Suchergebnisse

Haus der Zukunft

aspern + Vienna's Urban Lakeside - sustainable urban development

The focal points of the largest urban development project in Europe are the topics public space and microclimate as well as cross-building energy supply. Landmark projects will be implemented in the areas residential buildings, office/industry buildings and mobility.

Haus der Zukunft

Stroh-Cert: certification, logistic and quality management for straw bale buildings

Certification of straw bales as insulating material, development of a straw bale logistic concept and a quality management system as strategic measures with the aim of the dissemination of straw bales as insulating material

Haus der Zukunft

Pallets never pall - Development of the Pallet House to series-production readiness

The winning project "Pallet House" of the EU-wide competition GAU:DI in 2007 consists of 800 (used) pallets. It has been exhibited in a scale 1:1 at the Biennale in Venice 2008 and has been developed for mass production within this project. Therefore, two exemplary scenarios were developed: (temporary) construction at Vienna's Urban Lakeside in Aspern and the construction of a low-cost building in South Africa.

Haus der Zukunft

Competition for prefabricated house producers to design types of attached houses

A competition for the builders of prefabricated houses provided new design-types of attached houses. The results have been awarded and published to encourage the participants to enter this segment of the market.

Haus der Zukunft

Demonstrationsvorhaben seniorenbezogene Konzepte in Neubau und Sanierung

Begleitung der Bau- und Besiedlungsphase der beiden als seniorenbezogene Bauvorhaben ausgeführten Projekte (Neubau und Sockelsanierung), Dokumentation und verallgemeinerbare Schlussfolgerungen

Haus der Zukunft

LifeCycle Tower - Energy efficient prefabricated multi-storey timber houses

Based on the results of previous research projects, the project at hand deals with the development of a wooden prefabricated module construction for energy efficient office buildings with up to 20 storeys. This sustainable system ensures cost certainty through the whole life cycle of the building.

Haus der Zukunft

Operational and maintenance costs in passive houses and low energy houses

How much energy does a passive house actually save? Does a passive house pay-off by itself? What are the costs for maintancence? For the first time an approximation for the running costs of a passive house were systematically documented and compared.

Haus der Zukunft

aspern Vienna´s Urban Lakeside subproject 2: Inter-building energy distribution

Development of comprehensive concepts for local distribution systems for thermal and electric energy within a residential area including the consideration of the interaction with construction and city planning. Derivation of measures for demonstration buildings and the infrastructure of the residential area. Integration of computing models to a prototype simulating energy distribution in the residential area.

Haus der Zukunft

aspern Die Seestadt Wiens - Subprojekt 2: Gebäudeübergreifende Energie

Entwicklung umfassender Konzepte für lokale siedlungsbezogene Energieverteilsysteme thermischer und elektrischer Energie sowie deren Wechselwirkung mit der Bauausführung und der Raumplanung. Ableitung von Maßnahmen für Demogebäude und Siedlungsinfrastruktur. Integration zu einem wird ein Prototyp einer Sieldungssimulation.

Haus der Zukunft

ECR Energy City Graz - subproject 3: +ERS - Plus Energy Network Reininghaus Süd

The multifunctional neighbourhood "+ERS - Plus Energy Network Reininghaus Süd" was realized within the urban planning area of Graz-Reininghaus. The project aims to optimize the energy concept of the single buildings as well as of the building cluster in order to achieve a plus-energy standard within the residential neighbourhood.

Haus der Zukunft

Sol2Pump - High efficient combination of solar thermal plants, photovoltaic and heat pumps

Targeting a high level of decentralised energy supply on basis of renewable energy, the project analysed the possible combinations of solar thermal energy, photovoltaic and heat pumps. The project aimed to maximise the domestic energy supply due to utilisation of the building as short term energy storage. In addition to that, several optimisation measures had been developed. The impact on the energy supply and demand will be economically assessed through life cycle costing. On this basis, the potential load transfer and the use of this kind of systems had been evaluated in combination with smart grids.

Haus der Zukunft

aspern Vienna´s Urban Lakeside - subproject 6b: Monitoring of Energy Consumption in Demonstration Buildings in Seestadt Aspern

The project deals wtih the energy consumption monitoring of demonstration buildings, which are erected within the framework of the landmark project "aspern+". As both, office/manufacturing as well as residential buildings will be constructed, these different user groups will have to be considered. The derivation of the concepts will be done in accordance of the specific needs of the individual demonstration buildings.

