, entwickelt für Passivhäuser) in Niedrigenergiehäusern. Kompaktgeräte zur Wärmerückgewinnung, Heizung und Warmwasserbereitung decken die Grundlast, Spitzenlasten werden durch eine neuartig konzipierte Zusatzheizung mit verknüpfter intelligenter Regelung abgefangen. Damit wird eine Steigerung der energetischen Effizienz, somit verbesserte Wirtschaftlichkeit, sowie höherer Wohnkomfort bei gleichzeitiger Entlastung der Umwelt erzielt.
Lab Tests: Verifying that Smart Grid Power Converters are Truly Smart
Im Rahmen von IEA-ISGAN-SIRFN wurden von AIT (Österreich), SANDIA National Laboratories (USA) und TECNALIA (Spanien) Testverfahren entwickelt, mit deren Hilfe die Smart Grids Funktionen von PV Leistungsumrichtern umfassend validiert werden können.
Feeding Biogas Into The Austrian Natural Gas Grid
Analyses of technological, economic, and legal prerequisites as well as pilot projects within the "energy systems of tomorrow” subprogram
Forschungsforum
2/2006
Herausgeber: BMVIT
Englisch, 6 Seiten
Downloads zur Publikation
Multifunctional Energy Centres - The Biogas Example
Generating heat, power and engine fuel - projects within the subprogram "Energy systems of tomorrow"
Forschungsforum
1/2009
Herausgeber: BMVIT
Englisch, 6 Seiten
Downloads zur Publikation
Broschüre "Energieeffizientes Bauen und Sanieren in den Alpen"
Herausgeber: CIPRA-Österreich
Deutsch
Single Family Homes and Densified Low-rise Housing - an Analysis of Motives
The study concentrates on describing the reasons behind the slow uptake of space-saving, densified forms of housing, and explains the dominant preference for detached single-family homes. However, it goes beyond simply describing the decisive motives for choices of housing. The study analyses the determining factors and the basic conditions under which these motives come or came into being. Based on this analysis, alternatives will be proposed and evaluated with regard to their effectiveness and feasibility.
Synthesis Report: Mobilisierung nachhaltiger Bioenergie-Versorgungsketten (Mobilizing Sustainable Bioenergy Supply Chains)
Der Bericht enthält das Ergebnis eines Projekts von Task 37, 38, 39, 40, 42 und 43, in dem anhand von fünf Fallstudien die Chancen und Risiken typischer Biomasse-Versorgungsketten analysiert wurden.
built in 2020 - Pictures and stories of tomorrow for building in the future
Production of a comprehensive picture of tomorrow's building using research into future trends, the societal framework and political developments in the building sector.