Project Image Pool

There are 382 results.

Terms of use: The pictures on this site originate from the projects in the frame of the programmes City of Tomorrow, Building of Tomorrow and the IEA Research Cooperation. They may be used credited for non-commercial purposes under the Creative Commons License Attribution-NonCommercial (CC BY-NC).

IEA Bioenergy Task 32 Experts

IEA Bioenergy Task 32 experts visiting the bioenergy research laboratory at the Lucerne University of Applied Sciences in the frame of a task meeting in Switzerland

Task Meeting Seoul/Korea

Group foto of IEA Task 37

Presenter Bochmann

Günther Bochmann presents about industrial application of AD on the conference in Seoul

Visibility and Obervability of distribution grid assets and grid status

One challenge for the use of decentralized flexibility is the current lack of visibility of the systems and the lack of observability in the distribution grid, as well as the lack of real-time information on the topology of the distribution grid itself. These problems make it difficult to verify the actual need for flexibility as well as to validate or measure the flexibility provided.

Data exchange between different stakeholders as a challenge

The energy system data and the data exchange between transmission and distribution system operators, as well as suppliers and aggregators, are currently only sufficient to a limited extent to enable an appropriate provision of flexibility services.

aspern IQ, Paneele Südostfassade

aspern IQ, Paneele Südostfassade

aspern IQ, Gesamtansicht von Westen

aspern IQ, Gesamtansicht von Westen

aspern IQ, Ansicht von Nordwest

aspern IQ, Ansicht von Nordwest

Schiestlhaus

innen

Schiestlhaus

Rückseite

Schiestlhaus

Vogelperspektive

Schiestlhaus

Zentralperspektive

Overview of the ÜVB-VNB project landscape

Overview of the ÜVB-VNB project landscape which provides an overview of the international projects (2014-2024) which were evaluated and used for the report. Also indicated are the projects' respective focus areas

Example of a LinkedIn post for a survey

Example of a LinkedIn post for a survey which was conducted during the initial phase of the project

Speakers at the ISGAN WG6 workshop on flexibility for resilience and stakeholder interaction

Speakers at the ISGAN WG6 workshop on flexibility for resilience and stakeholder interaction, Irina Oleinikova , Martha Symko-Davies, Antonio IIliceto, Barbara Herndler, Mihai Calin

Paradigm shift in the power system

The paradigm shift in the power system and the new challenges for transmission and distribution system operators are presented.

SIRFN-AIT Workshops "Grid-forming converters - testing and validation challenges" - March 2024

International SIRFN experts and participants of the SIRFN-AIT Workshops "Grid-forming converters - testing and validation challenges" visiting the laboratory showcase at the AIT MicroGrid Labor in March 2024.

Validation environment for the SVP EN 50549-10 test scripts at AIT

Illustration of the test setup at AIT that was used to validate the test scripts that were developed within the SIRFN. The setup consists of a real-time simulation system that is connected to the controller board of the AIT Smart grid Converter.

Organisation of the SIRFN network and technical topics in the project period 2021-2023

Overview of the organisation of the SIRFN network: The work programme for Annex 5 approved by the ISGAN Executive Committee (ExCo), the decision-making body within ISGAN, is divided into two sections, one dealing with the dissemination and exchange of knowledge and the other with the implementation of concrete projects for the further development of the research infrastructure.

Background and Motivation for TSO-DSO interaction

The figure indicates the drivers, benefits, and opportunities and challenges for the interaction of distribution and transmission networks.