Suchergebnisse für "Factsheet: Energietechnologien gestalten, die für alle sinnvoll und nutzbar sind"
Itz Smart – Carbon neutral city district development Itzling – Implementing innovation and technology via co-operative process design
The goal of the project “Itz Smart” is to tie in with existing activities and to consistently develop Itzling as a residential location further. In the test and demonstration area, sustainable residential quarters with trendsetting solutions for mobility are developed in the zone of the transport axis (railway and Schillerstraße) and along the local supply axis (Itzlinger Hauptstraße). The consideration of housing and mobility with regard to the aspect of “city of short ways“ also entails a discussion of determined mixed utilisation and the development of such residential quarters.
Integrated ecological and energy-oriented refurbishment of service buildings - development of quality criteria and tools within a pilot project (LCC-ECO)
![](/includes/images/pdf-placeholder.png)
Formulation of a procedure for the general refurbishment of service buildings and development of guidelines to support building owners and facility-managers in each stage of the refurbishment process in order to reach an integrated ecological and energy-oriented refurbishment.
AIA4ALL - development of open, modular and automatable employer’s information requirements (EIR) and BIM execution plan (BEP)
The Employer's Information Requirements - EIR (German: AIA) - serves the client to define goals and use cases for a BIM-based construction project. The aim of this project is to create a modular, machine-readable AIA that can be seamlessly integrated into the tool landscape of openBIM projects. This is done by developing an open platform for creating use cases for the AIA.
StromBIZ - demonstration projects: business models for decentralized electricity generation and distribution
Feasible business models to utilize locally generated renewable energy are expected to induce a tipping point for the "Energy Turnaround" in Austria. Within the proposed project a number of demonstration PV plants on residential and non-residential buildings had been realized. On this basis new approaches of business cases had been developed, implemented, tested and disseminated.
BIMBestand - BIM-based management of existing buildings
The objective of this research project is to develop information requirements and process descriptions for the application of BIM models related to building services in facility management and to demonstrate the lifecycle-oriented use of these models in an open BIM environment. For this purpose, software solutions for the use of IFC in the open-source platform SIMULTAN and building management software are developed and evaluated on the basis of four typical use cases.
Demonstration building of the eco²building system: First passive house prefabricated wood building system for commercial and industrial buildings
The EU funded "eco2building" construction system in a timber-frame based modular design represents a systematic approach for energy efficient commercial and industrial buildings. The object of the eco²building demonstration project - the logistics centre in passive-house quality for "Eine Welt Handel AG" - in Niklasdorf was to optimize the planning and construction processes and prepare for the market launch of the eco²building construction system. Accompanying research monitored and disseminated the experience.
Office Building WKS - Plus Energy Office Building in Ernstbrunn
The new office building (headquarter) of Windkraft Simonsfeld AG in Ernstbrunn (Lower Austria) is planned as a plus energy building. From this excellent starting conditions it is intended to make seven more steps to explore innovative options for energy plus buildings.
OWA+Quartier - Sustainable refurbishment and energy supply for the historic Otto-Wagner-Areal towards a plus-energy district
Development of thermal and electrical energy supply for the Otto-Wagner-Areal as well as model solutions for construction and building services in order to initiate the redevelopment of the area in the direction of a plus-energy district.
Applying passive technologies in social housing, 1140 Vienna; Utendorfgasse 7
![](/includes/images/pdf-placeholder.png)
Multi-storey social passive house construction with 39 units in Vienna, 14 Utendorfgasse under adherence to the international passive house standard and simultaneous extremely low construction costs.
Study of the Potential of Popcorn-Technologies for the Austrian Energy System
Urban MoVe - Private law contracts as innovative instruments for city and mobility planning.
The research project Urban MoVe investigated to what extent private-law contracts (e.g. mobility contracts, funds, urban development contracts) are suitable as municipal planning and steering instruments for mobility at residential locations based on best practice analyzes and implemented national practical examples.
"gugler! build & print triple zero" - Subproject 7: Integrated General Planning
The aim of the subproject 7 is to aggregate a "normal" general planning process with innovative additional services. In the spirit of integrated planning in the design a higher number of design parameters must be resolved. This is different to a classic planning process with linear and chronological lined up add ons.
Data for schooling focused on passivehouses
![](/includes/images/pdf-placeholder.png)
Elaboration of high quality data about Passive Houses technology, to be used in training programs for building related professionals.
Development of a Cost-Benefit-Tool: costs and benefits of energy efficient and ecologic buildings
Development of a cost-benefit-tool which reaches beyond a pure cost approach and also recognizes the benefits of a building for its inhabitants and users. The inclusion of benefits is based on existing evaluation systems, especially on the Austrian building evaluation system TQB - Total Quality Building, which has been revised in 2009.
Sprayed-on and Plaster-covered Cellulose-insulation without vapour barrier
![](/includes/images/pdf-placeholder.png)
Investigations on the fundamental suitability of sprayed-on and plaster-covered cellulose insulation for thermal insulation of buildings.
"gugler! build & print triple zero" - subproject 5: Ecoeffective building
On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building will be developed.
Space & Green. Possibilities for integrating greening into the regulations of Austrian spatial planning
The R&D service "Raum & Grün" (Space & Green) prepared a study that depicts the interrelationships between spatial planning and greening, shows the need for action and the scope for action by actors, and formulates concrete recommendations on how innovative urban greening and greening of buildings can be effectively anchored in the regulations of Austrian spatial planning.
GreenPlusSchool@urban - Highly efficient facade and roof greening in combination with PV; optimal solution for energy efficiency in overall environmental consideration
In this project, different building-greening systems and plant/substrate types, combined with various PV modules, had been examined on a Viennese school. The influence on the hygrothermal behaviour of the building, energy-saving potential, humidity, shading, noise reduction, water retention and heat island effect are being scientifically explained. The students of the school will also be involved.
Timber construction for high-density housing
![](/includes/images/pdf-placeholder.png)
Development of technical and economical solutions for high-density housing in timber construction under consideration of future regulatory developments (case study of a 5-story housing complex in Vienna).
SUBURBAHN – test- and demonstration-area for urban development and mobility around public transport stations in the central area of Upper Austria
Targeted, process-oriented conception for the implementation and operation of a test- and demonstration-area for urban development and mobility in Ansfelden involving relevant scientific stakeholders, local and regional stakeholders, decision-makers as well as the interested public according to the living lab approach.