Suchergebnisse für "Factsheet: Energietechnologien gestalten, die für alle sinnvoll und nutzbar sind"
Platform for Energy-Efficient Hospitals - ways to a higher energy-efficiency
The present project is based on the results of the project "The energy-efficient hospital: realistic departure points and identification of possible measures"
BIGMODERN - Sustainable refurbishment standards of federal buildings constructed between 1950 and 1980
The project aims at developing sustainability and climate protection criteria for the refurbishment of federal buildings of the postwar period. These criteria will be tested for their practical suitability within the framework of demonstration projects. Subsequently, these criteria will be defined as fundamental guiding principles in the planning and building processes for all future BIG retrofit projects.
Hygrothermal behaviour of double-skin facades in solar irradiation - theory evaluation by means of on-location measurements
Detailed clarification of the base parameters of thermodynamic simulation calculations by means of on-location measurements on the five-storey double-skin facade of the Federal Institute of Social Education in Baden bei Wien
Energy Efficiency and Risk Management in Public Buildings (EnRiMa)
The major objective of the project EnRiMa was to develop an internet based decision-support system (DSS) to enable operators of public buildings to increase the system efficiency as well as to reduce the CO2 emissions. The DSS can be linked to existing energy management systems as DESIGOTM. The University of Applied Science Burgenland, Campus Pinkafeld, and ENERGYbase, Vienna, have been used to test and calibrate the EnRiMa DSS.
PH Office - Criterions for energy-efficient office buildings
The passive house standard and energy-efficient building technologies are getting increasingly important for office buildings, too. However, standardisation is not completed on the same level as known from the residential building sector. The project at hand brings in definitions and makes a suggestion on a standardised calculation method for office buildings in passive house quality.
Integrated ecological and energy-oriented refurbishment of service buildings - development of quality criteria and tools within a pilot project (LCC-ECO)
Formulation of a procedure for the general refurbishment of service buildings and development of guidelines to support building owners and facility-managers in each stage of the refurbishment process in order to reach an integrated ecological and energy-oriented refurbishment.
Energy-efficient army barracks
Holistic sanitation concepts for three selected army barracks belonging to the Austrian armed forces to achieve the standard of a low-energy house. An increase in energy efficiency and corresponding models for implementation agreed with large-volume buildings with due consideration to the special conditions prevalent within the Austrian armed forces.
"gugler! build & print triple zero" - Subproject 8: Leuchtturm gugler – Ökoeffektive Plusenergiedruckerei
On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building had been developed.
Office Building WKS - Plus Energy Office Building in Ernstbrunn
The new office building (headquarter) of Windkraft Simonsfeld AG in Ernstbrunn (Lower Austria) is planned as a plus energy building. From this excellent starting conditions it is intended to make seven more steps to explore innovative options for energy plus buildings.
Offices in times of climate change
Study about the impact of climate change on the thermal comfort in office buildings. Special attention is paid to the users´ behaviour. Basic information for the development of detailed strategies for adjustments by the real estate industry and by politics, who are actively involved into the project by participating in start and result workshops.
Demonstration building of the eco²building system: First passive house prefabricated wood building system for commercial and industrial buildings
The EU funded "eco2building" construction system in a timber-frame based modular design represents a systematic approach for energy efficient commercial and industrial buildings. The object of the eco²building demonstration project - the logistics centre in passive-house quality for "Eine Welt Handel AG" - in Niklasdorf was to optimize the planning and construction processes and prepare for the market launch of the eco²building construction system. Accompanying research monitored and disseminated the experience.
"gugler! build & print triple zero" - Subproject 7: Integrated General Planning
The aim of the subproject 7 is to aggregate a "normal" general planning process with innovative additional services. In the spirit of integrated planning in the design a higher number of design parameters must be resolved. This is different to a classic planning process with linear and chronological lined up add ons.
GreenPlusSchool@urban - Highly efficient facade and roof greening in combination with PV; optimal solution for energy efficiency in overall environmental consideration
In this project, different building-greening systems and plant/substrate types, combined with various PV modules, had been examined on a Viennese school. The influence on the hygrothermal behaviour of the building, energy-saving potential, humidity, shading, noise reduction, water retention and heat island effect are being scientifically explained. The students of the school will also be involved.
"gugler! build & print triple zero" - subproject 5: Ecoeffective building
On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building will be developed.
Evaluation of mechanical class room ventilation systems in Austria and generation of a planning guideline
Accumulation of technical solutions and practical experience of schools (kindergarten) with mechanical ventilation systems and identification of how pupils and teachers accept the systems.
ECR Energy City Graz-Reininghaus: Urban strategies for the new conception, construction, operation and restructuring of an energy self-sufficient city district
The aim is the development of a valid set of specific values and a guideline as a basis for energy self-sufficient district development. Based on the results, a masterplan (energy-network) for the district Graz-Reininghaus shall be developed. Future-oriented "city-building-blocks" will be implemented as flagships of innovation.
Passive cooling concepts for office and administrative buildings using earth-to-air and earth-to-fluid heat exchangers
Analysis of existing passive cooling concepts, examination of various other passive cooling concepts and a comparison with conventional air conditioning systems. The elaboration of practice-oriented tools for the planning and implementation of the passive cooling concepts selected.
Multifunctional City Nucleus
Sustainable mixed-use utilization of urban commercial and industrial areas with a specific focus on energy-related aspects.
Demoobject energy-autarkic solarplant
Within the project at hand a production plant with store house and offices had been constructed. It serves as a reality testing field for long-term measurement of components and systems developed in previous projects. It serves for the demonstration of innovative energy systems and components for the interested public and for experts.
Energy2POG - Hybrid Energy Cluster Pogusch - Renewable energies and cost-efficient operation
The aim of the project was the design, optimisation and demonstration of a hybrid energy supply system as well as optimised material flows for a restaurant and hotel business in an exposed location. The concept allows the integration of material flows into the heat and energy supply system.