Suchergebnisse

Haus der Zukunft

Rebuilding of the organic farm Achleitner, straw & clay - room climatisation with plants

Rebuilding of a marketing-, store- and processingcenter with an organic freshmart and an organic restaurant in passivhouse quality. Application of regional building materials, an innovatve overall energyconcept, climatisation with plants.

Haus der Zukunft

School vent cool - Ventilation, cooling and strategies for high performance school renovations

Based on a building typology, strategies for prefabrication for high-quality thermic-energetic renovation of school buildings were developed. New solutions for ventilation systems to achieve good air quality and shading systems were analysed and tested. The "School vent cool" method for renovation of schools has been developed.

Haus der Zukunft

COOLSAN - refrigeration concepts for office and administrative buildings retrofit

Technologies to enhance comfort and minimise energy requirements for air conditioning in existing office and administrative buildings. Possibilities to reduce the cooling loads and strategies for the use of passive cooling systems.

Haus der Zukunft

BIGMODERN - Subproject 5: Feasibility studies about innovative technical solutions

The application of innovative technologies means additional planning and coordination effort which usually cannot be incorporated into the conventional planning processes of the BIG. To overcome these barriers for the application of innovative technologies, the sub project at hand aims at preparing information, feasibility studies, planning records, experiences and practical examples in a way, that they can be implemented directly into the planning process.

Haus der Zukunft

"gugler! build & print triple zero" - subproject 4: energy concept Gugler

The energy concept led Gugler in frame of the conversion and expansion of the company towards plus-energy standard. Significant measures ware a consequent maximum reduction of the energy demand, optimal utilisation of industrial waste-heat, maximum consumption of on-site energy sources, integrated energy production, ecologic load manage­ment with comprehensive response- and storage-techniques.

Haus der Zukunft

"gugler! build & print triple zero" - subproject 5: Ecoeffective building

On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building will be developed.

Haus der Zukunft

BIGMODERN - Subproject 2: Demonstration project of an official building in Bruck

In the frame of this subproject being part of the flagship project BIGMODERN, a decision matrix as well as a handbook for planning, including feasibility analysis and a collection of information, serving as decision guidance for planning and implementation of sustainable building refurbishment, is being developed. In this way, the risk for planners and builders of the usage of new sustainable technologies shall be minimised.

Haus der Zukunft

BIGMODERN - Subproject 10: Evaluation, Documentation and Ensuring Transferability

The subproject 10 is part of the flagship project BIGMODERN. It is based on the results of subproject SP 7 in which a monitoring concept has been developed. This concept is now implemented through monitoring of different aspects occurring during the first two years of operation of both BIGMODERN demonstration buildings.

Haus der Zukunft

LifeCycle Tower - Energy efficient prefabricated multi-storey timber houses

Based on the results of previous research projects, the project at hand deals with the development of a wooden prefabricated module construction for energy efficient office buildings with up to 20 storeys. This sustainable system ensures cost certainty through the whole life cycle of the building.

Haus der Zukunft

Passive house Kindergarten with an integrated therapeutical group

Applied passive house techniques with locally available materials for a public building using limited funds.

Haus der Zukunft

SchulRen+ Innovative plus-energy refurbishment concepts for school buildings

In a technical feasibility study and based on a real example, the project analysed innovative plus-energy refurbishment concepts for school buildings. The goal was to develop refurbishment concepts with a high replication potential which combine future-oriented energy concepts with feasible technical and architectural solutions.

Haus der Zukunft

Thermo-Active Building Systems - Development of a Calculation kernel (TBA-CALC )

This project result will provide Austria with a uniform software environment for the simulation of thermo-active building systems in the form of a validated tool.

Haus der Zukunft

Ecological restoration of a listed building with passive house technologies

Ecological exemplary reconstruction of the "Haidenhof"-building, Bad Ischl, Upper Austria. Building refurbishment with respect to monumental protection and newest passive house technologies. Reorganisation of the former residential building to an academy of arts and culture.

Haus der Zukunft

Energy package Kolpinghaus / Eco-Suite Hotel

The Kolping association’s dormitory for pupils and students has been extended. The energy demand of the newly constructed Eco-Suite Hotel is minimized by use of highly efficient components (such as LED lighting). Locally available energy sources (waste water heat and sunlight) are used and an on-site energy system is being created for the use of the heat energy surplus. Guests at Eco-Suite Hotel can experience life in a plus energy building.

Haus der Zukunft

Plus energy office building - Subproject 3: Austria's biggest plus energy office building

In course of the refurbishment of the Vienna University of Technology (Univercity 2015) Austria´s biggest plus energy office building is going to be built. This project intends to demonstrate not only the technical but furthermore the economical feasibility of plus energy office buildings. Within this building the plus energy concept is fulfilled by optimizing the power consumption of the whole building and the installation of Austria´s largest facade integrated photovoltaic plant.

Haus der Zukunft

Strategy development for (technical / economical feasibility of) energy autarcic buildings

Development of a strategy for energy autarcic buildings with appropriate Technology solutions.

Haus der Zukunft

Construction Site SCHOOL - Sustainable Models for the Refurbishment of School Buildings?

In this research project, models for refurbishment and restructuring of school buildings were developed. The reconstruction concepts contain lists of measures for deploying sustainable building techniques and exemplary case studies for the reorganisation of buildings of different typologies.

Haus der Zukunft

Demonstration project LifeCycle Tower - batch-produced energy efficient timber/hybrid high-rise building system

The energy efficient building concept shall be tested with regard to its functional efficiency and real usage conditions. The demonstration project is based upon the results of previous research activities and shall be presented to a wider public. It shall illustrate the advantages of a batch-produced timber/hybrid high-rise building system which offers high quality of energy and resource efficiency.

Haus der Zukunft

Urban consolidation Lehen - Subproject 8a: project management - documentation - dissemination and quality assurance

The project coordinates several projects in the urban quarter Lehen to ensure increase of energy efficiency and sustainable development. This subproject contains the coordination of the partners and projects in order to reach defined standards of quality, coordination and cooperation with the program "Building of Tomorrow" and other flagship projects as well as the documentation of results.

Haus der Zukunft

"gugler! build & print triple zero" - subproject 6: Integration of the C2C production into the flagship project Gugler

Print and media production at the media and communications company gugler GmbH are currently being optimized according to Cradle to Cradle (C2C) criteria. The goal of this subproject is to allow the demands of a C2C production process optimized for exchange with biological cycles to be included into the general planning of the new production building of the company, a pilot project within the "building of tomorrow" program line.