Haus der Zukunft

Know-How-Plus - Options and constraints of building renovation towards plus energy building standard

Aim of this research project is to identify the realizable reduction potential of energy consumption and CO2 emissions by refurbishment of the Austrian building stock towards plus energy building standard. Furthermore a construction-oriented manual will be supplied for interdisciplinary planning.

Haus der Zukunft

Gründerzeit with future - demonstration project 1: David´s Corner

High value energy efficient refurbishment of an ensemble of three neighbouring Wilhelminian style buildings in a non-lucrative location.

Haus der Zukunft

Evaluation of temperature differentiation on a room-by-room basis in passive house apartments

In the passive house Utendorfgasse a room–by-room temperature control was installed in 11 apartments. The experiences were evaluated from a technological and from a sociological point of view.

Haus der Zukunft

BIGMODERN - Subproject 9: Demonstration project University Innsbruck, Faculty for Construction Engineering - Implementation

The demonstration project University Innsbruck, building of the faculty for construction engineering is part of the flagship project BIGMODERN. The demonstration project shows that in major renovation projects high energy and sustainability performance can be achieved using economically viable solutions.

Haus der Zukunft

SchulRen+ Innovative plus-energy refurbishment concepts for school buildings

In a technical feasibility study and based on a real example, the project analysed innovative plus-energy refurbishment concepts for school buildings. The goal was to develop refurbishment concepts with a high replication potential which combine future-oriented energy concepts with feasible technical and architectural solutions.

Stadt der Zukunft

Future Quarter - Way to an energy-plus quarter in Vienna

Development of transferable concepts for energy-plus quarters as substantial preparatory work for the implementation of an energy showcase quarter in Vienna based on six concrete areas. The support for the broad application of the concept shall be a precursor for the realisation of future energy showcase quarters in Vienna and other cities.

Haus der Zukunft

Pilot project gaining-building-land Pongau

Gaining extra space for additional households through sustainable renovation and/or extension of 8 detached houses by integrating consulting, planning, energy efficiency concepts and financing.

Haus der Zukunft

BIGMODERN - Subproject 5: Feasibility studies about innovative technical solutions

The application of innovative technologies means additional planning and coordination effort which usually cannot be incorporated into the conventional planning processes of the BIG. To overcome these barriers for the application of innovative technologies, the sub project at hand aims at preparing information, feasibility studies, planning records, experiences and practical examples in a way, that they can be implemented directly into the planning process.

Stadt der Zukunft

EnerPHit-green concept Modernisation of a historic building with application of an aerogel insulation plaster

This demonstration project shows the comprehensive modernization of a historic building within the constraints of a regional protection zone. By using the Aerogel high-performance insulating plaster, a comprehensive energy-efficient building refurbishment had been realized without changing the outer appearance of the façade.

Haus der Zukunft

BIGMODERN - Subproject 2: Demonstration project of an official building in Bruck

In the frame of this subproject being part of the flagship project BIGMODERN, a decision matrix as well as a handbook for planning, including feasibility analysis and a collection of information, serving as decision guidance for planning and implementation of sustainable building refurbishment, is being developed. In this way, the risk for planners and builders of the usage of new sustainable technologies shall be minimised.

Haus der Zukunft

RENEW SCHOOL Austria: Examples and financing models for school renovations

The project aimed at learning from 14 Austrian school buildings, from their financial and cooperation models, meaning successful cooperation between involved parties. The success factors have been derived from these projects and together with 10 best practice schools been published in a brochure. The project supported the Austrian activities in the IEE EU-Projekt RENEW SCHOOL (www.renew-school.eu).

Haus der Zukunft

Plus energy office building - Subproject 3: Austria's biggest plus energy office building

In course of the refurbishment of the Vienna University of Technology (Univercity 2015) Austria´s biggest plus energy office building is going to be built. This project intends to demonstrate not only the technical but furthermore the economical feasibility of plus energy office buildings. Within this building the plus energy concept is fulfilled by optimizing the power consumption of the whole building and the installation of Austria´s largest facade integrated photovoltaic plant.

Haus der Zukunft

Refurbishment of an existing villa of the "Gründerzeit" to passive house standard with passive and active solar use

The project shows in an exemplary way how buildings of the time of "Gründerzeit" could be maintained and could offer a better environmental balance including the view of the village and the traffic than a new building. As an example a villa has been converted into a multi-family house within a larger housing project.

Haus der Zukunft

e80^3-Buildings - Sub project 4: Demonstration object

Alongside the realisation of the plus energy building in Kapfenberg, a demonstration project is scheduled to be created that accomplishes an economically viable and technically innovative solution for the future.

Haus der Zukunft

BIGMODERN Subproject 7: Monitoring concept

Development of a pattern for comprehensive documentation of the project results. The concepts contain amongst others monitoring of energy consumption, resources, costs, functionality and comfort, etc.

Haus der Zukunft

Kierling passive house - heading into the future sustainably

Using the example of demonstrational renovation, Kierling (built between 1977 and 1979) tests the possibilities of a renovation in passive house standard in technical, organizational and financial terms as an outstanding example of a comprehensive renovation.

Haus der Zukunft

e80^3-Buildings - "reconstruction concepts towards energy plus house standard with prefabricated active roof and facade elements, integrated home automation and network integration"

The project aims for highly-efficient renovation of existing buildings and settlements in urban areas. The main focus are buildings that were built between 1950 and 1980.

Haus der Zukunft

BIGMODERN - Subproject 8: Demonstration building Amtshaus Bruck - Realisation

In the frame of the flagship project BIGMODERN the "Amtshaus Bruck an der Mur" had been renovated according to above-average quality standards concerning energy efficiency and sustainability while complying with an industrial management point of view.

Haus der Zukunft

BIGMODERN Subproject 3: Demonstration building University Innsbruck - Main building of the Faculty for Technical Sciences - Planning process

Demonstration of feasibility of renovation of an official building in high thermal and energetical quality and consideration of further sustainable criteria.

Haus der Zukunft

Urban consolidation Lehen

The key project "Stadtumbau Lehen" ("urban consolidation Lehen") coordinates several projects at the urban district of Lehen, with the purpose of the raise in energy efficiency and safekeeping of a sustainable development. Four builder (ten teams of architects), two scientifically institutions, the town of Salzburg and two attended departments of the land are working together.