Suchergebnisse
ChristophorusHouse(CHH)

Multifunctional building in passive house standard - The building was designed as innovative high-quality passive house (wood construction) with the latest ecological building automation as a pilot project which is multipliable in a reduced respectively altered form in Europe as well as overseas.
First rehabilitation project of a public building to reach passive-house standard

General rehabilitation of the General Secondary School II and the Poytechnic School at Schwanenstadt (Upper Austria) using prefabricated timber wall elements and a newly developed ventilation system optimised for schools
BIGMODERN - Subproject 10: Evaluation, Documentation and Ensuring Transferability
The subproject 10 is part of the flagship project BIGMODERN. It is based on the results of subproject SP 7 in which a monitoring concept has been developed. This concept is now implemented through monitoring of different aspects occurring during the first two years of operation of both BIGMODERN demonstration buildings.
ProKlim+ - Use of Model Predictive Control to optimize solar power consumption in case of increased energy efficiency.
Using weather forecast for building automation can help improving the energy efficiency of buildings and, thus, saving energy. In the project ProKlim+ the forecast of solar radiation will be used to optimize the building automation to satisfy the needs of the building users, and at the same time to minimize the energy demand on the one hand and to maximize the consumption of self-produced energy on the other hand.
Demonstration project LifeCycle Tower - batch-produced energy efficient timber/hybrid high-rise building system
The energy efficient building concept shall be tested with regard to its functional efficiency and real usage conditions. The demonstration project is based upon the results of previous research activities and shall be presented to a wider public. It shall illustrate the advantages of a batch-produced timber/hybrid high-rise building system which offers high quality of energy and resource efficiency.
BIGMODERN - Subproject 5: Feasibility studies about innovative technical solutions
The application of innovative technologies means additional planning and coordination effort which usually cannot be incorporated into the conventional planning processes of the BIG. To overcome these barriers for the application of innovative technologies, the sub project at hand aims at preparing information, feasibility studies, planning records, experiences and practical examples in a way, that they can be implemented directly into the planning process.
First energy autonomous revitalization of an urban former industry quarter with the standard type of "Passive House" to reduce primary energy max. 100 kWh/m2 NFL
A renovation with the energy efficient factor 10+ of a former industry quarter in the standard type of passive house with usage of the most modern technologies and locally renewable energy resources.
"gugler! build & print triple zero" - subproject 9: Monitoring Gugler - Monitoring, evaluation, optimization GUGLER
The project objective is the measurement of relevant building values (energy consumption, ...), the evaluation of these values compared with the intended objectives and the optimization of the system based on the measured data. As a special innovation, monitoring the storage of alternatively generated electricity using photovoltaic and wind energy in the form of compressed air must be considered.
CIT City in Transition - A Model for Comprehensive Renewal Processes to Increase the Value of Urban Areas

By means of pilot projects in two urban areas comprehensive goals and criteria, assessment approaches and a code of practice for sustainable urban renewal are elaborated jointly with decision makers and experts in urban development.
SOL4 business and training center Eichkogel

Demonstration project for sustainable construction of a working and living environment
Reconstruction ecological Freihof Sulz

integral reconstruction of the valuable cultural heritage "Freihof Sulz" to a communication- and action centre; Demonstration project for local culture and life quality, old building techniques, energy saving and ecological reconstruction."
Energy-efficient army barracks

Holistic sanitation concepts for three selected army barracks belonging to the Austrian armed forces to achieve the standard of a low-energy house. An increase in energy efficiency and corresponding models for implementation agreed with large-volume buildings with due consideration to the special conditions prevalent within the Austrian armed forces.
BIGMODERN Subproject 3: Demonstration building University Innsbruck - Main building of the Faculty for Technical Sciences - Planning process
Demonstration of feasibility of renovation of an official building in high thermal and energetical quality and consideration of further sustainable criteria.
Strategy development for (technical / economical feasibility of) energy autarcic buildings
Development of a strategy for energy autarcic buildings with appropriate Technology solutions.
Demoobject energy-autarkic solarplant
Within the project at hand a production plant with store house and offices had been constructed. It serves as a reality testing field for long-term measurement of components and systems developed in previous projects. It serves for the demonstration of innovative energy systems and components for the interested public and for experts.
solar4.alpine
solar4.alpine - an integrated concept for an ecological alpine refuge hut based on solar energy
SchulRen+ Innovative plus-energy refurbishment concepts for school buildings
In a technical feasibility study and based on a real example, the project analysed innovative plus-energy refurbishment concepts for school buildings. The goal was to develop refurbishment concepts with a high replication potential which combine future-oriented energy concepts with feasible technical and architectural solutions.
Passive cooling concepts for office and administrative buildings using earth-to-air and earth-to-fluid heat exchangers

Analysis of existing passive cooling concepts, examination of various other passive cooling concepts and a comparison with conventional air conditioning systems. The elaboration of practice-oriented tools for the planning and implementation of the passive cooling concepts selected.
Rebuilding of the organic farm Achleitner, straw & clay - room climatisation with plants

Rebuilding of a marketing-, store- and processingcenter with an organic freshmart and an organic restaurant in passivhouse quality. Application of regional building materials, an innovatve overall energyconcept, climatisation with plants.
"gugler! build & print triple zero" - subproject 6: Integration of the C2C production into the flagship project Gugler
Print and media production at the media and communications company gugler GmbH are currently being optimized according to Cradle to Cradle (C2C) criteria. The goal of this subproject is to allow the demands of a C2C production process optimized for exchange with biological cycles to be included into the general planning of the new production building of the company, a pilot project within the "building of tomorrow" program line.