Search results
There are 927 results.
Build to satisfy: Modeling of user behavior in lowest and plus energy buildings: Consequences for building and comfort
Aim of the project was a better understanding and modeling of effects of user behavior on energy performance in office and service buildings, built with lowest energy building and plus-energy building techniques. The results support facility managers of office/service buildings and integrate gender and diversity issues.
Build4Climate - Demonstration building with a climate room concept at the Innovation Quarter Lavanttal in Carinthia
Near the Wörthersee in Carinthia a modern open-space research and office building with flexible use is being built on the site of Lakeside Science & Technology Park GmbH. The innovative building will be implemented as a frontrunner with a 'climate room' concept based on thermal component activation and extensive use of renewable energy sources.
BuildReUse ‐ 100 percent re‐use and recycling in buildings with short usage cycles
Some buildings, such as supermarkets or office buildings, are often demolished and rebuilt after a few years or at least have their interiors changed, turning large quantities of building components into waste. The BuildReUse project aims to develop circular economy concepts for these buildings and to promote the necessary change in the construction industry.
Building and modernising with "Building of Tomorrow"
The project BauModern turned to non-profit and commercial housing developers and real estate managements. In close co-operation with the federations of the housing and real estate economy has been achieved that builders are informed about market-suited innovative technologies and concepts and use these strengthened for their projects both in the new building and in the refurbishment.
Building of Tomorrow for the construction industry
Dissemination of results of the research initiative "Building of tomorrow" for two specific target groups - master builder and installer - implementation in further vocational training concepts
Buildings of highest energy-efficiency with integrated renewable energy development
For the future supply of energy services the combination of energy efficiency, energy storage and decentralized use of renewable energy in buildings offers itself. The project identified dynamic potentials of possible active and passive energy yields of construction units with use of renewable energy sources, pointed future solutions to energy-efficient and ecological design of building construction-units and united all results to a signpost: From today's passive house to the energy-plus-house of the future.
Business model innovations for rental and service models in the manufacturing sector
The project aims to contribute to a better understanding of the economic and ecological potentials of an implementation of lending and service models in the manufacturing sector in Austria and to show which changes and R&D efforts are necessary so that these can be realized by suitable business models.
CE4ALL – Circular economy for all – Incentives, enablers and inhibitors for sustainable consumption
Based on an analysis of current milieu-specific consumption behavior, the CE4ALL project aims to identify sector-specific incentives and enablers for strengthening the circular economy and to uncover inhibitors. Another focus of this work is the consideration of inclusion aspects. CE4ALL is working on a consumption-centered investigation beyond the previously production-oriented considerations of the circular economy.
CELL4LIFE - Reversible SOCs as a link between electricity, heat and gas networks to increase the self-sufficiency and resilience of neighbourhoods
A system consisting of a solid oxide fuel cell and a Machine Learning-based control system for increasing efficiency and minimizing degradation is being developed. As a link between all energy supply networks, the system is intended to increase the self-sufficiency and resilience of plus-energy districts.
CEPAM – Circular Economy Powder for Additive Manufacturing
In the CEPAM research project, a recycling process for high-quality metal powders for additive manufacturing is developed. Various methods of energy input are being evaluated for energy efficiency, scalability and powder quality and built up on a pilot scale. The recycled metal powder is characterized and processed in the Laser Powder Bed Fusion process. In order to compare the mechanical properties of the printed components, parts are printed from both new and recycled powder.
CHALLENGE - Highly efficient use of hot gas and waste heat in air/water heat pumps for plus-energy buildings and quarters
CHALLENGE aims to further develop the system concept for air-to-water heat pumps in such a way that they can be used efficiently and without the above mentioned negative effects in densely built-up urban areas. In concrete terms, validated simulations and a functional model of the overall system on a laboratory scale are to be used to demonstrate that the concept can save 10% of electrical energy, reduce the noise of outdoor units in summer to a minimum and prevent the formation of local heat islands.
CICA - Chlorella in circular aquaculture
Project CICA allows the detailed investigation of fish wastewater and its treatment by algae cultivation, as well as the design and construction of a special photobioreactor to purify wastewater and produce fish at the same time.
CO-MOD - Increasing comfort and energy efficiency through improved lighting and air quality in schools - implementation through modular EPC-models and ESCO-networks
In general local educational institutions such as schools and kindergardens have a high average demand for improved comfort and energy efficiency improvements. CO-MOD develops a flexible, modular concept (with provider networks, various financing options incl. "Grandmother"-Energy Services, contract modules) that can also respond to the individual circumstances of smaller objects.
CO2 neuBau - The CO2-neutral Construction Site: a Contribution to the Climate Protection by the Austrian Construction Industry
Identification of all direct and indirect CO2, respectively, GHG emissions generated at construction sites. Analysis of the framework conditions and technologies towards demonstrating the options for their control. In parallel, added values, such as cost-benefit advantages of a CO2-neutral construction site, were outlined and quantified.
CO2-Demobau - Exploration of the feasibility of carbon-neutral model construction sites
By highlighting green innovations, networking with stakeholders in the construction industry and applying the findings of the previous study "CO2 neutrale Baustelle", the foundation is set for future carbon-neutral model construction sites. These construction sites will serve as best-practice examples in the fields of contracting, construction operations organization and technology.
COOL-QUARTER-PLUS - GHG-neutral cooling of office and research quarters
Development of systems for the emission-neutral cooling of office, research and urban quarters on the basis of photovoltaic or geothermal energy supply and user integration. Life cycle cost calculations and analyses of grey and operational greenhouse gas emissions allow a holistic assessment.
COP5+ - Further development of a heat- and cooling system with seasonal heat storage at the example of Central Europe´s biggest geothermal depth drilling field
The aim was to increase the overall energy efficiency of Plus-Energy-Houses by making the heat excess of summer available for use in winter. This was carried out by improvements of the technology seasonal heat storage to an intelligent overall system. The biggest geothermal depth drilling field in Central Europe has been established.
CPC-lightweight construction collector
On the basis of our relieable CPC-collector SOLARFOCUS S1 we develop the CPC-lightweight construction collector to get more material efficiency and maximum output of solar hightemperature energy.
Can sustainable building be realized at reasonable costs?
At the development "residential Passive House Utendorfgasse" were reached very low building costs. Would there be different building costs by using ecological materials and technologies? There will be calculated additional and reduced costs by using the ecological building-catalogue and internal characteristic values of projects that are similar in design.
Candles, based on regional, renewable raw-materials
Feasibility study of candles based on growing again, regional raw materials, corresponding to todays market demands and produced with current production techniques.