Suchergebnisse für "Factsheet: Energietechnologien gestalten, die für alle sinnvoll und nutzbar sind"
Monitoring Sunhouse Eferding
In course of the monitoring project the effectiveness of the energy-technical system was checked on the basis of running measuring data. The data were evaluated and, if required, the arrangements and settings of the control system were adapted. Main result is that the energy balance could have been improved explicitly whilst the monitoring process.
Serial refurbishment for buildings in timber construction
Refurbishment of single- and two-familiy houses in timber construction in Austria has a large CO2-saving potential. To meet the special requirements for the refurbishment of timber constructions, a concept for the renovation to passive house respectively plus-energy house standard with special focus on ecologic construction materials was developed in this project.
Sunny Energy Building: ENERGYbase - Office building of tomorrow
Energybase is a showcase project in terms of energy efficiency and use of renewable energies realized by the Vienna business agency. With 7.500 sqm net floor area ENERGYbase provides space for innovative business and research and development on the field of green energy.
BIGMODERN - Subproject 6: Incentives to enforce energy efficiency and sustainability in modernizations of BIG-buildings
Development of approaches, which lead to general conditions for complete refurbishments in BIG-buildings, which support high standards regarding energy efficiency and sustainability. This will ensure high-quality modernizations for BIG's real estate.
BIGMODERN - Subproject 10: Evaluation, Documentation and Ensuring Transferability
The subproject 10 is part of the flagship project BIGMODERN. It is based on the results of subproject SP 7 in which a monitoring concept has been developed. This concept is now implemented through monitoring of different aspects occurring during the first two years of operation of both BIGMODERN demonstration buildings.
"gugler! build & print triple zero" - subproject 1: lead project management
The lead project management provides furthermore for sufficient interlinking between the project partners by monthly, by requirement weekly project workshops. Besides the leading project management represents the project gugler to the outward and takes part in workshops of the program management
BIGMODERN - Subproject 11: Dissemination of project results
The project is part of the flagship project BIGMODERN. It aims at disseminating all relevant results of BIGMODERN in a comprehensive and targeted way. It addresses different target groups, such as decision makers inside the BIG Bundesimmobiliengesellschaft, various users of federal buildings and other real estate companies nationally and internationally.
Beyond - Virtual Reality enabled energy services for smart energy systems
Collaborative R&D project to develop the next generation energy services with the interplay of various technologies: Virtual Reality (VR), machine learning, physical simulation and Internet of Things (IoT) platforms.
Vertical Farm Aspern - Democratization of vertical farming under consideration of parameters of circular economy
Planning, construction and optimization of a vertical farm for urban food production, involving the users in the operational management. The building and the operator concept represent the entire food value chain, from planting to selling.
BIM4BEMS - Building Information Modeling for Building Energy Management Systems
BIM4BEMS explores use cases that represent the usage of building information models (BIM) in combination with building energy management systems (BEMS) during operation. This enables the interaction between BIM and building management systems (BMS) which improves the analysis and visualization of inefficiencies in facilities.
Photonic Cooling – Efficient cooling of buildings through the use of photonic
Within the scope of the project a photonic cooling approach was investigated and evaluated in terms of feasibility and cost efficiency for building applications. In particular cost-efficient photonic surfaces and concepts were investigated which need to have a high reflectivity in of the incident solar radiation (>97%) and a high emission coefficient within the spectral range of 8 – 13 micrometer in order to enable the emission of heat into the sky.
DAKTRis - Dynamic operational behaviour of absorption chillers in Trigeneration Systems
In the present project an absorption chiller will be adapted to meet the specific requirements necessary to integrate it with the CHP unit. By means of hardware-in-the-loop measurements and dynamic system simulations, different system configurations and control strategies will be analysed under dynamic boundary conditions, optimized and evaluated.
ECR Energy City Graz - subproject 2: Framework-Plan Energy City Graz-Reininghaus
Main project-issue is the scientific work and the demonstration of the vision of the energy self-sufficient, CO2-neutral city-district Graz-Reininghaus. The Framework-Plan Energy City Graz-Reininghaus shall stimulate an awareness-raising process towards energy-efficient and sustainable city-development.
Development of a strategy for industrialized serial production of ecological passive houses made out of renewable resources
Development of a strategy for industrialized seria. production of ecological passive solar houses made out of building materials based on renewable resources as foundation for the dissemination of sustainable solutions for the production of prefabricated houses and of single houses.
Reduction of maintenance costs of ventilation systems in plus energy buildings
Maintenance costs for central air ventilation systems are approximately 0,42 Euro/m².a excluding VAT, for decentralized systems 1,16 Euro/m².a excluding VAT. 50% savings in operating costs of apartment passive houses opposed to apartment low-energy buildings [SCH11] can be achieved with maintenance costs of around 0,42 Euro/m².a.
Operational and maintenance costs in passive houses and low energy houses
How much energy does a passive house actually save? Does a passive house pay-off by itself? What are the costs for maintancence? For the first time an approximation for the running costs of a passive house were systematically documented and compared.
smart façade - energy potential of adaptive façade systems
A specially developed simulation model is employed to ascertain the energetic potential of adaptive façade systems. The dynamic behavior of the physical properties of the adaptive façade system reacts to both internal and external changing conditions. The goal was the development of an adaptive façade, which helps provide maximum comfort for the building occupants with minimum energy consumption.
SonnWende+ Efficient solutions for photovoltaic energy management based on block chain technology
The project deals with the analysis of Blockchain technology in the context of renewable electricity producers and flexibility as enabler for innovative service concepts, tested in the innovation-lab “Energie Innovation Cluster Südburgenland”. The goal is to find new and efficient Blockchain-based solutions for services in energy management and trading in a local level.
baubehoerde.at - Development of a Vision 2030 for a Digital Building Authority and Recommendations for Action in Austria
In Austria, planning permission applications are submitted and managed largely manually. The aims of the baubehoerde.at project are to evaluate the potential and limitations of digitizing building approval processes and to create a Vision 2030 strategy for a digital building authority.
Intensified Density - a small scale densification strategy for the suburbs by using modular construction
The project investigated whether a small scale densification strategy for the suburbs / intermediary cities, using modular construction, and existing infrastructure on empty plots of land, can offer a competing alternative to not only the sprawl of single family dwellings but also to large projects.