Suchergebnisse für "Factsheet: Energietechnologien gestalten, die für alle sinnvoll und nutzbar sind"
KLIMADEMO VIS-A-VIS: Participatory realization of a climate-neutral demonstration building Vis-à-Vis
Participatory development of a pilot project at the interface between climate neutrality, affordability and multi-storey wooden housing based on well-founded decision-making bases in terms of renewable materials and renewable energies. The result is a multipliable carbon neutral building and the dissemination of carbon neutrality know-how to a larger audience.
StromBIZ - demonstration projects: business models for decentralized electricity generation and distribution
Feasible business models to utilize locally generated renewable energy are expected to induce a tipping point for the "Energy Turnaround" in Austria. Within the proposed project a number of demonstration PV plants on residential and non-residential buildings had been realized. On this basis new approaches of business cases had been developed, implemented, tested and disseminated.
Specification for biomass heating systems for buildings with low energy demand

The aim of this project was to develop specifications for biomass heating systems for buildings with a low energy demand. The focus was on multi-family residential buildings and office buildings.
Office Building WKS - Plus Energy Office Building in Ernstbrunn
The new office building (headquarter) of Windkraft Simonsfeld AG in Ernstbrunn (Lower Austria) is planned as a plus energy building. From this excellent starting conditions it is intended to make seven more steps to explore innovative options for energy plus buildings.
Demonstration building of the eco²building system: First passive house prefabricated wood building system for commercial and industrial buildings
The EU funded "eco2building" construction system in a timber-frame based modular design represents a systematic approach for energy efficient commercial and industrial buildings. The object of the eco²building demonstration project - the logistics centre in passive-house quality for "Eine Welt Handel AG" - in Niklasdorf was to optimize the planning and construction processes and prepare for the market launch of the eco²building construction system. Accompanying research monitored and disseminated the experience.
AFOM - Automatic failure and optimisation analysis by data-acquisition
In the project, methods will be developed for analysing measured value curves to detect changes in operation or failures in the system. By integrating BIM data of buildings, corresponding models will be generated to validate the heating, ventilation, and air conditioning (HVAC)-networks, which will be used for analysis.
OWA+Quartier - Sustainable refurbishment and energy supply for the historic Otto-Wagner-Areal towards a plus-energy district
Development of thermal and electrical energy supply for the Otto-Wagner-Areal as well as model solutions for construction and building services in order to initiate the redevelopment of the area in the direction of a plus-energy district.
"gugler! build & print triple zero" - Subproject 7: Integrated General Planning
The aim of the subproject 7 is to aggregate a "normal" general planning process with innovative additional services. In the spirit of integrated planning in the design a higher number of design parameters must be resolved. This is different to a classic planning process with linear and chronological lined up add ons.
IEA ECBCS Annex 51 Experts Workshop: Energy Efficient Communities
2. - 3. October 2012
Tribühne Lehen, Tulpenstraße 1, 5020 SalzburgSalzburg, AT
Presentations of current results of research projects related to cross-building and energy optimised solutions for communities with the possibility of discussion and networking of national and international experts.
Applying passive technologies in social housing, 1140 Vienna; Utendorfgasse 7

Multi-storey social passive house construction with 39 units in Vienna, 14 Utendorfgasse under adherence to the international passive house standard and simultaneous extremely low construction costs.
GreenPlusSchool@urban - Highly efficient facade and roof greening in combination with PV; optimal solution for energy efficiency in overall environmental consideration
In this project, different building-greening systems and plant/substrate types, combined with various PV modules, had been examined on a Viennese school. The influence on the hygrothermal behaviour of the building, energy-saving potential, humidity, shading, noise reduction, water retention and heat island effect are being scientifically explained. The students of the school will also be involved.
"gugler! build & print triple zero" - subproject 5: Ecoeffective building
On the basis of the commercial building gugler with 2140 m² useable floor area existing and 3260 m² useable floor area to be built a concept for a 100% recyclable ecoeffective building will be developed.
PEAR – Test facility for energy efficient automation and control of buildings
The energy demand calculated in the design phase often differs from measured values in the actual building operation. This projects reviews building automation and operation by presenting a solution how to assess energy efficiency of control strategies in the fields of air conditioning systems, concrete core activation and free cooling. The results are implemented in the demonstration building "Post am Rochus".
Data for schooling focused on passivehouses

Elaboration of high quality data about Passive Houses technology, to be used in training programs for building related professionals.
Development of a Cost-Benefit-Tool: costs and benefits of energy efficient and ecologic buildings
Development of a cost-benefit-tool which reaches beyond a pure cost approach and also recognizes the benefits of a building for its inhabitants and users. The inclusion of benefits is based on existing evaluation systems, especially on the Austrian building evaluation system TQB - Total Quality Building, which has been revised in 2009.
Sprayed-on and Plaster-covered Cellulose-insulation without vapour barrier

Investigations on the fundamental suitability of sprayed-on and plaster-covered cellulose insulation for thermal insulation of buildings.
Timber construction for high-density housing

Development of technical and economical solutions for high-density housing in timber construction under consideration of future regulatory developments (case study of a 5-story housing complex in Vienna).
Evaluation of mechanical class room ventilation systems in Austria and generation of a planning guideline
Accumulation of technical solutions and practical experience of schools (kindergarten) with mechanical ventilation systems and identification of how pupils and teachers accept the systems.
ECC – EnergyCityConcepts – Development of a methodology and concept for the implementation of sustainable energy systems in cities by the example of Gleisdorf and Salzburg
In the context of this project two concrete model regions (small city Gleisdorf and urban city quarter Salzburg-Schallmoos) will be developed and tested with new methodical approaches (interdisciplinary urban and regional energy planning, modeling and simulation). An ambitious political commitment of both model regions is a 100% renewable or rather CO2-neutral energy supply.
SUBURBAHN – test- and demonstration-area for urban development and mobility around public transport stations in the central area of Upper Austria
Targeted, process-oriented conception for the implementation and operation of a test- and demonstration-area for urban development and mobility in Ansfelden involving relevant scientific stakeholders, local and regional stakeholders, decision-makers as well as the interested public according to the living lab approach.