Suchergebnisse
Passive cooling concepts for office and administrative buildings using earth-to-air and earth-to-fluid heat exchangers

Analysis of existing passive cooling concepts, examination of various other passive cooling concepts and a comparison with conventional air conditioning systems. The elaboration of practice-oriented tools for the planning and implementation of the passive cooling concepts selected.
Rebuilding of the organic farm Achleitner, straw & clay - room climatisation with plants

Rebuilding of a marketing-, store- and processingcenter with an organic freshmart and an organic restaurant in passivhouse quality. Application of regional building materials, an innovatve overall energyconcept, climatisation with plants.
"gugler! build & print triple zero" - subproject 6: Integration of the C2C production into the flagship project Gugler
Print and media production at the media and communications company gugler GmbH are currently being optimized according to Cradle to Cradle (C2C) criteria. The goal of this subproject is to allow the demands of a C2C production process optimized for exchange with biological cycles to be included into the general planning of the new production building of the company, a pilot project within the "building of tomorrow" program line.
BIGMODERN - Subproject 2: Demonstration project of an official building in Bruck
In the frame of this subproject being part of the flagship project BIGMODERN, a decision matrix as well as a handbook for planning, including feasibility analysis and a collection of information, serving as decision guidance for planning and implementation of sustainable building refurbishment, is being developed. In this way, the risk for planners and builders of the usage of new sustainable technologies shall be minimised.
Ecological restoration of a listed building with passive house technologies
Ecological exemplary reconstruction of the "Haidenhof"-building, Bad Ischl, Upper Austria. Building refurbishment with respect to monumental protection and newest passive house technologies. Reorganisation of the former residential building to an academy of arts and culture.
Hygrothermal behaviour of double-skin facades in solar irradiation - theory evaluation by means of on-location measurements

Detailed clarification of the base parameters of thermodynamic simulation calculations by means of on-location measurements on the five-storey double-skin facade of the Federal Institute of Social Education in Baden bei Wien
Development of a "Light Well" for daylight transparent, highly energy-efficient, multi-story buildings
Daylight supply of multi-story buildings with the help of rooflight openings. Reflecting vertical ducts transport light down to the lowermost floor. The idea promises new building structures with daylight transparency and high energy-efficiency that have a minimal demand of artificial light and cooling at optimal comfort.
Evaluation of mechanical class room ventilation systems in Austria and generation of a planning guideline
Accumulation of technical solutions and practical experience of schools (kindergarten) with mechanical ventilation systems and identification of how pupils and teachers accept the systems.
High-quality refurbishment - Designing quality standards for the refurbishment of municipal buildings

Designing quality standards for ecological refurbishment (based on E. Panzhauser's proposals, 2001); applying them to characteristic types of buildings systematically selected in diverse municipalities; the achieved results shall serve as good practice examples for future refurbishment and as basis of discussion on subsidy regulations.
"gugler! build & print triple zero" - subproject 5: Ecoeffective building
On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building will be developed.
Architecturally Diverse, Energetic Renewal

Post War Modernist Buildings Under Monument Protection. A Comparative Analysis of Energy Efficient Renewal Case study: Open Air School Franklinstrasse, Wien 21
Beacon of innovation gugler cross media, ecoeffective zero energy cross media enterprise featuring zero-emission, zero energy, zero waste
The aim of the flagship project is a new dimension of sustainability (cradle to cradle, ecoeffective zero energy enterprise) for business operation and building, which means zero emission, zero energy, zero waste. This will be shown on the basis of a beacon of innovation: Gugler GmbH, a modern sustainable media services enterprise (traditional print and new media) will extend their current building from about 2100 square meters and about 90 employees to about 5,000 square meters.
Passive house Kindergarten with an integrated therapeutical group
Applied passive house techniques with locally available materials for a public building using limited funds.
Construction Site SCHOOL - Sustainable Models for the Refurbishment of School Buildings?
In this research project, models for refurbishment and restructuring of school buildings were developed. The reconstruction concepts contain lists of measures for deploying sustainable building techniques and exemplary case studies for the reorganisation of buildings of different typologies.
"gugler! build & print triple zero" - subproject 1: lead project management
The lead project management provides furthermore for sufficient interlinking between the project partners by monthly, by requirement weekly project workshops. Besides the leading project management represents the project gugler to the outward and takes part in workshops of the program management
Plus energy office building - Subproject 3: Austria's biggest plus energy office building
In course of the refurbishment of the Vienna University of Technology (Univercity 2015) Austria´s biggest plus energy office building is going to be built. This project intends to demonstrate not only the technical but furthermore the economical feasibility of plus energy office buildings. Within this building the plus energy concept is fulfilled by optimizing the power consumption of the whole building and the installation of Austria´s largest facade integrated photovoltaic plant.
aspern Vienna´s Urban Lakeside subproject 8: Overall Project Management Landmark Project "aspern+"
The Overall Project Management of the "Leitprojekt" includes the handling and supervision of the sub-projects, the reporting to the programme management and additionally the preparation and distribution of relevant results. Beyond that the project management is responsible to highlight possible synergies within other projects and to - if necessary - include these within the next steps.
BIGMODERN - Subproject 11: Dissemination of project results
The project is part of the flagship project BIGMODERN. It aims at disseminating all relevant results of BIGMODERN in a comprehensive and targeted way. It addresses different target groups, such as decision makers inside the BIG Bundesimmobiliengesellschaft, various users of federal buildings and other real estate companies nationally and internationally.
Multifunctional City Nucleus
Sustainable mixed-use utilization of urban commercial and industrial areas with a specific focus on energy-related aspects.
First passive-house school reconstruction

Factor 10 refurbishment of the General Secondary School II and Polytechnic School of Schwanenstadt (Upper Austria) with prefabricated wooden façade elements and with a comfort ventilation system.