Innovative moth-protection system for sheepwool insulation
This project developed a novel "bio-pesticide"-formula by screening plant extracts and minerals for their strong repellant activity in order to protect sheepwool insulation from cloth moth infestation. It was investigated and examined by state-of-the-art-technology that the anti-moth-mixture extracted from plants and minerals, acts as a valid alternative to existing pest control agents.
Formation of an Austrian EPD-Platform for building products
The objective of the project at hand was to create the general program guidelines for the "Austrian EPD-platform for building products": basic guidelines, general guidelines for LCA, general guideline for determination of emissions to indoor air and environment during operation phase.
Development of modular parts for clay-passive houses
Development of extensive storey-high modular parts made of renewable primary products (wood, straw, hemp) for clay-passive houses.
BIMaterial Process Design for Material Building Pass
Building Information Modelling supported compilation of a Material Building Pass; as a qualitative and quantitative documentation of the material composition of, and the material distribution within, a building structure. This project is a central milestone towards standardized, BIM-generated building material passes.
Can sustainable building be realized at reasonable costs?
At the development "residential Passive House Utendorfgasse" were reached very low building costs. Would there be different building costs by using ecological materials and technologies? There will be calculated additional and reduced costs by using the ecological building-catalogue and internal characteristic values of projects that are similar in design.
Alternative insulation made from modified lignocellulosic fibers
Wood as the raw material for a new insulation material
WHISCERS. Whole House In-Situ Carbon & Emission Reduction Solution
Whiscers is a system for installing internal wall insulation with minimal mess, whilst the resident remains in the property. It involves measuring the walls in the property using a laser device that enables fast and highly accurate measurement. Information is then sent electronically to a computer controlled off-site cutting machine that is rapid, precise and mess-free.
Criteria catalogue for quality assurance in the construction of passive houses built in wood
By means of a criteria catalogue possible sources of error in the construction of passive houses built in wood will be identified both craft specific and concerning the installation of house automation facilities. Solutions will be acquired, a controlling tool for construction sites will be offered.
"gugler! build & print triple zero" - subproject 1: lead project management
The lead project management provides furthermore for sufficient interlinking between the project partners by monthly, by requirement weekly project workshops. Besides the leading project management represents the project gugler to the outward and takes part in workshops of the program management
ÖkoInform:2 - Platform for Exchange of Information in Green Building
A platform for the exchange of information to promote the better integration of ecological materials and renewable resources in the research programme "Building of Tomorrow"
Sprayed-on and Plaster-covered Cellulose-insulation without vapour barrier
Investigations on the fundamental suitability of sprayed-on and plaster-covered cellulose insulation for thermal insulation of buildings.
Rebuilding of the organic farm Achleitner, straw & clay - room climatisation with plants
Rebuilding of a marketing-, store- and processingcenter with an organic freshmart and an organic restaurant in passivhouse quality. Application of regional building materials, an innovatve overall energyconcept, climatisation with plants.
Information-point for renewable and environmental/ecological materials
An internet platform with full information and detailed data about building materials made of renewable resources, which serves as the central information-point for different stake holders - from private house builders over architects and master-builders to experts in the field of building laws and regulations.
Research work on outside sprayed-on cellulose insulation covered with plastering
This research work was done to expand knowledge about outside sprayed-on cellulose insulation application focusing on mechanical and physical properties respectively.
Stroh-Cert: certification, logistic and quality management for straw bale buildings
Certification of straw bales as insulating material, development of a straw bale logistic concept and a quality management system as strategic measures with the aim of the dissemination of straw bales as insulating material
Pallets never pall - Development of the Pallet House to series-production readiness
The winning project "Pallet House" of the EU-wide competition GAU:DI in 2007 consists of 800 (used) pallets. It has been exhibited in a scale 1:1 at the Biennale in Venice 2008 and has been developed for mass production within this project. Therefore, two exemplary scenarios were developed: (temporary) construction at Vienna's Urban Lakeside in Aspern and the construction of a low-cost building in South Africa.
baubookPlus - Expansion of an extensive knowledge database of sustainable buildings
By the foundation of the baubook GmbH in 2008 the two databases of building products "öbox" and "ixbau.at" have been merged. The new database baubook was expanded. Essential functions (central product declaration, decentral quality management) and fields of products were added.
Development of a Window for Passive-Housing Featuring an Integrated Sun Shield
Development of a laminated wooden/aluminum window for a passive-housing featuring an integrated sun shield in the shape of blinds or of folding net curtain.
"gugler! build & print triple zero" - subproject 2: building with recycros
Building with recycros is working out basics in order to close the cycle of materials in the building sector as well as to increase the usage of recycled materials (recycros). The existing material cycles in the building sector are going to be analysed. Furthermore, there will be a catalogue presented, covering the actual situation of which materials are used in today´s engineering and how the waste is treated. The project will be completed with a summary of results and a proposal of concrete materials and constructional systems for the building project gugler.
LifeCycle Tower - Energy efficient prefabricated multi-storey timber houses
Based on the results of previous research projects, the project at hand deals with the development of a wooden prefabricated module construction for energy efficient office buildings with up to 20 storeys. This sustainable system ensures cost certainty through the whole life cycle of the building.