EnerPHit-green concept Modernisation of a historic building with application of an aerogel insulation plaster
This demonstration project shows the comprehensive modernization of a historic building within the constraints of a regional protection zone. By using the Aerogel high-performance insulating plaster, a comprehensive energy-efficient building refurbishment had been realized without changing the outer appearance of the façade.
SchulRen+ Innovative plus-energy refurbishment concepts for school buildings
In a technical feasibility study and based on a real example, the project analysed innovative plus-energy refurbishment concepts for school buildings. The goal was to develop refurbishment concepts with a high replication potential which combine future-oriented energy concepts with feasible technical and architectural solutions.
Future Quarter - Way to an energy-plus quarter in Vienna
Development of transferable concepts for energy-plus quarters as substantial preparatory work for the implementation of an energy showcase quarter in Vienna based on six concrete areas. The support for the broad application of the concept shall be a precursor for the realisation of future energy showcase quarters in Vienna and other cities.
BIGMODERN - Subproject 5: Feasibility studies about innovative technical solutions
The application of innovative technologies means additional planning and coordination effort which usually cannot be incorporated into the conventional planning processes of the BIG. To overcome these barriers for the application of innovative technologies, the sub project at hand aims at preparing information, feasibility studies, planning records, experiences and practical examples in a way, that they can be implemented directly into the planning process.
BIGMODERN - Subproject 2: Demonstration project of an official building in Bruck
In the frame of this subproject being part of the flagship project BIGMODERN, a decision matrix as well as a handbook for planning, including feasibility analysis and a collection of information, serving as decision guidance for planning and implementation of sustainable building refurbishment, is being developed. In this way, the risk for planners and builders of the usage of new sustainable technologies shall be minimised.
Refurbishment of an existing villa of the "Gründerzeit" to passive house standard with passive and active solar use
The project shows in an exemplary way how buildings of the time of "Gründerzeit" could be maintained and could offer a better environmental balance including the view of the village and the traffic than a new building. As an example a villa has been converted into a multi-family house within a larger housing project.
e80^3-Buildings - Sub project 4: Demonstration object
Alongside the realisation of the plus energy building in Kapfenberg, a demonstration project is scheduled to be created that accomplishes an economically viable and technically innovative solution for the future.
Plus energy office building - Subproject 3: Austria's biggest plus energy office building
In course of the refurbishment of the Vienna University of Technology (Univercity 2015) Austria´s biggest plus energy office building is going to be built. This project intends to demonstrate not only the technical but furthermore the economical feasibility of plus energy office buildings. Within this building the plus energy concept is fulfilled by optimizing the power consumption of the whole building and the installation of Austria´s largest facade integrated photovoltaic plant.
e80^3-Buildings - "reconstruction concepts towards energy plus house standard with prefabricated active roof and facade elements, integrated home automation and network integration"
The project aims for highly-efficient renovation of existing buildings and settlements in urban areas. The main focus are buildings that were built between 1950 and 1980.
Kierling passive house - heading into the future sustainably
Using the example of demonstrational renovation, Kierling (built between 1977 and 1979) tests the possibilities of a renovation in passive house standard in technical, organizational and financial terms as an outstanding example of a comprehensive renovation.
BIGMODERN Subproject 7: Monitoring concept
Development of a pattern for comprehensive documentation of the project results. The concepts contain amongst others monitoring of energy consumption, resources, costs, functionality and comfort, etc.
Urban consolidation Lehen
The key project "Stadtumbau Lehen" ("urban consolidation Lehen") coordinates several projects at the urban district of Lehen, with the purpose of the raise in energy efficiency and safekeeping of a sustainable development. Four builder (ten teams of architects), two scientifically institutions, the town of Salzburg and two attended departments of the land are working together.
SPACE4free - Retrofitting souterrain areas in 19th century townhouses to apartments with high quality of life and low energy consumption
Planning of durable and damage-free apartments with high quality of life and low energy consumption in moisture exposed souterrain areas of 19th century townhouses. Using innovative ventilation control systems comfortable room climate will be created. Additionally the tolerance of different types of use is ensured. A planning tool enables the scaling of the findings and thus the applicability to various planning situations.
BIGMODERN Subproject 3: Demonstration building University Innsbruck - Main building of the Faculty for Technical Sciences - Planning process
Demonstration of feasibility of renovation of an official building in high thermal and energetical quality and consideration of further sustainable criteria.
BIGMODERN - Subproject 8: Demonstration building Amtshaus Bruck - Realisation
In the frame of the flagship project BIGMODERN the "Amtshaus Bruck an der Mur" had been renovated according to above-average quality standards concerning energy efficiency and sustainability while complying with an industrial management point of view.
BIGMODERN - Subproject 10: Evaluation, Documentation and Ensuring Transferability
The subproject 10 is part of the flagship project BIGMODERN. It is based on the results of subproject SP 7 in which a monitoring concept has been developed. This concept is now implemented through monitoring of different aspects occurring during the first two years of operation of both BIGMODERN demonstration buildings.
BIGMODERN - Subproject 11: Dissemination of project results
The project is part of the flagship project BIGMODERN. It aims at disseminating all relevant results of BIGMODERN in a comprehensive and targeted way. It addresses different target groups, such as decision makers inside the BIG Bundesimmobiliengesellschaft, various users of federal buildings and other real estate companies nationally and internationally.
Serial refurbishment for buildings in timber construction
Refurbishment of single- and two-familiy houses in timber construction in Austria has a large CO2-saving potential. To meet the special requirements for the refurbishment of timber constructions, a concept for the renovation to passive house respectively plus-energy house standard with special focus on ecologic construction materials was developed in this project.
BIGMODERN - Subproject 6: Incentives to enforce energy efficiency and sustainability in modernizations of BIG-buildings
Development of approaches, which lead to general conditions for complete refurbishments in BIG-buildings, which support high standards regarding energy efficiency and sustainability. This will ensure high-quality modernizations for BIG's real estate.
Intensified Density - a small scale densification strategy for the suburbs by using modular construction
The project investigated whether a small scale densification strategy for the suburbs / intermediary cities, using modular construction, and existing infrastructure on empty plots of land, can offer a competing alternative to not only the sprawl of single family dwellings but also to large projects.