Search results
There are 72 results.
"gugler! build & print triple zero" - Subproject 7: Integrated General Planning
The aim of the subproject 7 is to aggregate a "normal" general planning process with innovative additional services. In the spirit of integrated planning in the design a higher number of design parameters must be resolved. This is different to a classic planning process with linear and chronological lined up add ons.
"gugler! build & print triple zero" - Subproject 8: Leuchtturm gugler – Ökoeffektive Plusenergiedruckerei
On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building had been developed.
"gugler! build & print triple zero" - subproject 1: lead project management
The lead project management provides furthermore for sufficient interlinking between the project partners by monthly, by requirement weekly project workshops. Besides the leading project management represents the project gugler to the outward and takes part in workshops of the program management
"gugler! build & print triple zero" - subproject 3: recyclable constructing
Development of basic principles and proposals for highly recyclable constructions. A catalogue with main principles of recyclable designing with a particular focus on material inherent bonding and joint techniques as well as a selection of constructions including ecological benchmarks, calculation of building physics plus costs was created.
"gugler! build & print triple zero" - subproject 4: energy concept Gugler
The energy concept led Gugler in frame of the conversion and expansion of the company towards plus-energy standard. Significant measures ware a consequent maximum reduction of the energy demand, optimal utilisation of industrial waste-heat, maximum consumption of on-site energy sources, integrated energy production, ecologic load management with comprehensive response- and storage-techniques.
"gugler! build & print triple zero" - subproject 5: Ecoeffective building
On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building will be developed.
"gugler! build & print triple zero" - subproject 9: Monitoring Gugler - Monitoring, evaluation, optimization GUGLER
The project objective is the measurement of relevant building values (energy consumption, ...), the evaluation of these values compared with the intended objectives and the optimization of the system based on the measured data. As a special innovation, monitoring the storage of alternatively generated electricity using photovoltaic and wind energy in the form of compressed air must be considered.
6D BIM-Terminal: Missing Link for the development of CO2 neutral buildings
The present project aims to close the gap between specialist consultants and Building Information Modeling (BIM) applications. For that, relevant data for cost estimation, scheduling construction planning and management or sustainable building operation and facility management, shall be added automatically to BIM elements and imported into the respective specialist planning software. This data exchange shall be carried out using IFC interface according to ÖNORM A6241-2 and the properties of the ASI properties server via a central platform, the "6D BIM-Terminal".
Analysis of the high-quality wooden facade in extreme climates
The project "Alpine base Schiestlhaus on the Hochschwab, which was opened in 2005, represents a lighthouse project for the "House of the Future" programme as the 1st shelter in zero-energy house quality. After more than 15 years in operation, however, damages came to light. Within the framework of this project, analysis activities were carried out on the cause of damage as well as the development of new facade structures.
ArcheNEO - an energy-autonomous office park in Kitzbühel
ArcheNEO is a highly energy efficient office park, that produces more energy than it needs. It features an integrated energy concept that saves energy, uses renewable energies in combination with electric mobility and batteries as electricity storage and manages energy and was planned and built in Kitzbühel Oberndorf. The demonstration object will be multiplied and exported.
Architectural Concept for Musicians
Starting from the special needs of a specific user group, an Architectural Concept for Musicians will be proposed and realized, with Housing as principal functional usage.
BIMSavesEnergy - BIM-based planning-methods for the assurance of energy-efficiency in the building process
The Building Information Model (BIM) brings about fundamental changes in the planning and construction of buildings, as the common base makes it possible to work closely together across disciplines in construction projects. In this project, BIM-based planning methods were developed, which make the influence of planning decisions on energy efficiency quantifiable and controllable in the management process.
BONSEI! Optimal use of existing buildings – energy efficient implementation of renovation!
The project BONSEI! would like to support an energy efficient and socially acceptable densification of privately owned residential buildings in urban space and to develop a methodological basis for resource efficient urban areas. The results are used for the conception of an innovative service in order to provide a neutral consulting regarding private densification plans.
Beacon of innovation gugler cross media, ecoeffective zero energy cross media enterprise featuring zero-emission, zero energy, zero waste
The aim of the flagship project is a new dimension of sustainability (cradle to cradle, ecoeffective zero energy enterprise) for business operation and building, which means zero emission, zero energy, zero waste. This will be shown on the basis of a beacon of innovation: Gugler GmbH, a modern sustainable media services enterprise (traditional print and new media) will extend their current building from about 2100 square meters and about 90 employees to about 5,000 square meters.
Biotope City - construction manual for the green city of the future
"Biotope City" is an overall concept for the implementation of comprehensive urban greening with the aim of using the regenerative mechanisms of nature. With this approach, quality of life is to be comprehensively, sustainably and cost-effectively increased and resilience against extreme weather events in cities will be improved. The project aims to generate realistic components of a "construction manual" for the green city of the future, which are generalizable and transferable.
Building of Tomorrow for the construction industry
Dissemination of results of the research initiative "Building of tomorrow" for two specific target groups - master builder and installer - implementation in further vocational training concepts
Clay - Passiv Office-Building Tattendorf
The motivation for developing the project "Clay Passiv Office-Building Tattendorf" was the dissatisfaction with the situation of a great difference in the state of technology in three fields relevant to the research project: 1) sustainable production of energy , 2) sustainable energy conservation technologies and 3) use of sustainable building materials.
Comparative analysis and evaluation of innovative building concept models in terms of key ecological and economic figures during life cycle of individual building concepts
The aim of this research project was to subject a number of building concept models to a comprehensive comparative analysis and evaluation in terms of key ecological and economic figures.
Competition for prefabricated house producers to design types of attached houses
A competition for the builders of prefabricated houses provided new design-types of attached houses. The results have been awarded and published to encourage the participants to enter this segment of the market.
Connection of innovative strategies and technologies to a holistic, resources-friendly plus energy building (FUTUREbase)
On the basis of a construction project in Giefinggasse 4 in Vienna the combination of new, innovative strategies and technologies to an integrated, resources conserving plus energy building with high signaling and multiplication effect had been tested for feasibility. A regional, energetical bond between the buildings TECHbase, ENERGYbase and the Klima-Windkanal had been developed.