Suchergebnisse
"gugler! build & print triple zero" - subproject 1: lead project management
The lead project management provides furthermore for sufficient interlinking between the project partners by monthly, by requirement weekly project workshops. Besides the leading project management represents the project gugler to the outward and takes part in workshops of the program management
ÖkoInform:2 - Platform for Exchange of Information in Green Building

A platform for the exchange of information to promote the better integration of ecological materials and renewable resources in the research programme "Building of Tomorrow"
Strat-CON - Strategic Actions for Realising the Vision of ICT in Construction
Refinement and validation of the implementation proposals in order to achieve the realisation of the ROADCON vision and roadmap for ICT in construction by means of stakeholder-workshops, structured interviews and questionnaires.
Development of a Window for Passive-Housing Featuring an Integrated Sun Shield

Development of a laminated wooden/aluminum window for a passive-housing featuring an integrated sun shield in the shape of blinds or of folding net curtain.
Fundamentals on the development of ecological high class insulation composites made from natural plant fibres
Fundamentals on an insulation made from flax and hemp fibres which can be directly pargeted on the outer wall of a building had been developed. Only ecological glues and additives were used. Variations of the production and the additives optimized the technical properties. In addition flame proofing and thermal transfer were tested. After the laboratory tests a prototype finished the project.
Demonstration project LifeCycle Tower - batch-produced energy efficient timber/hybrid high-rise building system
The energy efficient building concept shall be tested with regard to its functional efficiency and real usage conditions. The demonstration project is based upon the results of previous research activities and shall be presented to a wider public. It shall illustrate the advantages of a batch-produced timber/hybrid high-rise building system which offers high quality of energy and resource efficiency.
Basic research on the load bearing capacity and high thermal insulation properties of foam glass granulate
The aim of the scientific investigations is to find the characteristic parameters of foam glass granulate applied as load transfer layer and thermal insulation, to provide the base for the application of a multi functional and economical insulation material at the interface between building and ground for buildings of the future.
Criteria catalogue for quality assurance in the construction of passive houses built in wood
By means of a criteria catalogue possible sources of error in the construction of passive houses built in wood will be identified both craft specific and concerning the installation of house automation facilities. Solutions will be acquired, a controlling tool for construction sites will be offered.
Information point for renewable and ecological materials (II) online information plus service offer

Development and maintainance of the internet platform for building materials made of renewable resources at www.nawaro.com, which serves the central information-point for important stake holders - private house builders, architects, master-builders and experts in the field of building laws.
Developing of a cost-efficient, energy-optimized window, built of wood and ecological insulating materials

Development of a sustainable windowconstruction using solar energy and ecogical materials.
Transferproject: Professional strawbale building - "Virtual building-site", exhibition and instruction material
Strawbale-workshops are considered as the best way to inseminate this ecological building-technique. The "virtual building site" has some decisive advantages over the common situation: it does not depend on the weather, allows the comparative study of different constructing methods and can, as a permanent installation, be used as an exhibition.
"gugler! build & print triple zero" - subproject 2: building with recycros
Building with recycros is working out basics in order to close the cycle of materials in the building sector as well as to increase the usage of recycled materials (recycros). The existing material cycles in the building sector are going to be analysed. Furthermore, there will be a catalogue presented, covering the actual situation of which materials are used in today´s engineering and how the waste is treated. The project will be completed with a summary of results and a proposal of concrete materials and constructional systems for the building project gugler.
ÖkoInform - Platform for Exchange of Information in Green Building

A platform for the exchange of information to promote the better integration of ecological materials and renewable resources in the research programme "Building of Tomorrow"
New High thermal insulated lightweight timber-frame constructions
Development for the application in the passive house standard (e.g. low-energy houses).
Rebuilding of the organic farm Achleitner, straw & clay - room climatisation with plants

Rebuilding of a marketing-, store- and processingcenter with an organic freshmart and an organic restaurant in passivhouse quality. Application of regional building materials, an innovatve overall energyconcept, climatisation with plants.
Optimisation of ecological construction components for industrial serial production of precast elements
The project focused on passive house elements from straw and clay. Special interest was paid at a novel straw insulation as well as at an efficient drying process of the clay. Sustainability of the building materials was a very important aspect within the project.
First remediation of already existing homes to passive house standard with Vacuum insulated panels (VIPs)
Demonstration of the way to redevelop a home of the 19th century to passive house standard in consideration of moisture process and the use of vacuum insulation.
Development of modular parts for clay-passive houses

Development of extensive storey-high modular parts made of renewable primary products (wood, straw, hemp) for clay-passive houses.
BIMaterial Process Design for Material Building Pass
Building Information Modelling supported compilation of a Material Building Pass; as a qualitative and quantitative documentation of the material composition of, and the material distribution within, a building structure. This project is a central milestone towards standardized, BIM-generated building material passes.
Alternative insulation made from modified lignocellulosic fibers
Wood as the raw material for a new insulation material