Search results
There are 922 results.
THECLA
THERM-opti-BALCONY-P2 - Thermal Optimized Renovation of Balconies Phase 2: In-Situ-Pilot-Station
Pre-cast cantilever balconies represent a particular problem in the case of thermal rehabilitation of buildings. With the THERM-opti-BALKON-System a solution is currently being investigated under laboratory conditions. Phase 2 aims to create an in-situ-pilot-station. The most important object of study is the long-term behavior of the THERM-opti-BALKON-System.
THERM-opti-BALCONY: Thermal Optimized Renovation of Balconies
Pre-cast cantilever balconies represent a particular problem in the thermal renovation of buildings. The central goal of this project is the development of practical and cost-effective mounting solutions for the thermally decoupled reconstruction of balconies on building frontages and achieving a significant increase in the energy performance of the thermal renovation measure.
TRADEMARKFarb&Stoff
From an idea to a trade product ready for marketing: Plant dyes for the textile industry.
TRIGOS - CSR pays!
The project analysed selected TRIGOS projects and organisations and further developed assessment approaches for sustainable management accounting and corporate social responsibility. TRIGOS is an award scheme for organisations who combine economic performance with social and environmental responsibility.
TWIN - Digital twins for sustainable buildings
Digital building twins have hardly been used in practice due to an often unfavourable cost-benefit ratio. The aim of the TWIN project is to bring together use cases of digital building twins with a high ecological and economic impact in order to prepare application scenarios with great implementation potential.
Technological as well as economical optimized Biomass CHP systems with regard to state-of-the-art technologies.
Analysis and presentation of representative biomass CHP systems with an electric power output of less than 2 MW. Variation of parameters and identification of potential optimized interactions between specific units. Identification of the economically and thermodynamically most optimized interconnection based on state-of-the-art technologies.
Technology Platform Photovoltaic Austria
Between research institutions and the economic system the way has been paved to initiate joint R&D projects. Common research activities have been initiated and intensified to be able to position local companies in international niche markets for photovoltaics.
Test stand method for the determination of system efficiency and emission factors of small-scale biomass combustion systems
Determination of key data with practical relevance of typical applications in only one test run. Monitoring of air pollutants and efficiency and continuous improvement of technology possible with test stand method.
The Box - Thermal High Performance Decoupling - Next Generation Thermal Break Technology
The project pursues the overall strategic objective "solution of the problem-inducing heat bridge". For this purpose, the thermal bridging losses should be reduced by the factor of 15 in contrast to the state of the art. The significant increase in efficiency should rely on existing system solutions, but incorporating a new holistic view in terms of construction, geometry and materials.
The Green Parking Space – Utilization of urban parking areas for production of biomass
Many traffic areas in urban environments are actually used as such only a small fraction of the time. Subject of this project was to investigate the possibility of using those areas by additional integration of photobioreactors for the production of biomass, integrating such systems to the maximum extent into the urban substance and energy cycles.
The Paper Factory in the Year 2030
Paper factory in the year 2030 as an integrated part of a sustainable economy and a supplier of sustainable paper products fulfilling criteria for sustainability at highest possible level.
The Passive House Catalogue of Building details for renovations
"Building of Tomorrow" funded research reports dealing with building renovation will be analysed for solutions of construction details. This information will be supplemented with structural-physical descriptions, ecological ratings and technical discussions. All the information will be collected and systematically presented in a catalogue of building details for renovation.
The Sahel Project
Silicate technology for the improvement of water uptake and nutrient storage in marginal soils; field tests in the northern Sahel region in Senegal
The Sustainable Hospital
Working together with practitioners scientists from the fields of social ecology, sociology of health and economics introduce the concept of sustainable development into a pilot hospital. The feasibility study establishes the base for ecological, social and economic improvements within the hospital.
The Use of wind energy in skiing regions - Evaluation of the consume of electricity and dissemination of the results of the analysis
Main goals of the project are the analysis of the location Salzstiegl concerning the coverage of their own electricity needs with an already existent windmill as well as a following dissemination of the outcome of the analysis in form of a workshop for all ski lift carriers of Austria.
The development of fused wood-only parquet elements
The development of the wood fusing technology to an innovative, ecological process of production of wood-only parquet elements, which do not contain any wood foreign substances as glue or thermoplastics.
ThermSat - pilot training program "Thermal renovation engineer in construction industry"
The goal was to design, offer, evaluate and refine a practical training, adapted to the current development. Aim of the courses is to have well-trained engineers and technicians with practical and theoretical knowledge in the field of thermal renovation of buildings.
Thermal detection of cracks on glowing wire during the process of rolling with regard to reduction of rejections
Developing a non-destructive and fully automated testing to detect surface cracks and laps in rolled wires during the production at temperature values of 800-1000°C and at a material speed of 30-40 m/s, with regard to reduction of rejections.
Thermo-Active Building Systems - Development of a Calculation kernel (TBA-CALC )
This project result will provide Austria with a uniform software environment for the simulation of thermo-active building systems in the form of a validated tool.