Haus der Zukunft

OPEN LIVING PLUS - building structures and utilization options with high social functionality and plusEnergie-standard for rural regions

In small to medium sized communities in rural Regions there is a high demand for sustainable building and space for innovative living facilities, to satisfy the requirements of current and coming life designs. The project’s intentions were to provide social scientific groundwork, develop building structures and utilization options of high social functionality and to transfer knowledge to decision makers in communities and regional authorities.

Haus der Zukunft

Beacon of innovation gugler cross media, ecoeffective zero energy cross media enterprise featuring zero-emission, zero energy, zero waste

The aim of the flagship project is a new dimension of sustainability (cradle to cradle, ecoeffective zero energy enterprise) for business operation and building, which means zero emission, zero energy, zero waste. This will be shown on the basis of a beacon of innovation: Gugler GmbH, a modern sustainable media services enterprise (traditional print and new media) will extend their current building from about 2100 square meters and about 90 employees to about 5,000 square meters.

Haus der Zukunft

Innovationsleuchtturm gugler cross media, ökoeffektive Plusenergiedruckerei in Gebäude und Produktion, zero emission, zero energy, zero waste

Ziel des Leitprojektes ist eine neue Dimension der Nachhaltigkeit: cradle to cradle für Betrieb und Gebäude, das bedeutet zero emission, zero energy, zero waste. Dies soll anhand des Leuchtturmprojektes Gugler GmbH, eines modernen nachhaltigen Mediendienstleistungsbetriebes (klassische Druckerei und neue Medien, der von derzeit ca. 2100 m² und ca. 90 Mitarbeitern auf ca. 5000 m² erweitert werden soll) gezeigt werden.

Haus der Zukunft

ECR Energy City Graz - Reininghaus: Urbane Strategien für die Neukonzeption, den Bau, Betrieb und die Umstrukturierung des energieautarken Stadtteils

Ziel ist die Erarbeitung von allgemein gültigen Kennwerten und eines Leitfadens als Grundlage für energieautarke Stadtteilentwicklungen. Aufbauend auf den Ergebnissen soll ein Gesamtenergiekonzept (Energienetzwerk) für den energieautarken Stadtteil Graz-Reininghaus erstellt werden. Durch den Bau von Demonstrationsprojekten sollen international zukunftsweisende "nachhaltige Stadtbausteine", als sichtbare Leuchttürme der Innovation umgesetzt werden.

Haus der Zukunft

Demonstration building of the eco²building system: First passive house prefabricated wood building system for commercial and industrial buildings

The EU funded "eco2building" construction system in a timber-frame based modular design represents a systematic approach for energy efficient commercial and industrial buildings. The object of the eco²building demonstration project - the logistics centre in passive-house quality for "Eine Welt Handel AG" - in Niklasdorf was to optimize the planning and construction processes and prepare for the market launch of the eco²building construction system. Accompanying research monitored and disseminated the experience.

Stadt der Zukunft

SUBURBAHN – test- and demonstration-area for urban development and mobility around public transport stations in the central area of Upper Austria

Targeted, process-oriented conception for the implementation and operation of a test- and demonstration-area for urban development and mobility in Ansfelden involving relevant scientific stakeholders, local and regional stakeholders, decision-makers as well as the interested public according to the living lab approach.

Haus der Zukunft

SIMULTAN - Simultane Planungsumgebung für Gebäudecluster in resilienten, ressourcen- und höchst energieeffizienten Stadtteilen

Es soll die Möglichkeit zur Steigerung der Effizienz gebäudeübergreifender Energiesysteme geschaffen werden um dem Ziel resilienter Städte und Stadtteile mit hoher Lebensqualität, Ressourcen- und Energieeffizienz nahe zu kommen. Ziel war ein auf simultaner technischer Planung basierendes praxistaugliches Werkzeug zur Entscheidungsunterstützung bei Sanierungs- und Neubauplanungen (bis zu Plusenergiegebäuden) in hocheffizienten Stadtteilen.

Haus der Zukunft

Solarenergie Urban - Analyse und Bewertung der ökonomischen, energetischen und architektonischen Qualität urbaner Solarenergiebauten

Dieses Projekt entwickelte energetisch und ökonomisch optimierte Planungsgrundlagen für den mehrgeschoßigen Wohnbau zur Integration von erneuerbaren Energiesystemen in die Gebäudehülle. Es wurden die Bereiche Neubau und Sanierung bearbeitet.