Suchergebnisse für "Factsheet: Energietechnologien gestalten, die für alle sinnvoll und nutzbar sind"

Haus der Zukunft

Pilot project gaining-building-land Pongau

Gaining extra space for additional households through sustainable renovation and/or extension of 8 detached houses by integrating consulting, planning, energy efficiency concepts and financing.

Haus der Zukunft

BIGMODERN - Subproject 5: Feasibility studies about innovative technical solutions

The application of innovative technologies means additional planning and coordination effort which usually cannot be incorporated into the conventional planning processes of the BIG. To overcome these barriers for the application of innovative technologies, the sub project at hand aims at preparing information, feasibility studies, planning records, experiences and practical examples in a way, that they can be implemented directly into the planning process.

Stadt der Zukunft

EnerPHit-green concept Modernisation of a historic building with application of an aerogel insulation plaster

This demonstration project shows the comprehensive modernization of a historic building within the constraints of a regional protection zone. By using the Aerogel high-performance insulating plaster, a comprehensive energy-efficient building refurbishment had been realized without changing the outer appearance of the façade.

Haus der Zukunft

BIGMODERN - Subproject 2: Demonstration project of an official building in Bruck

In the frame of this subproject being part of the flagship project BIGMODERN, a decision matrix as well as a handbook for planning, including feasibility analysis and a collection of information, serving as decision guidance for planning and implementation of sustainable building refurbishment, is being developed. In this way, the risk for planners and builders of the usage of new sustainable technologies shall be minimised.

Haus der Zukunft

RENEW SCHOOL Austria: Examples and financing models for school renovations

The project aimed at learning from 14 Austrian school buildings, from their financial and cooperation models, meaning successful cooperation between involved parties. The success factors have been derived from these projects and together with 10 best practice schools been published in a brochure. The project supported the Austrian activities in the IEE EU-Projekt RENEW SCHOOL (www.renew-school.eu).

Haus der Zukunft

Plus energy office building - Subproject 3: Austria's biggest plus energy office building

In course of the refurbishment of the Vienna University of Technology (Univercity 2015) Austria´s biggest plus energy office building is going to be built. This project intends to demonstrate not only the technical but furthermore the economical feasibility of plus energy office buildings. Within this building the plus energy concept is fulfilled by optimizing the power consumption of the whole building and the installation of Austria´s largest facade integrated photovoltaic plant.

Haus der Zukunft

Refurbishment of an existing villa of the "Gründerzeit" to passive house standard with passive and active solar use

The project shows in an exemplary way how buildings of the time of "Gründerzeit" could be maintained and could offer a better environmental balance including the view of the village and the traffic than a new building. As an example a villa has been converted into a multi-family house within a larger housing project.

Haus der Zukunft

e80^3-Buildings - Sub project 4: Demonstration object

Alongside the realisation of the plus energy building in Kapfenberg, a demonstration project is scheduled to be created that accomplishes an economically viable and technically innovative solution for the future.

Haus der Zukunft

BIGMODERN Subproject 7: Monitoring concept

Development of a pattern for comprehensive documentation of the project results. The concepts contain amongst others monitoring of energy consumption, resources, costs, functionality and comfort, etc.

Haus der Zukunft

Kierling passive house - heading into the future sustainably

Using the example of demonstrational renovation, Kierling (built between 1977 and 1979) tests the possibilities of a renovation in passive house standard in technical, organizational and financial terms as an outstanding example of a comprehensive renovation.

Haus der Zukunft

e80^3-Buildings - "reconstruction concepts towards energy plus house standard with prefabricated active roof and facade elements, integrated home automation and network integration"

The project aims for highly-efficient renovation of existing buildings and settlements in urban areas. The main focus are buildings that were built between 1950 and 1980.

Haus der Zukunft

BIGMODERN - Subproject 8: Demonstration building Amtshaus Bruck - Realisation

In the frame of the flagship project BIGMODERN the "Amtshaus Bruck an der Mur" had been renovated according to above-average quality standards concerning energy efficiency and sustainability while complying with an industrial management point of view.

Haus der Zukunft

BIGMODERN Subproject 3: Demonstration building University Innsbruck - Main building of the Faculty for Technical Sciences - Planning process

Demonstration of feasibility of renovation of an official building in high thermal and energetical quality and consideration of further sustainable criteria.

Haus der Zukunft

Urban consolidation Lehen

The key project "Stadtumbau Lehen" ("urban consolidation Lehen") coordinates several projects at the urban district of Lehen, with the purpose of the raise in energy efficiency and safekeeping of a sustainable development. Four builder (ten teams of architects), two scientifically institutions, the town of Salzburg and two attended departments of the land are working together.

Haus der Zukunft

Serial refurbishment for buildings in timber construction

Refurbishment of single- and two-familiy houses in timber construction in Austria has a large CO2-saving potential. To meet the special requirements for the refurbishment of timber constructions, a concept for the renovation to passive house respectively plus-energy house standard with special focus on ecologic construction materials was developed in this project.

Haus der Zukunft

BIGMODERN - Subproject 6: Incentives to enforce energy efficiency and sustainability in moderniza­tions of BIG-buildings

Development of approaches, which lead to general conditions for complete refurbishments in BIG-buildings, which support high standards regarding energy efficiency and sustainability. This will ensure high-quality modernizations for BIG's real estate.

Haus der Zukunft

BIGMODERN - Subproject 11: Dissemination of project results

The project is part of the flagship project BIGMODERN. It aims at disseminating all relevant results of BIGMODERN in a comprehensive and targeted way. It addresses different target groups, such as decision makers inside the BIG Bundesimmobiliengesellschaft, various users of federal buildings and other real estate companies nationally and internationally.

Haus der Zukunft

BIGMODERN - Subproject 10: Evaluation, Documentation and Ensuring Transferability

The subproject 10 is part of the flagship project BIGMODERN. It is based on the results of subproject SP 7 in which a monitoring concept has been developed. This concept is now implemented through monitoring of different aspects occurring during the first two years of operation of both BIGMODERN demonstration buildings.

Stadt der Zukunft

SPACE4free - Retrofitting souterrain areas in 19th century townhouses to apartments with high quality of life and low energy consumption

Planning of durable and damage-free apartments with high quality of life and low energy consumption in moisture exposed souterrain areas of 19th century townhouses. Using innovative ventilation control systems comfortable room climate will be created. Additionally the tolerance of different types of use is ensured. A planning tool enables the scaling of the findings and thus the applicability to various planning situations.

Stadt der Zukunft

Intensified Density - a small scale densification strategy for the suburbs by using modular construction

The project investigated whether a small scale densification strategy for the suburbs / intermediary cities, using modular construction, and existing infrastructure on empty plots of land, can offer a competing alternative to not only the sprawl of single family dwellings but also to large projects.