Suchergebnisse für "Factsheet: Energietechnologien gestalten, die für alle sinnvoll und nutzbar sind"

Haus der Zukunft

Integrated ecological and energy-oriented refurbishment of service buildings - development of quality criteria and tools within a pilot project (LCC-ECO)

Formulation of a procedure for the general refurbishment of service buildings and development of guidelines to support building owners and facility-managers in each stage of the refurbishment process in order to reach an integrated ecological and energy-oriented refurbishment.

Haus der Zukunft

Energy-efficient army barracks

Holistic sanitation concepts for three selected army barracks belonging to the Austrian armed forces to achieve the standard of a low-energy house. An increase in energy efficiency and corresponding models for implementation agreed with large-volume buildings with due consideration to the special conditions prevalent within the Austrian armed forces.

Haus der Zukunft

"gugler! build & print triple zero" - Subproject 8: Leuchtturm gugler – Ökoeffektive Plusenergiedruckerei

On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building had been developed.

Haus der Zukunft

Office Building WKS - Plus Energy Office Building in Ernstbrunn

The new office building (headquarter) of Windkraft Simonsfeld AG in Ernstbrunn (Lower Austria) is planned as a plus energy building. From this excellent starting conditions it is intended to make seven more steps to explore innovative options for energy plus buildings.

Haus der Zukunft

Demonstration building of the eco²building system: First passive house prefabricated wood building system for commercial and industrial buildings

The EU funded "eco2building" construction system in a timber-frame based modular design represents a systematic approach for energy efficient commercial and industrial buildings. The object of the eco²building demonstration project - the logistics centre in passive-house quality for "Eine Welt Handel AG" - in Niklasdorf was to optimize the planning and construction processes and prepare for the market launch of the eco²building construction system. Accompanying research monitored and disseminated the experience.

Haus der Zukunft

"gugler! build & print triple zero" - Subproject 7: Integrated General Planning

The aim of the subproject 7 is to aggregate a "normal" general planning process with innovative additional services. In the spirit of integrated planning in the design a higher number of design parameters must be resolved. This is different to a classic planning process with linear and chronological lined up add ons.

Haus der Zukunft

GreenPlusSchool@urban - Highly efficient facade and roof greening in combination with PV; optimal solution for energy efficiency in overall environmental consideration

In this project, different building-greening systems and plant/substrate types, combined with various PV modules, had been examined on a Viennese school. The influence on the hygrothermal behaviour of the building, energy-saving potential, humidity, shading, noise reduction, water retention and heat island effect are being scientifically explained. The students of the school will also be involved.

Haus der Zukunft

"gugler! build & print triple zero" - subproject 5: Ecoeffective building

On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building will be developed.

Haus der Zukunft

Evaluation of mechanical class room ventilation systems in Austria and generation of a planning guideline

Accumulation of technical solutions and practical experience of schools (kindergarten) with mechanical ventilation systems and identification of how pupils and teachers accept the systems.

Haus der Zukunft

ECR Energy City Graz-Reininghaus: Urban strategies for the new conception, construction, operation and restructuring of an energy self-sufficient city district

The aim is the development of a valid set of specific values and a guideline as a basis for energy self-sufficient district development. Based on the results, a masterplan (energy-network) for the district Graz-Reininghaus shall be developed. Future-oriented "city-building-blocks" will be implemented as flagships of innovation.

Haus der Zukunft

Passive cooling concepts for office and administrative buildings using earth-to-air and earth-to-fluid heat exchangers

Analysis of existing passive cooling concepts, examination of various other passive cooling concepts and a comparison with conventional air conditioning systems. The elaboration of practice-oriented tools for the planning and implementation of the passive cooling concepts selected.

Haus der Zukunft

Multifunctional City Nucleus

Sustainable mixed-use utilization of urban commercial and industrial areas with a specific focus on energy-related aspects.

Haus der Zukunft

Demoobject energy-autarkic solarplant

Within the project at hand a production plant with store house and offices had been constructed. It serves as a reality testing field for long-term measurement of components and systems developed in previous projects. It serves for the demonstration of innovative energy systems and components for the interested public and for experts.

Stadt der Zukunft

Energy2POG - Hybrid Energy Cluster Pogusch - Renewable energies and cost-efficient operation

The aim of the project was the design, optimisation and demonstration of a hybrid energy supply system as well as optimised material flows for a restaurant and hotel business in an exposed location. The concept allows the integration of material flows into the heat and energy supply system.

Haus der Zukunft

"gugler! build & print triple zero" - subproject 6: Integration of the C2C production into the flagship project Gugler

Print and media production at the media and communications company gugler GmbH are currently being optimized according to Cradle to Cradle (C2C) criteria. The goal of this subproject is to allow the demands of a C2C production process optimized for exchange with biological cycles to be included into the general planning of the new production building of the company, a pilot project within the "building of tomorrow" program line.

Haus der Zukunft

Clay - Passiv Office-Building Tattendorf

The motivation for developing the project "Clay Passiv Office-Building Tattendorf" was the dissatisfaction with the situation of a great difference in the state of technology in three fields relevant to the research project: 1) sustainable production of energy , 2) sustainable energy conservation technologies and 3) use of sustainable building materials.

Haus der Zukunft

"gugler! build & print triple zero" - subproject 9: Monitoring Gugler - Monitoring, evaluation, optimization GUGLER

The project objective is the measurement of relevant building values (energy consumption, ...), the evaluation of these values compared with the intended objectives and the optimization of the system based on the measured data. As a special innovation, monitoring the storage of alternatively generated electricity using photovoltaic and wind energy in the form of compressed air must be considered.

Haus der Zukunft

New Communal Centre Ludesch

Community centre with multi-functional usage (cultural events, library, post office, bakery, grocery, daycare, private apartments, meeting point of the generations); role model for consistent implementation of ecological criteria in public tendering; plausible evidence of cost efficiency

Nachhaltig Wirtschaften

"1000 Passivehouses in Austria" - Passive house object databank

The first joint project of the four IG passive house organisations on behalf of the programme line "Building of Tomorrow" - an initiative of the Federal Ministry for Transport, Innovation and Technology - for the purpose of setting up a detailed network documentation of 80% of all passive houses in Austria.

Haus der Zukunft

Energy package Kolpinghaus / Eco-Suite Hotel

The Kolping association’s dormitory for pupils and students has been extended. The energy demand of the newly constructed Eco-Suite Hotel is minimized by use of highly efficient components (such as LED lighting). Locally available energy sources (waste water heat and sunlight) are used and an on-site energy system is being created for the use of the heat energy surplus. Guests at Eco-Suite Hotel can experience life in a plus energy building.