Suchergebnisse für "Factsheet: Energietechnologien gestalten, die für alle sinnvoll und nutzbar sind"

Haus der Zukunft

(energy central 400+) Marketable energy central from 400 kW with innovative, simple electricity conversion for residential building, public utility and commercial objects

Development of a marketable, decentralised "energy central" on a scale from 400 kW for the generation of electricity, heating (and cooling) for residential building, public utility and commercial objects, with a broad variety of applicable fuels on the base of regionally available biogenous residual materials.

Haus der Zukunft

"Building of Tomorrow" in the media

Press support for "Building of Tomorrow"

Haus der Zukunft

Small wind turbines for households and companies

In a practical way the project showed that with optimised small wind turbines a useful potential of wind power can also be generated at different suitable locations with low wind conditions directly at households and companies.

Haus der Zukunft

BIGMODERN Subproject 3: Demonstration building University Innsbruck - Main building of the Faculty for Technical Sciences - Planning process

Demonstration of feasibility of renovation of an official building in high thermal and energetical quality and consideration of further sustainable criteria.

Haus der Zukunft

aspern + Vienna's Urban Lakeside - sustainable urban development

The focal points of the largest urban development project in Europe are the topics public space and microclimate as well as cross-building energy supply. Landmark projects will be implemented in the areas residential buildings, office/industry buildings and mobility.

Haus der Zukunft

BIGMODERN - Subproject 8: Demonstration building Amtshaus Bruck - Realisation

In the frame of the flagship project BIGMODERN the "Amtshaus Bruck an der Mur" had been renovated according to above-average quality standards concerning energy efficiency and sustainability while complying with an industrial management point of view.

Haus der Zukunft

Excursions "Building of Tomorrow live"

Under the project "Building of tomorrow live" over a year long several excursions to "Building of tomorrow" demonstration projects and other passive houses were organised. Sightseeing opportunities were surveyed, updated several times and published on the web.

Haus der Zukunft

Transferproject: Professional strawbale building - "Virtual building-site", exhibition and instruction material

Strawbale-workshops are considered as the best way to inseminate this ecological building-technique. The "virtual building site" has some decisive advantages over the common situation: it does not depend on the weather, allows the comparative study of different constructing methods and can, as a permanent installation, be used as an exhibition.

Stadt der Zukunft

P2PQ - Peer2Peer im Quartier

The research project Peer2Peer im Quartier deals with applications optimizing the selfconsumption of PV-generated energy within urban quarters by enabling peer-to-peer relations among energy prosumers based on Blockchains. Aim is to develop and validate these applications in real operation.

Stadt der Zukunft

Photonic Cooling – Efficient cooling of buildings through the use of photonic

Within the scope of the project a photonic cooling approach was investigated and evaluated in terms of feasibility and cost efficiency for building applications. In particular cost-efficient photonic surfaces and concepts were investigated which need to have a high reflectivity in of the incident solar radiation (>97%) and a high emission coefficient within the spectral range of 8 – 13 micrometer in order to enable the emission of heat into the sky.

Haus der Zukunft

DAKTRis - Dynamic operational behaviour of absorption chillers in Trigeneration Systems

In the present project an absorption chiller will be adapted to meet the specific requirements necessary to integrate it with the CHP unit. By means of hardware-in-the-loop measurements and dynamic system simulations, different system configurations and control strategies will be analysed under dynamic boundary conditions, optimized and evaluated.

Haus der Zukunft

monitorPlus. Monitoring of pilot projects of the Austrian RTD-program Building of Tomorrow Plus

All pilot projects of "Building of Tomorrow Plus" had to be evaluated in a common monitoring project on energy efficiency, user's acceptance, and the integrated building performance. monitorPlus documented and assessed the results of this evaluation.

Stadt der Zukunft

Vertical Farm Aspern - Democratization of vertical farming under consideration of parameters of circular economy

Planning, construction and optimization of a vertical farm for urban food production, involving the users in the operational management. The building and the operator concept represent the entire food value chain, from planting to selling.

Stadt der Zukunft

Future quarter 2.0 - Replicable, thermally and electrically grid-supportive conception of (positive energy) districts in a dense urban context

Development of a replicable concept for grid-supportive integration of innovative (positive energy) district with high on-site energy supply into the existing network infrastructure (electricity and district heating network).

Stadt der Zukunft

BIM4BEMS - Building Information Modeling for Building Energy Management Systems

BIM4BEMS explores use cases that represent the usage of building information models (BIM) in combination with building energy management systems (BEMS) during operation. This enables the interaction between BIM and building management systems (BMS) which improves the analysis and visualization of inefficiencies in facilities.

Haus der Zukunft

BIGMODERN - Subproject 10: Evaluation, Documentation and Ensuring Transferability

The subproject 10 is part of the flagship project BIGMODERN. It is based on the results of subproject SP 7 in which a monitoring concept has been developed. This concept is now implemented through monitoring of different aspects occurring during the first two years of operation of both BIGMODERN demonstration buildings.

Haus der Zukunft

"gugler! build & print triple zero" - subproject 1: lead project management

The lead project management provides furthermore for sufficient interlinking between the project partners by monthly, by requirement weekly project workshops. Besides the leading project management represents the project gugler to the outward and takes part in workshops of the program management

Haus der Zukunft

BIGMODERN - Subproject 11: Dissemination of project results

The project is part of the flagship project BIGMODERN. It aims at disseminating all relevant results of BIGMODERN in a comprehensive and targeted way. It addresses different target groups, such as decision makers inside the BIG Bundesimmobiliengesellschaft, various users of federal buildings and other real estate companies nationally and internationally.

Haus der Zukunft

Monitoring Sunhouse Eferding

In course of the monitoring project the effectiveness of the energy-technical system was checked on the basis of running measuring data. The data were evaluated and, if required, the arrangements and settings of the control system were adapted. Main result is that the energy balance could have been improved explicitly whilst the monitoring process.

Haus der Zukunft

Serial refurbishment for buildings in timber construction

Refurbishment of single- and two-familiy houses in timber construction in Austria has a large CO2-saving potential. To meet the special requirements for the refurbishment of timber constructions, a concept for the renovation to passive house respectively plus-energy house standard with special focus on ecologic construction materials was developed in this project.