Suchergebnisse für "Factsheet: Energietechnologien gestalten, die für alle sinnvoll und nutzbar sind"
old house? old house!
![](/includes/images/pdf-placeholder.png)
The renovation and restructuring of existing housing stock using modern, ecologically efficient building technology as a means for developing Assisted Living Centres for senior citizens within an urban context
Development of a new generation of grid-connected PV inverters
Improvement of operational parameters (efficiency, quality of current waveform, reduced size and weight) and reduction of manufacturing costs
monitorPlus. Monitoring of pilot projects of the Austrian RTD-program Building of Tomorrow Plus
All pilot projects of "Building of Tomorrow Plus" had to be evaluated in a common monitoring project on energy efficiency, user's acceptance, and the integrated building performance. monitorPlus documented and assessed the results of this evaluation.
Monitoring Sunhouse Eferding
In course of the monitoring project the effectiveness of the energy-technical system was checked on the basis of running measuring data. The data were evaluated and, if required, the arrangements and settings of the control system were adapted. Main result is that the energy balance could have been improved explicitly whilst the monitoring process.
Serial refurbishment for buildings in timber construction
Refurbishment of single- and two-familiy houses in timber construction in Austria has a large CO2-saving potential. To meet the special requirements for the refurbishment of timber constructions, a concept for the renovation to passive house respectively plus-energy house standard with special focus on ecologic construction materials was developed in this project.
Sunny Energy Building: ENERGYbase - Office building of tomorrow
Energybase is a showcase project in terms of energy efficiency and use of renewable energies realized by the Vienna business agency. With 7.500 sqm net floor area ENERGYbase provides space for innovative business and research and development on the field of green energy.
BIGMODERN - Subproject 6: Incentives to enforce energy efficiency and sustainability in modernizations of BIG-buildings
Development of approaches, which lead to general conditions for complete refurbishments in BIG-buildings, which support high standards regarding energy efficiency and sustainability. This will ensure high-quality modernizations for BIG's real estate.
Vertical Farm Aspern - Democratization of vertical farming under consideration of parameters of circular economy
Planning, construction and optimization of a vertical farm for urban food production, involving the users in the operational management. The building and the operator concept represent the entire food value chain, from planting to selling.
Future quarter 2.0 - Replicable, thermally and electrically grid-supportive conception of (positive energy) districts in a dense urban context
Development of a replicable concept for grid-supportive integration of innovative (positive energy) district with high on-site energy supply into the existing network infrastructure (electricity and district heating network).
BIM4BEMS - Building Information Modeling for Building Energy Management Systems
BIM4BEMS explores use cases that represent the usage of building information models (BIM) in combination with building energy management systems (BEMS) during operation. This enables the interaction between BIM and building management systems (BMS) which improves the analysis and visualization of inefficiencies in facilities.
BIGMODERN - Subproject 10: Evaluation, Documentation and Ensuring Transferability
The subproject 10 is part of the flagship project BIGMODERN. It is based on the results of subproject SP 7 in which a monitoring concept has been developed. This concept is now implemented through monitoring of different aspects occurring during the first two years of operation of both BIGMODERN demonstration buildings.
"gugler! build & print triple zero" - subproject 1: lead project management
The lead project management provides furthermore for sufficient interlinking between the project partners by monthly, by requirement weekly project workshops. Besides the leading project management represents the project gugler to the outward and takes part in workshops of the program management
BIGMODERN - Subproject 11: Dissemination of project results
The project is part of the flagship project BIGMODERN. It aims at disseminating all relevant results of BIGMODERN in a comprehensive and targeted way. It addresses different target groups, such as decision makers inside the BIG Bundesimmobiliengesellschaft, various users of federal buildings and other real estate companies nationally and internationally.
Einfach:wohnen, Phase Construction
![](/includes/images/pdf-placeholder.png)
Support for the erection of the demonstrative housing project consisting of 7 houses (5 Low energy houses, 1 passive house and 1 "next to passive house")
HY3GEN - A Regenerative Building
The "third generation hybrid building" (HY3GEN), whose main features are being defined in this project, has expanded this approach to include the integration of aspects of efficient resource utilization in construction and operation as well as the use of regenerative raw materials and renewable energy.
S I P settlement models in passive house quality
Research, development and realization of integral building concepts in passive house quality!
1000 passive houses in Austria - 3rd documentation period 2006 - 2008
3rd documentation period of the joint project of IG Passivhaus Österreich to set up a detailed network documentation on a representative cross-section of all passive houses in Austria.
Urban consolidation Lehen
The key project "Stadtumbau Lehen" ("urban consolidation Lehen") coordinates several projects at the urban district of Lehen, with the purpose of the raise in energy efficiency and safekeeping of a sustainable development. Four builder (ten teams of architects), two scientifically institutions, the town of Salzburg and two attended departments of the land are working together.
Analysis of the high-quality wooden facade in extreme climates
The project "Alpine base Schiestlhaus on the Hochschwab, which was opened in 2005, represents a lighthouse project for the "House of the Future" programme as the 1st shelter in zero-energy house quality. After more than 15 years in operation, however, damages came to light. Within the framework of this project, analysis activities were carried out on the cause of damage as well as the development of new facade structures.
Operational and maintenance costs in passive houses and low energy houses
How much energy does a passive house actually save? Does a passive house pay-off by itself? What are the costs for maintancence? For the first time an approximation for the running costs of a passive house were systematically documented and compared.