Suchergebnisse
BIGMODERN Subproject 7: Monitoring concept
Development of a pattern for comprehensive documentation of the project results. The concepts contain amongst others monitoring of energy consumption, resources, costs, functionality and comfort, etc.
Urban consolidation Lehen - Subproject 2: Development - intelligent E-Monitoring
In the oppositional subproject 2 technical and organisational requirements for the transformation of the innovative Smart Metering-concept will be developed. Through the connection of the application of Smart Metering with an active integration of the inhabitants over mutual communication the concept, which is planned for the key project Urban Consolidation Lehen stands out of other comparable antedated activities.
aspern Vienna´s Urban Lakeside - subproject 6a: Energy Consumption Monitoring
This subproject of the flagship project "aspern plus" derived the basis for a centralised monitoring of the energy consumption in Seestadt aspern.
aspern Vienna´s Urban Lakeside - subproject 6b: Monitoring of Energy Consumption in Demonstration Buildings in Seestadt Aspern
The project deals wtih the energy consumption monitoring of demonstration buildings, which are erected within the framework of the landmark project "aspern+". As both, office/manufacturing as well as residential buildings will be constructed, these different user groups will have to be considered. The derivation of the concepts will be done in accordance of the specific needs of the individual demonstration buildings.
PHOTOVOLTAIC WATER Solution
Passive House refurbishment facade with integrated photovoltaic modules for direct, current-based warm water preheating. The GIWOG, an energy-conscious and environmentally and socially oriented client, intends to undertake an energy-related modernisation project, which will further optimise energy consumption to be more efficient at an apartment complex in Graz, main street 302-306. The goal is to lower the energy consumption for heating and hot water from the current level of approximately 135 kWh /m²a to approximately 8 kWh /m²a. The planned measures should correspond with an overall energy consumption reduction of approx. 94 %.
Innovation & Cost efficiency: Building standards for multi family residential buildings at optimal cost (Inno-Cost)
In this project, innovative building standards were examined concerning their economical aspects through the life cycle of a building. By means of life cycle-costs for 40-50 multi family lowest energy and passive house residential buildings on actual data from the day-to-day operation, reliable data and know-how was compiled for the first time, which is to support further market penetration of innovative building standards in the field of multi family residential buildings.
Demonstration building of the eco²building system: First passive house prefabricated wood building system for commercial and industrial buildings
The EU funded "eco2building" construction system in a timber-frame based modular design represents a systematic approach for energy efficient commercial and industrial buildings. The object of the eco²building demonstration project - the logistics centre in passive-house quality for "Eine Welt Handel AG" - in Niklasdorf was to optimize the planning and construction processes and prepare for the market launch of the eco²building construction system. Accompanying research monitored and disseminated the experience.
Monitoring Sunhouse Eferding
In course of the monitoring project the effectiveness of the energy-technical system was checked on the basis of running measuring data. The data were evaluated and, if required, the arrangements and settings of the control system were adapted. Main result is that the energy balance could have been improved explicitly whilst the monitoring process.
Gründerzeit with future - demonstration project 1: David´s Corner
High value energy efficient refurbishment of an ensemble of three neighbouring Wilhelminian style buildings in a non-lucrative location.
aspern Vienna´s Urban Lakeside - subproject 5: Monitoring of Energy Consumption in Demonstration Buildings in Seestadt Aspern
Goal of the project is to develop a monitoring tool that allows to predict the expectable (final) quality of the residential buildings based on decisions made during the planning and construction phase. For this purpose, the current certification tool for the determination of "TQB-points" will be equipped with "interim" certifications, which shall allow the land developer to carry out a quality monitoring parallel to the construction phase. The tool will be tested with the data obtained from selected construction projects during the first residential development phase in seestadt aspern.
monitorPlus. Monitoring of pilot projects of the Austrian RTD-program Building of Tomorrow Plus
All pilot projects of "Building of Tomorrow Plus" had to be evaluated in a common monitoring project on energy efficiency, user's acceptance, and the integrated building performance. monitorPlus documented and assessed the results of this evaluation.
Energy Efficiency and Risk Management in Public Buildings (EnRiMa)
The major objective of the project EnRiMa was to develop an internet based decision-support system (DSS) to enable operators of public buildings to increase the system efficiency as well as to reduce the CO2 emissions. The DSS can be linked to existing energy management systems as DESIGOTM. The University of Applied Science Burgenland, Campus Pinkafeld, and ENERGYbase, Vienna, have been used to test and calibrate the EnRiMa DSS.
ECR Energy City Graz - subproject 3: +ERS - Plus Energy Network Reininghaus Süd
The multifunctional neighbourhood "+ERS - Plus Energy Network Reininghaus Süd" was realized within the urban planning area of Graz-Reininghaus. The project aims to optimize the energy concept of the single buildings as well as of the building cluster in order to achieve a plus-energy standard within the residential neighbourhood.
Zero Carbon Buildings International - Evaluation and Analysis
Analysis of the performance of a demonstration building on the Philippines and potential for transferability to other developing and newly industrialising countries.
e80^3-Buildings - Sub project 5: Monitoring and dissemination
The content of subproject 5 was the analysis of energy- as well as building-biology-related issues for the evaluation and quality management of the demo-project in Kapfenberg, which involves a high-quality refurbishment to a plus energy house within the program "Haus der Zukunft - Building of Tomorrow". Within this process the user acceptance before, during and after the renovation was elevated and this will be processed for upcoming projects. The environmental quality of the building regarding the choice of materials and measures during the construction phase and the subsequent use of the building was assessed with the help of the TQB-planning and evaluation tool.
BIGMODERN - Subproject 10: Evaluation, Documentation and Ensuring Transferability
The subproject 10 is part of the flagship project BIGMODERN. It is based on the results of subproject SP 7 in which a monitoring concept has been developed. This concept is now implemented through monitoring of different aspects occurring during the first two years of operation of both BIGMODERN demonstration buildings.
"gugler! build & print triple zero" - subproject 9: Monitoring Gugler - Monitoring, evaluation, optimization GUGLER
The project objective is the measurement of relevant building values (energy consumption, ...), the evaluation of these values compared with the intended objectives and the optimization of the system based on the measured data. As a special innovation, monitoring the storage of alternatively generated electricity using photovoltaic and wind energy in the form of compressed air must be considered.
RENEW SCHOOL Austria: Examples and financing models for school renovations
The project aimed at learning from 14 Austrian school buildings, from their financial and cooperation models, meaning successful cooperation between involved parties. The success factors have been derived from these projects and together with 10 best practice schools been published in a brochure. The project supported the Austrian activities in the IEE EU-Projekt RENEW SCHOOL (www.renew-school.eu).
Increase of in-house consumption by building clusters and active storages (Eigenlast Cluster)
The project involved the evaluation of the significance of new approaches for the increase of in-house consumption of solar energy (electric energy and heat) of buildings in Großschönau, which are already equipped for such measurements. The existing municipal buildings, commercial buildings and households are aggregated to form virtual building clusters. Subsequently, the clusters were analyzed according to their in-house consumption with and without the usage of batteries and H2 storages. The economic analysis of this concept derives from a regional implementation plan for further industrial research.
ThinkHome: Improved energy efficiency based on artificial intelligence in future homes
ThinkHome is a networked controlled home of the future with the ultimate goal to optimise energy efficiency and user comfort at the same time. On this way, smart interaction between all building services is of utmost importance. Goals of this project include the definition of a comprehensive knowledge base that holds all relevant building data, the evaluation of control strategies based on artificial intelligence and machine learning, as well as agent based software engineering.