Suchergebnisse für "Factsheet: Energietechnologien gestalten, die für alle sinnvoll und nutzbar sind"

Haus der Zukunft

"gugler! build & print triple zero" - subproject 9: Monitoring Gugler - Monitoring, evaluation, optimization GUGLER

The project objective is the measurement of relevant building values (energy consumption, ...), the evaluation of these values compared with the intended objectives and the optimization of the system based on the measured data. As a special innovation, monitoring the storage of alternatively generated electricity using photovoltaic and wind energy in the form of compressed air must be considered.

Haus der Zukunft

Urban consolidation Lehen - Subproject 1: Fundamental study for an intelligent e-monitoring

The goal was to refine the energy monitoring for residential buildings as well as to find possibilities to visualise the energy consumption and continuously compare it with the "target consumption" in order to get a signal in time and thereby to be able to communicate it to the users. Different monitoring systems were investigated and the experience was evaluated.

Stadt der Zukunft

Digital Twin / Building Tracker - Coupling of building simulation with a physical building in real time

The goal of the project ist o couple an office building during operation with its virtual twin, the "building tracker", which will be developed and applied for the first time within the project. Thanks to coupling of monitoring and simulation, innovative building energy management of nearly zero-energy building is possible.

Haus der Zukunft

Using buildings as energy storage - Monitoring project: Detached house H and detached house F Energy source wind power – Energy source solar power

Monitoring and comparison of performance of thermally activated building components in two similarly built, inhabited detached houses with different energy sources (wind and solar power). The functionality of energy supply through wind power or solar energy will be investigated as well as the verification of the practicability of self-regulating system control due to building temperature behaviour. The results provide an insight into the calculation assumptions, system control and feasibility of the smart grid technology.

Haus der Zukunft

Poly2Facade - Innovative thermal self-regulating solar facades by means of functional polymers

The overall objective of the present project is to develop and implement an optimal overheating protection system based on polymeric materials. The aim is to reduce maximum room temperatures in buildings caused by facade integrated solar-thermal collectors in stagnation.

Haus der Zukunft

ECR Energy City Graz - subproject 3: +ERS - Plus Energy Network Reininghaus Süd

The multifunctional neighbourhood "+ERS - Plus Energy Network Reininghaus Süd" was realized within the urban planning area of Graz-Reininghaus. The project aims to optimize the energy concept of the single buildings as well as of the building cluster in order to achieve a plus-energy standard within the residential neighbourhood.

Haus der Zukunft

Gründerzeit with future - demonstration project 1: David´s Corner

High value energy efficient refurbishment of an ensemble of three neighbouring Wilhelminian style buildings in a non-lucrative location.

Haus der Zukunft

BIGMODERN - Subproject 9: Demonstration project University Innsbruck, Faculty for Construction Engineering - Implementation

The demonstration project University Innsbruck, building of the faculty for construction engineering is part of the flagship project BIGMODERN. The demonstration project shows that in major renovation projects high energy and sustainability performance can be achieved using economically viable solutions.

Haus der Zukunft

Urban consolidation Lehen - Subproject 2: Development - intelligent E-Monitoring

In the oppositional subproject 2 technical and organisational requirements for the transformation of the innovative Smart Metering-concept will be developed. Through the connection of the application of Smart Metering with an active integration of the inhabitants over mutual communication the concept, which is planned for the key project Urban Consolidation Lehen stands out of other comparable antedated activities.

Haus der Zukunft

RENEW SCHOOL Austria: Examples and financing models for school renovations

The project aimed at learning from 14 Austrian school buildings, from their financial and cooperation models, meaning successful cooperation between involved parties. The success factors have been derived from these projects and together with 10 best practice schools been published in a brochure. The project supported the Austrian activities in the IEE EU-Projekt RENEW SCHOOL (www.renew-school.eu).

Haus der Zukunft

EDEN - Developement of a structured data and preparation documentation with a minimized error-proneness for energy performance cerificates.

Current energy performance certificates hold major flaws. Therefore, the presented research initiative aimed at the development of a standardized and easy-to-use, generic Input-Data-Documentation, which ensures the quality of energy certificates for all involved stakeholders. During the development, the documentation had been conducted and for a chosen sample of representative buildings, which is expected to demonstrate the high potential of such a development.

Haus der Zukunft

Kierling passive house - heading into the future sustainably

Using the example of demonstrational renovation, Kierling (built between 1977 and 1979) tests the possibilities of a renovation in passive house standard in technical, organizational and financial terms as an outstanding example of a comprehensive renovation.

Haus der Zukunft

BIGMODERN Subproject 7: Monitoring concept

Development of a pattern for comprehensive documentation of the project results. The concepts contain amongst others monitoring of energy consumption, resources, costs, functionality and comfort, etc.

Haus der Zukunft

aspern Vienna´s Urban Lakeside - subproject 6a: Energy Consumption Monitoring

This subproject of the flagship project "aspern plus" derived the basis for a centralised monitoring of the energy consumption in Seestadt aspern.

Haus der Zukunft

smartEXT - extended application boundaries for proven passive house technology

The present study aims to explore the application options for compact units (ventilation devices including micro heat pumps, developed for passive houses) in low energy buildings. Compact ventilation units for heat recovery, heating and domestic hot water shall bear the basic heating load, whereas peak loads shall be covered by newly-developed auxiliary heating equipment combined with intelligent control algorithms. This allows increased energy efficiency as well as cost effectiveness together with higher living quality and lower ecological load.

Stadt der Zukunft

Analysis of the high-quality wooden facade in extreme climates

The project "Alpine base Schiestlhaus on the Hochschwab, which was opened in 2005, represents a lighthouse project for the "House of the Future" programme as the 1st shelter in zero-energy house quality. After more than 15 years in operation, however, damages came to light. Within the framework of this project, analysis activities were carried out on the cause of damage as well as the development of new facade structures.

Haus der Zukunft

monitorPlus. Monitoring of pilot projects of the Austrian RTD-program Building of Tomorrow Plus

All pilot projects of "Building of Tomorrow Plus" had to be evaluated in a common monitoring project on energy efficiency, user's acceptance, and the integrated building performance. monitorPlus documented and assessed the results of this evaluation.

Haus der Zukunft

aspern Vienna´s Urban Lakeside - subproject 5: Monitoring of Energy Consumption in Demonstration Buildings in Seestadt Aspern

Goal of the project is to develop a monitoring tool that allows to predict the expectable (final) quality of the residential buildings based on decisions made during the planning and construction phase. For this purpose, the current certification tool for the determination of "TQB-points" will be equipped with "interim" certifications, which shall allow the land developer to carry out a quality monitoring parallel to the construction phase. The tool will be tested with the data obtained from selected construction projects during the first residential development phase in seestadt aspern.

Haus der Zukunft

Monitoring Sunhouse Eferding

In course of the monitoring project the effectiveness of the energy-technical system was checked on the basis of running measuring data. The data were evaluated and, if required, the arrangements and settings of the control system were adapted. Main result is that the energy balance could have been improved explicitly whilst the monitoring process.

Haus der Zukunft

BIGMODERN - Subproject 10: Evaluation, Documentation and Ensuring Transferability

The subproject 10 is part of the flagship project BIGMODERN. It is based on the results of subproject SP 7 in which a monitoring concept has been developed. This concept is now implemented through monitoring of different aspects occurring during the first two years of operation of both BIGMODERN demonstration buildings.